Project management, program development, and program life-cycle

Slides:



Advertisements
Similar presentations
INFORMATION TECHNOLOGY
Advertisements

EDEXCEL LEVEL 2 BTEC FIRST DIPLOMA FOR ICT PRACTITIONERS
ICT Class System Life Cycle.  Large systems development projects may involve dozens of people working over several months or even years, so they cannot.
Project Stages. Stages Planning Initial Data Collection Situation Evaluation Solution Definition Implementation of Solution Conclusion.
Chapter 12 Systems Development Three common methods for MIS development: The systems development life cycle (SDLC) Prototyping End-user development Five.
Deployment and Mobility of Software Software architecture must eventually be “realized” ---- that is –a) implemented and – b) deployed Deployment is the.
1 Introduction to System Engineering G. Nacouzi ME 155B.
Problem with Software Requirements are complex The client does not know the functional requirements in advance Requirements may be changing Technology.
SYSTEM ANALYSIS AND DESIGN
CORE 1: PROJECT MANAGEMENT Understanding the Problem.
Product Analysis: Intro Product life cycle Product portfolio Branding.
A-LEVEL ICT A2 Course Introduction. Course Structure % Weighting ASA2 G061 Information, Systems and Applications6030 G062 Structured ICT Tasks4020 G063.
THE SYSTEMS LIFE CYCLE ANALYSE DESIGN IMPLEMENT MAINTENANCE IDENTIFY/INVESTIGATE.
LESSON 8 Booklet Sections: 12 & 13 Systems Analysis.
Chapter 8: Systems analysis and design
SE-02 SOFTWARE ENGINEERING LECTURE 3 Today: Requirements Analysis Requirements tell us what the system should do - not how it should do it. Requirements.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
Project Life cycles BTEC National.
AS Level ICT Evaluation of ICT-related solutions.
Leaders in Asset Management Big Plans for your Property System? How to plan for a Property System Project Prepared by: Yudiann Carlo, CPPS
 Once the system has been installed it will be monitored to check whether it is working correctly. Sometimes problems with a system will not be found.
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
Systems Analysis and Design
Systems Life Cycle. Know why it is necessary to evaluate a new system Understand the need to evaluate in terms of ease-of- use, appropriateness and efficiency.
OHTO -01 SOFTWARE ENGINEERING LECTURE 3 Today: Requirements Analysis Requirements tell us what the system should do - not how it should do it.
Prototype 3 Prototype 2 Prototype 1 PROTOTYPIN G
Project roles and responsibilities
Anjanae Brueland & Janet Wingard.  What is Network Design, Planning & Management?  System Development Life Cycle (SDLC)  The phases of an information.
Week 1 -Introduction IT2005 System Analysis & Design.
Teaching slides Chapter 3
G063 – Prototyping. Learning Objective: At the end of this topic you should be able to: describe prototyping as a software development methodology.
Software Project Management
Testing and Evaluating Software Solutions Introduction.
GCSE ICT 3 rd Edition The system life cycle 18 The system life cycle is a series of stages that are worked through during the development of a new information.
1.3.5 Marketing strategy - cartoon
Six Steps To Problem Solving A simple systematic approach to problems and issues faced by students By MK NKWANE g15N7271 TUESDAY GROUP.
Product Life Cycle. Product life cycle Growth Introduction Decline Maturity.
MANAGEMENT INFORMATION SYSTEM
Product life cycle The stages through which a product passes form its development to being withdrawn from sale; the phases are research and development,
AS Level ICT Analysis. Analysis is the process of breaking down a problem into small parts so that it is easier to understand and therefore easier to.
Product life cycle Hodder & Stoughton © 2017.
Unit 6 Application Design Sample Assignment.
INTRODUCTION.
Introduction to System Analysis and Design
Gary Hughes, South Oakleigh College
System Development Life Cycle (SDLC)
Software Development Life Cycle
Lecture 6. Information systems
System Development Life Cycle (SDLC)
Algorithm and Ambiguity
Universal Systems Model
Methodologies For Systems Analysis.
NEW PRODUCT DEVELOPMENT
NEW PRODUCT DEVELOPMENT
Product Life Cycle Business Management.
Reviewing your final digital product
Chapter 13: Systems Analysis and Design
The Paper Table QUESTION:
Systems Analysis and Design
INSPIRE fitness for purpose – Analysis
System Development Life Cycle (SDLC)
IT2005 System Analysis & Design
CS310 Software Engineering Lecturer Dr.Doaa Sami
Implementation of ICT-related solutions
5 POINT PLAN THE SYSTEMS LIFE CYCLE ANALYSE DESIGN
(System Development Life Cycle)
Software Development Approaches
Requirement Analysis.
Information Systems Development (ISD) Systems Development Life Cycle
Six Steps to solve a Problem
Presentation transcript:

Project management, program development, and program life-cycle AS Level ICT Project management, program development, and program life-cycle Unit 1 Topic 2 - 02a - Project management, program development, and program life-cycle

The stages of project management There are five stages in the program development or software design process These are: Identify Analyse Design Implement Evaluate

The stages of project management Identify Although project management is a mainly linear process, feedback and design changes will often mean that steps in the process have to be revisited so that necessary changes can be incorporated Analyse Design Implement Evaluate

Identify What problems need to be solved? What solution is presently being used? Who will be using your system? What alternatives can be used? What objectives will your solution aim to achieve?

Analyse What software and/or hardware will be needed? How will any data used be collected? How will any data used be selected? How will data be entered? (Inputs) What processing will be required? (Processing) How will information be displayed? (Outputs) N.B. The Identify and Analyse stages are sometimes merged into a single stage

Design Does the initial paper design match the users’ needs? Has the user given any feedback on the initial design? Can any necessary design changes be incorporated? How will the design be tested?

Implement What processes have been gone through to implement the design? Has the design been tested thoroughly after it has been implemented? Have any design changes been required? Have any design changes been implemented?

Evaluate Does the final design match the original requirements? What problems needed to be overcome? What solutions were used? Has the user given any feedback on the final design? Can any necessary design changes be incorporated? What further improvements and/or upgrades could be made to the final design?

Life-cycle Once a project has ended it is not the end of the program’s life-cycle As the program is used, users will need it to be developed and revised as their needs change This process will continue until a new program is introduced to replace the original program, at which point the original program will have reached the end of its life-cycle

Life-cycle Maturity Decline Growth Introduction Development

Life-cycle Development – the product is developed and tested prior to being launched (project management/program development stages) Introduction – the program passes into general operational use Growth – the number of users grows Maturity – the number of users reaches its highest level Decline – new programs become available and the existing program is considered for replacement

Extended life-cycle It is possible to extend the life-cycle of a program by using feedback from users to continue program development beyond the end of a project However no program’s life-cycle can be extended indefinitely, and eventually it will be withdrawn from general use and the developers will withdraw help and support

Project management, program development, and program life-cycle AS Level ICT Project management, program development, and program life-cycle Unit 1 Topic 2 - 02a - Project management, program development, and program life-cycle