Semantic Model Workgroup Status

Slides:



Advertisements
Similar presentations
1Copyright © 2009, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Irvine, CA - PWG F2F Meeting April 29,
Advertisements

1 Copyright © 2012 The Printer Working Group. All rights reserved. IPP Working Group Session August 7, 2012 Redmond, WA PWG F2F Meeting.
1 Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report IPP Working Group 14 October 2009 Cupertino, CA - PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August 14, 2008 Camas, WA PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. Workgroup for Imaging Management Solutions Workgroup Session Printer Working Group/WIMS.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report WIMS/CIM Working Group February 7, 2008 Irvine, CA PWG F2F Meeting.
1Copyright © 2007, Printer Working Group. All rights reserved. PWG Plenary Status Report WIMS/CIM Working Group December 12, 2007 Austin, TX PWG F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1 IPP Working Group Session 18 August 2009 Redmond, WA - PWG F2F Meeting.
1 Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report IPP Working Group 10 February 2010 Scottsdale, AZ - PWG F2F Meeting.
1 Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report IPP Working Group 9 December 2009 Austin, TX - PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report WIMS/CIM Working Group February 7, 2008 Irvine, CA PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report IPP Working Group 19 August 2009 Redmond, WA - PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1 Copyright © 2009, Printer Working Group. All rights reserved. 1 IPP Working Group Session 14 October 2009 Cupertino, CA - PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report IPPv2 Working Group 18 February 2009 Waikoloa, HI - PWG F2F Meeting.
1 Copyright © 2010, Printer Working Group. All rights reserved. IPP Working Group Session 10 February 2010 Scottsdale, AZ - PWG F2F Meeting.
1Copyright © 2013, Printer Working Group. All rights reserved. Semantic Model Working Group Agenda February 6, 2013 El Segundo, CA PWG F2F Meeting Daniel.
1Copyright © 2012, Printer Working Group. All rights reserved. Semantic Model Meeting Logistics The documents and schema used are available from the SM.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2010 Lexington, KY PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August, 2010 Bagsværd, DenmarkPWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February 7, 2008 Irvine, CA PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2011 Camas, WA PWG F2F Meeting.
Semantic Model Meeting Logistics
PWG Plenary Status Report MFD Working Group
PWG Plenary Status Report Semantic Model Working Group
PWG Plenary Status Report MFD Working Group
PWG Plenary Status Report MFD Working Group
OGSA Data Architecture Scenarios
Printer Working Group Plenary Session
HARQ Ad-Hoc Report IEEE Presentation Submission Template (Rev. 9)
IPP Workgroup Session, Day 1
IPP Workgroup Session, Day 1
IPP Workgroup Session, Day 1
PWG Plenary Status Report MFD Working Group
Semantic Model Working Group
Semantic Model Workgroup
PWG Plenary Status Report Workgroup for Imaging Management Solutions
The Printer Working Group
IPP Workgroup Session, Day 1
Web-based Imaging Management System WG
PWG Plenary Status IPPv2 Working Group
Semantic Model Workgroup
IPP Workgroup Session, Day 1
Semantic Model Workgroup Status
Web-based Imaging Management System WG
Semantic Model Workgroup
Semantic Model Workgroup
PWG Plenary Status Report MFD Working Group
Plenary Status Semantic Model Workgroup
Semantic Model Workgroup
Semantic Model Workgroup
Web-based Imaging Management System Working Group - WIMS
Web-based Imaging Management System Including CIM Realignment
Semantic Model Workgroup
Semantic Model Workgroup
Semantic Model Working Group
IPP Workgroup Session, Day 1
Regional Haze SIP Status Report
IPP Workgroup Session, Day 1
IPP Workgroup Session, Day 1
IPP Workgroup Session, Day 1
IPP Workgroup Session, Day 1
Semantic Model Working Group
IPP Workgroup Session, Day 1
Semantic Model Working Group
IPP Workgroup Session, Day 1
Semantic Model Working Group
IPP Workgroup Session, Day 1
Web-based Imaging Management Service WIMS Working Group
Semantic Model Workgroup Session
Presentation transcript:

Semantic Model Workgroup Status The Printer Working Group Semantic Model Workgroup Status May 2, 2017 Copyright © 2017 The Printer Working Group. All rights reserved. The IPP Everywhere and PWG logos are trademarks of The Printer Working Group. 1

SM: Charter By the last approved SM Workgroup charter, the primary function of the Semantic Model workgroup was to update the Semantic Model and keep it current the to reflect the changes and additions to IPP. Attempts to do this by tracking the IPP IANA registry were time consuming and largely unsatisfactory, partially because of continuing update to the registry and partially because of lack of interest. The creation of a regtosm tool by Mike Sweet, and the successful generation of a Print3D Service model from registry information using this tool demonstrated that, to the extent that a Semantic Model representation of IPP attributes was necessary, it could be better done by automatic derivation from the IPP registry data. This derivation task reasonably falls to the IPP workgroup. Copyright © 2017 The Printer Working Group. All rights reserved. The IPP Everywhere and PWG logos are trademarks of The Printer Working Group 2

SM: Resolution Therefore, the SM Workgroup is no longer needed for its primary chartered function, and is to be put into an ‘hibernation’ state until some other appropriate function is identified by the PWG membership. The remaining wrap-up tasks for the workgroup are: Resolving the status of the JDFMAP document, which has been dormant, by proceeding to release it as a Best Practices Informational document. Putting incomplete work in a recoverable state, should there been reason to readdress it in the future. Settling on a revised charter reflecting the state of the workgroup These tasks are scheduled to be addressed in a May 4 morning session of this PWG Virtual Face-to-Face meeting. The SM3 mail list and the SM3 directory in the PWG site will be retained for the foreseeable future. However, no future conference calls have been scheduled or are anticipated. Copyright © 2017 The Printer Working Group. All rights reserved. The IPP Everywhere and PWG logos are trademarks of The Printer Working Group 3