PARK EAST CONSTRUCTION

Slides:



Advertisements
Similar presentations
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Advertisements

The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
Brad Willard Professional Painting Quality Service for Over 16 Years!
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Update on FCPS Construction/Renovation Projects August 2009.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
Newark CSD Phase II Capital Improvement Project Board of Education Report August 2013.
SUNY Canton Facilities Project Update Miscellaneous.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
Engineering Operations Outage Status: Post-run diagnostic calibrations have been completed and in-vessel work can start on PCHERS, FIDA, MPTS, and the.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
Elevations.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Job Order Contracting A Washington State Procurement Option
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
DER – Before, During and After: A Homeowner’s Perspective.
Frank c. havens elementary school CONCEPT DESIGN II Refinement of hybrid October 24, 2007 R. P. Gallagher Associates Structural Engineers.
Chard RFC Social Spaces – Refurbishment 2014 Phase 1 – Family Bar and New Entrance to the club 1.
Winchester Medical Center Campus Expansion June 21, 2011.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
2014 construction bond planning Needs assessment- what are we missing Site visits- in and out of district Safety concerns Life cycle evaluations- where.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
December 3, 2015 TOWN OF MILLBURY DPW, MA Robert McNeil, P.E., Director PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer This project.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Making Our Facilities Better Board of Directors Update – Wednesday, July 24, 2013.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
Construction and Transportation Update Bayside Demo: ▸ Cut and capped utilities ▸ Demolished appendage building on the waterfront ▸ Demolition continues,
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
White Pigeon Community Schools
April 2016 Bond / Facilities Update Presentation
TOBY ZACK DESIGNS LA MER
Assembly And Installation Of Ikea Kitchen Cabinets
Graduation Project 2 Redesigning a Villa
Troy School District 2013 Bond Program – Series 1 Construction Update September 2016 Barton Malow | TMP.
Organics Waste Processing Facility Construction Progress Update December 15, 2010
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
Hopewell Valley Regional School District
Troy School District Bond Program – Series 1 Construction Update
Value of contract: Length of contract: Contract start date:
Fruita Monument High School Entry Project
Lincoln Common Redevelopment Construction Update.
Building & Property Committee
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
No. 4 Wood Street, Mansfield
Capital Outlay Workshop
Project 2018 October 31, 2018.
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Recent Bond Accomplishments
Minuteman Vocational Technical Regional High School Progress
North Augusta High School – Phase 2A and 2B
Troy School District 2013 Bond Program – Series 1 Construction Update June 2016 Barton Malow | TMP.
Minuteman Vocational Technical Regional High School Progress
Community Practice Asset Management.
Moving from Consumers to Producers Kings Park Central School District
Proposed New Layout for Lobby Eagle Hospitality Interiors
Facilities Update Garden Grove Unified School District
Presentation transcript:

PARK EAST CONSTRUCTION Herricks Public School December Bond Update Report / Phase 2 PARK EAST CONSTRUCTION Prepared by Brian Costello

Herricks Public Schools Phase 2 Herricks High School Work Completed in the Month of December Stalco – Comfort Station Punchlist completed and reviewed by BBS Landtek – Grandstand and Site-work Decorative fencing completely installed Punchlist walk-though completed by BBS High School Cafeteria Oak sill installed on semi-round wall Pendant lights removed and reinstalled in metal ceiling tiles JVR punchlist completed and ready for BBS review Best Climate punchlist completed and reviewed by BBS WHM punchlist completed and reviewed by BBS Benchmark – Windows and Doors Installed windows and doors at elevation W5 – 90% Installed relocated W11 windows at W13 and doors at W8 – 90% Installed re-ordered windows at W10 – 100% Construction Progress Report December 2018

Herricks Public Schools Phase 2 Herricks High School Work to be Completed During the Month of January Grandstand/Site-work Punchlist to be completed by Landtek Cafeteria Nana-wall to be installed Stalco punchlist to be completed Bar Boy punchlist to be completed Windows and Doors Elevation W3 to be demo’d and rebuilt All remaining capping on previously built elevations to be installed All door hardware to be installed Construction Progress Report December 2018

Herricks Public Schools Phase 2 Herricks High School Sitework/ Grand Stand Landtek Construction Progress Report December 2018 Decorative fencing installed. Shotput slab repaired.

Herricks Public Schools Phase 2 Herricks High School Cafeteria Reconstruction Stalco Construction Progress Report December 2018 Oak sill installed on semi-round wall

Herricks Public Schools Phase 2 Herricks High School Cafeteria Reconstruction Pendant lights reinstalled in metal ceiling tiles Construction Progress Report December 2018

Herricks Public Schools Phase 2 Herricks High School Window and Door Replacement Benchmark Construction Progress Report December 2018 Elevation W5 90% installed

Window and Door Replacement Herricks Public Schools Phase 2 Herricks High School December 2018 Progress Report Window and Door Replacement Benchmark Windows from W11 installed at W13 Construction Progress Report December 2018

Window and Door Replacement Herricks Public Schools Phase 2 Herricks High School December 2018 Progress Report Window and Door Replacement Benchmark Doors from W11 installed at W9. No window work. Re-ordered windows installed at W10. Construction Progress Report December 2018

PARK EAST CONSTRUCTION CORP. December Manpower Report Herricks Phase 2 Work PARK EAST CONSTRUCTION CORP.

PARK EAST CONSTRUCTION CORP. December Manpower Report Window and Door Replacement PARK EAST CONSTRUCTION CORP.