Supplier Webinar: IBM PCD Data Collection Process Changes & New Version of IBM’s Product Content Declaration(PCD) Form February 21 and 26, 2019 This.

Slides:



Advertisements
Similar presentations
© NHS Institute for Innovation and Improvement, 2012 Baseline Data Collection Guide for Project Managers and Facilitators updated Feb 2012.
Advertisements

Broker Portal ECF Enhancements Screen Navigation Walkthrough Please progress through the walkthrough by clicking your mouse button following each informational.
1 FP7SESAMFORCE Reporting Tools Access through the Participant Portal Reporting Tools Access.
Program Management Portal: Overview for the Client
Cal Grant GPA Submission Training – Non-SSN
How to get started RMA Portal ZEBRA TECHNOLOGIES March 19, 2015.
Payer User Group Webinar – 7/31/2014. Agenda Welcome (5 minutes) ◦Opening Comments/ Review ◦Meeting Goals Chapter 243 Changes (25 minutes) ◦Clarification.
1 “Establish immediately a mechanism, including an internet website, through which a resident of, or small business in, any State may identify affordable.
CCG Ordering Information 2014 For Questions, contact the Communications Analyst Alexandra Lazar
State of Kansas INF50 Excel Voucher Upload Statewide Management, Accounting and Reporting Tool The following Desk Aid instructs users on overall functionality.
April 1, Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. –Event number: –Event password: 2015B13 To hear.
Lead Management Tool Partner User Guide March 15, 2013
This PowerPoint has been produced for the public and is made available for non-commercial use (e.g. toolbox meetings,
IRPS 2013 Manuscript & Platform Presentation Submission Process Mark Porter 1 Amr Haggag 2 1 IRPS 2013 Presentations Chair, Medtronic 2 IRPS 2013 Audio-Visual.
PearsonAccess April 14, PearsonAccess – Agenda Order Tracking Additional Orders Student Data Upload (SDU) files New Student Wizard Online Testing.
Windchill PCS Overview Product Cost System Overview for Purchasing 03Sep2008.
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
1 TOWER CONSTRUCTION NOTIFICATION SYSTEM ENHANCEMENTS March 30, :00 PM Room 6-B516 of the Portals II Building 445 Twelfth Street, SW Washington,
An agency of the European Union EudraCt – Results Webinar # 1 Presented by Tim Buxton on 20 January 2016 IT Service Strategy Manager, IT Operations.
To the Unit Agreement Exhibit A Unit Tract Revision Online Training Course The purpose of this course is to provide guidance and information to ETS clients.
Page ADP PearsonAccess Proctor Training. Page Agenda Test Overview Testing Components Proctor Roles and Responsibilities Overview Administering the Test.
American Diploma Project Administrative Site Training.
Easy Chair Online Conference Submission, Tracking and Distribution Process: Getting Started AMS WMC and AMS Annual Conferences Click on play to begin show.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
Online Submission and Management Information -- Authors
Hazardous Waste Import-Export Final Rule Requirements and Implementation December 12, 2016.
eIRB Training IRB Committee Members
Meeting Housekeeping/Highlights
Systems Development Life Cycle
Helping Yourself in PD2 SPS Spotlight Series July 2015.
Event Objectives Become Familiar with Clairvia Web
Cisco Public Sector Contract Sales Reporting Web Portal
Section 236 Program Year End Requirements Excess Income Reporting Annual Certification of Use (ACU) (for Retained Excess Income) Annual Certification.
REACH 2018 Find your co-registrants and prepare to register jointly.
Partner Smart Assist Service
Supplier Profile Key Data
Required Data Files Review
To the ETS – PNG Continuation: Online Training Course
Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. Event number: Event password: 2015B13 To hear the presentation.
Website Booking & S/I/ VGM
ERO Portal Overview & CFR Tool Training
SmartLaborII Supplier Training Overview October, 2016.
To the ETS – Agreement Management Online Training Course
Program Management Portal (PgMP): What’s New in Release 16.1
Supplier Training Overview February 2018
Jessica Dare, Principal Consultant
HR Technology Support – EIB Training
Orders & Shipment Tracking
Supplier Training Overview
Results-Driven Priorities Application Training
ETS Submission Process for New Project Applications
North Carolina’s Transition to CMDP
CSDR Submit-Review Website Submitter Guide
Prizes and Awards (PandA)
Indicator 13, Secondary Transition IEP Record Reviews
SQA01 Guidance Material: FAI Review
To the ETS – Encumbrance Online Training Course
eSRA in Cognos – An Overview
Online Training Course
Discipline Incidents Collection
To the ETS – PNG Continuation: Online Training Course
To the ETS – Agreement Management Online Training Course
To the ETS – Encumbrance Online Training Course
Executive Project Kickoff
CFR Enhancement Session
Hire Xpress User’s Training A Human Resources guide to Hire Xpress
Using the AIM Alternative Testing Module (for Instructors)
NC electronic Vendor Portal
Grant Agreement Preparation
Presentation transcript:

