PSB rf Foreseen limitations with 2 E13 p at 2 GeV

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

Muon Coalescing 101 Chuck Ankenbrandt Chandra Bhat Milorad Popovic Fermilab NFMCC IIT March 14, 2006.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
22/03/1999A.Blas1 Hollow bunches A. Blas, S. Hancock, S. Koscielniak, M. Lindroos, F. Pedersen, H. Schonauer  Why: to improve space charge related problems.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
Requirements for the PS/PSB TFB board 1 Alfred Blas Working group meeting - 07 December Sampling frequency 2.Required Delayed Clocks.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
Beam Manufacture in PS2 M. Benedikt, S. Hancock. LHC Beams in the PS by 2015 Typeh injε l inj [evs] h ejN bunch ej RF ej [MHz] ε l ej [evs] τ ej [ns]
L4-PSB working group meeting 25/06/2009
Status of the PS TFB Hardware Overview Machine results To be done
402.5 MHz Debunching in the Ring
Alternative/complementary Possibilities
Alternative/complementary Possibilities
Plans for ions in the injector complex D
Status and prospects of VEPP-5 Injection Complex
Linac possibilities for a Super-B
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
Tomography at Injection in the PSB
PSB rf manipulations PSB cavities
Discussion on Emittance Evolution through FCC-e+e-
Upcoming longitudinal MDs
PSB Injection scheme in the Linac 4 era
New AD Production Beam in the PSB
Injector Chain General and more about p-RCS
Overview Multi Bunch Beam Dynamics at XFEL
Progress towards Pulsed Multi-MW CERN Proton Drivers
The LHC25ns cycle in the PS Triple splitting after 2nd injection
New PSB beam control rf clock distribution
PSB magnetic cycle 160 MeV to 2 GeV
Introduction to LHC beam production in PSB and PS
A Design Study of a Compressor ring for
Beam dynamics requirements after LS2
Damping Ring parameters for the new accelerating structure
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring
Generation of Higher Brightness Beams for LHC
Explanation of the Basic Principles and Goals
PSB magnetic cycle 900 ms MeV to 2 GeV
PSB – Linac 4 Interfacing
Damping Ring parameters for the new accelerating structure
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
PSB rf Power limitations with Linac4
Damping Ring parameters with reduced bunch charge
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
JLEIC Ion Integration Goals
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
JLEIC 200 GeV ion beam formation options
JLEIC Main Parameters with Strong Electron Cooling
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

PSB rf Foreseen limitations with 2 E13 p at 2 GeV PS TFB PSB rf Foreseen limitations with 2 E13 p at 2 GeV BASIC CONSIDERATIONS Present performance: 1E13p from 50 MeV to 1.4 GeV in 490 ms (1.2s cycle) New Goal: 2E13p from 160 MeV to 2 GeV in 325 ms (0.6s cycle). 0.9s and 0.6s cycle data obtained from Alan and José (actual MD values) 36% more energy increase in 66% of the initial time, means roughly an average* rf power multiplied by two (1.36/0.66) together with a 3% frequency increase. *Average means average during the acceleration itself; an increase of a super-cycle duty cycle needs to be taken into account for the power cooling system A. Blas PSB RF 2GeV 10/03/2010

PSB rf Foreseen limitations with 2 E13 p at 2 GeV PS TFB PSB rf Foreseen limitations with 2 E13 p at 2 GeV Implications for the PSB low-level rf: 1.4 GeV : FREV = 1.75 MHz, FS = 446 Hz (h1,8kV) 2 GeV : FREV = 1.81 MHz, FS = 256 Hz (h1,8kV) The increase of FREV has no impact on the beam control The increase of B (8671 -> 11273 Gauss) requires having a B train counter well dimensioned (>17 bits). The 0.6 s cycle is very likely to require a zero flat-top duration and thus a zero duration synchro (no theoretical problem but may be processing power limitations!?) The change of FS (1680 Hz at 160 MeV, 256 Hz at 2 GeV (h1/8kV)) might require loop parameters to be programmed as functions (not constant)… may be this already the case !? (to be checked with Maria-Elena) Short cycles might reduce the time reserved to download the rf parameters into the beam control system and calculate the GFA functions (to be checked with Maria-Elena and Andy) A. Blas PSB RF 2GeV 10/03/2010