Supplier Webinar: IBM PCD Data Collection Process Changes & New Version of IBM’s Product Content Declaration(PCD) Form February 21 and 26, 2019 This Package is a summary for discussion purposes only and should not be considered legal advice. The onus is on you and your business, legal and product compliance teams to review the actual Regulation and Standards and interpret them for your business. 18 July 2019

Agenda IBM Product Content Declaration(PCD) Data Collection Process Process Overview and Changes Transition Schedule Supplier Information New PCD Revision Summary of Changes PCD Form Overview and Sequence of Completion In-depth Look at PCD Changes Summary and Key Messages 18 July 2019

Agenda IBM Product Content Declaration(PCD) Data Collection Process Process Overview and Changes Transition Schedule Supplier Information New PCD Revision Summary of Changes PCD Form Overview and Sequence of Completion In-depth Look at PCD Changes Summary and Key Messages 18 July 2019

IBM PCD Process Transition What is Changing The IBM Process is being called the Material Declaration (MD) Process. IBM to take over role of MD Analyst from WSP. MD Analysts will be located in IBM Singapore reporting to Wen Wei Low. IBM Engineers will request PCD’s internally using a new tool that will replace the WSP Graphical User Interface (GUI). MD Analysts will use a new tracking tool called iSupport. Error Summary tab is being added to PCD to make it easier for Suppliers to correct critical errors in the PCD. One Functional Email address to submit PCD’s that were not specifically requested will be provided. What is not Changing Supplier expected to stay familiar with 46G3772 spec and remains responsible for content reporting. MD Analyst support team will handle the administrative validation of PCD’s as was being done by WSP. IBM Procurement Quality Engineer (PQE) responsible to review declarations made or not made in PCD and resolve technical questions with supplier. Suppliers expected to respond to requests in a timely fashion. Suppliers submit PCD prior to shipping parts to IBM or to IBM Contract Manufacturer. Suppliers expected to provide PCD for all IBM PN’s whether or not it was specifically requested. Supplier is expected to review the Error Summary Tab and not submit PCDs with errors. 18 July 2019

IBM PCD Data Collection Transition Schedule IBM commences PCD Processing Complete all open requests in WSP 4 Mar IBM Single Point of Contact for PCD Processing 22 Mar 31 Mar New Release of PCD 6/11/18 Rev 003 Use Only PCD 6/11/18 Rev 003 4 Mar 2 Apr 2019 17 Feb 24 Feb 03 Mar 10 Mar 17 Mar 24 Mar 31 Mar 7 Apr 2019 Today PCD Request Processing by WSP Today – 22 Mar PCD Request Processing by IBM 4 Mar and beyond Transition period for PCD Form 6/11/18 Rev 002 4 Mar to 1 Apr Use only PCD Form 6/11/18 Rev 003 2 Apr and beyond 18 July 2019

PCD Data Collection Process Transition Project – IT Tools & Help Support Functions IBM Data Collection Process Communication with Suppliers(e.g. MD/PCD request, questions etc.) & exchange of completed Material Declarations/PCDs Email from MD Analyst Team For suppliers who want to upload PCDs to the iSupport portal directly, please contact pcdsupp@sg.ibm.com. PCD Help Support IBM Global Procurement Information for Suppliers Website will include a link to a functional id (e.g. pcdsupport) for suppliers questions. Internal PCD & IT Tools Education Documentation will be available from IBM Communities and Product Lifecycle Management (PLM) websites. 18 July 2019

Supplier PCD Request Email From IBM MD Analysts 18 July 2019

Agenda IBM Product Content Declaration(PCD) Data Collection Process Process Overview and Changes Transition Schedule Supplier Information New PCD Revision PCD Summary of Changes PCD Transition Schedule PCD Form Overview and Sequence of Completion In-depth Look at PCD Changes Summary and Key Messages 18 July 2019

Summary of Changes for PCD Version 6/11/18 Rev. 003 Added a new “Error Summary” sheet to the PCD. Consolidates the critical and non-critical errors in a PCD to facilitate correction of errors prior to submission of a completed PCD. Error Summary Tab SVHC Reportable Tab Added a check for skipped/blank rows between rows of data. A critical error will be displayed if a row has been skipped. A critical error will prevent processing of the PCD. 18 July 2019

PCD Migration Timeline Mar 4, 2019 Release of PCD Version 6/11/18 Rev 003 Apr 2, 2019 IBM accepts only PCD Version 6/11/18 Rev 003 Mar 4 – Apr 1, 2019 PCD transition period IBM accepts both PCD Version 6/11/18 Rev 002 PCD Version 6/11/18 Rev 003 18 July 2019

Instructions Tab – Verify the Correct Form Version Check that the PCD Ver 6/11/18 Rev 003 (EC P44676) is used by the supplier. The version is shown in the Instructions tab of the PCD. . 18 July 2019

PCD Form Overview and Sequence of Completion PERMISSION FROM DOCUMENT OWNER DO NOT REPRODUCE WITHOUT 18 July 2019

PCD Form Overview and Sequence of Completion – Cont’d PERMISSION FROM DOCUMENT OWNER DO NOT REPRODUCE WITHOUT 18 July 2019

Error Summary Tab – New Tab In The PCD 1. The Data Summary (row 2) will show an error message if there are critical error messages in any other row. Error Summary Tab – With Critical Errors

Error Summary Tab – New Tab In The PCD 1. The Data Summary (row 2) will show ”OK” if there are no critical error messages in any other row. Error Summary Tab – With No Critical Errors

Error Summary Tab – Suppliers should review for errors prior to submitting 1. To review an error message, click on the hyperlink for more information on how to correct the message. 2. If all critical error messages are fixed, message in the Data Summary (row 2) indicates ‘OK’, this means the PCD can now be submitted. Error Summary Tab Click on the link beside each error message for more information on how to correct the message. 1 SVHC Reportable Tab 1 Supplier take action to correct the error. Error Summary Tab 2 Row 2 now shows ‘OK’, all critical errors have been corrected. 16 18 July 2019

Reportable SVHC Tab In the Reportable SVHC tab, if there are multiple rows of data to be declared, fill out the information in consecutive rows. DO NOT skip any rows. Skipping any row will result in an error message in the SVHC tab. A critical error message will be generated in the Error Summary tab. SVHC Reportable tab Error Summary tab 3 18 July 2019

Agenda IBM Product Content Declaration(PCD) Data Collection Process Process Overview and Changes Transition Schedule Supplier Information New PCD Revision Summary of Changes PCD Form Overview and Sequence of Completion In-depth Look at PCD Changes Summary and Key Messages 18 July 2019

Summary and Key Messages IBM cut-off dates for new requests to WSP are February 28 (standard TAT) and March 8 (expedited TAT) WSP will be working on closing PCD requests through March 22. Suppliers must complete all open WSP requests as soon as possible in order to avoid individual requests crossing over from WSP to IBM. Suppliers should start seeing requests from the IBM MD Analysts on and after March 4. When receiving a PCD request, if you are not the correct contact to handle the request, please inform the IBM MD Analyst that the contact information for your company has changed. Effective March 31, IBM MDAs will be the only point of contact for all PCD data collection and processing regardless of whether WSP was involved in the original request. Fundamental roles not changing: Supplier responsible for reporting and compliance MD Analyst requests, performs administrative validation and loads the PCD into IBM Systems. IBM PQE responsible to resolve technical questions with the supplier. New PCD form 6/11/18 Rev 003 will be made available on March 4 which includes an Error Summary tab that displays all error messages from the other tabs in the PCD. The old version of the PCD (Version 6/11/18 Rev. 002) will not be accepted after April 1. Suppliers should review the Error Summary tab and correct critical errors prior to submitting the PCD to IBM. 19 18 July 2019

Links to Key References Information for Suppliers webpage: https://www-03.ibm.com/procurement/proweb.nsf/ContentDocsByTitle/United+States~Information+for+suppliers Baseline Environmental Requirements for Supplier Deliverables to IBM (ES 46G3772): https://www.ibm.com/ibm/environment/products/especs.shtml IBM Product Content Declaration (PCD): https://www.ibm.com/ibm/environment/products/ecpquest.shtml IBM PCD Support: Email pcdsupp@sg.ibm.com for all PCD queries. 20 18 July 2019