PSB rf Foreseen limitations with 2 E13 p at 2 GeV PS TFB PSB rf Foreseen limitations with 2 E13 p at 2 GeV Implications for the PSB transverse feedback: Beam current multiplied by 2.07 => required power multiplied by 4.3 The increased beam rigidity (+ 30% from 1.4 to 2 GeV) doesn’t play a role except for blow-up purposes… nevertheless a multiplication by 8 of the power is foreseen! A. Blas PSB RF 2GeV 10/03/2010

PSB rf Foreseen limitations with 2 E13 p at 2 GeV PS TFB PSB rf Foreseen limitations with 2 E13 p at 2 GeV Compromise at low energy: High intensity high space charge must increase emittance (painting) must keep high acceptance => φS small (for same rf voltage) must prolong acceleration => good for dipole power supplies + good for rf power. To have a faster cycle => increase rf voltage… and the rf power by the same amount A. Blas PSB RF 2GeV 10/03/2010

PSB rf Foreseen limitations with 2 E13 p at 2 GeV PS TFB PSB rf Foreseen limitations with 2 E13 p at 2 GeV Summary: RF power is a function of the acceleration time: the longer the acceleration the lower the power RF power is a function of the beam current: the higher the current, the higher the required power. RF voltage is a function of the acceleration duration: the faster the acceleration, the higher the voltage for the same acceptance. We can either specify tough constraints for the rf power taking into account the most ambitious beam, or set lower constraints and foresee cycles lengths as a function of the intensity. A. Blas PSB RF 2GeV 10/03/2010

PSB rf Foreseen limitations with 2 E13 p at 2 GeV PS TFB PSB rf Foreseen limitations with 2 E13 p at 2 GeV What can be supplied to the task force: rf power specifications for the possible most demanding beam (2E13p, 2 GeV, 0.6 s) Lessen rf power specifications with cycle lengths as a function of the intensity (1.2 s for 2E13p, 2 GeV),(0.6 s for <1E13p, 2 GeV)… More specifically from Mauro: how could this be made Information needed: Max Bdot of the new power supply (likely to be > 35.7 G/ms = 27.5 (present max) * 11273/8671 A. Blas PSB RF 2GeV 10/03/2010

PSB rf Foreseen limitations with 2 E13 p at 2 GeV PS TFB PSB rf Foreseen limitations with 2 E13 p at 2 GeV New Requirements: 2E13 p per ring (maximum intensity injected from Linac 4) instead of 1E13p as presently. 2GeV maximum kinetic energy at extraction (1 and 1.4 GeV also available) Cycle durations: 1.2 , 0.9 and 0.6 s 1.2s => inj=C275, flat-top=C765, ej=C805 => acceleration=490ms, flat-top=40ms 0.9s => inj=C175, flat-top=C575, ej=C615 => acceleration=400ms, flat-top=40ms (info A. Findlay) 0.6s => inj=C46, flat-top=C389=ej => acceleration=343ms, flat-top=0ms (info J.L. Sanchez) A. Blas PSB RF 2GeV 10/03/2010

PSB rf Foreseen limitations with 2 E13 p at 2 GeV PS TFB PSB rf Foreseen limitations with 2 E13 p at 2 GeV 1.4 GeV parameters w LINAC 2 1.2 s cycle 0.9 s cycle 0.6 s cycle C inj 275 175 C start flat-top 765 575 600 C extraction 805 615 Acc. duration 490 400 325 Flat-top duration 40 Max Bdot 22 G/ms between C555 and C635 27.5 G/ms between C360 and C465 A. Blas PSB RF 2GeV 10/03/2010

PSB rf Foreseen limitations with 2 E13 p at 2 GeV PS TFB PSB rf Foreseen limitations with 2 E13 p at 2 GeV 160 MeV 1 GeV 1.4 GeV 2 GeV B [Gauss] 2311 6867 8671 11273 Frev [MHz] 0.992 1.67 1.75 1.81 γ 1.17 2.06 2.49 3.13 FS [Hz] h=1 / 8kV 1680 645 446 256 Beam current H1 value for 2E13p Dipolar field; Present power supply limitations: 1.2 T/s -> 2.7 T/s (max value) => 65 ms 2.7 T/s -> 0 T/s => 135 ms A. Blas PSB RF 2GeV 10/03/2010

Beam loading in cavities PS TFB Beam loading in cavities A. Blas PSB RF 2GeV 10/03/2010