Summary Tuesday h23: Machine closed. Precycle started.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC progress Report LHCC Wednesday 23 rd March 2011.
● Main goals for week 33: – Luminosity production; – First 150 ns bunch train attempts; – Roman Pots: check movement at 3.5 TeV, with 1b; – Off momentum.
● 08h00: Adjust mode for end-of-fill study. Scraping test for determining transverse beam profile (beam 2, vertical). As expected, beam dumped with BLM.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Ion Commissioning: Thursday & Friday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Summary week 31 Week 31 G. Arduini & O. Brüning
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Barbara Holzer, Jorg Wenninger
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Wed :40 Lost S78 - QPS controller.
Week 36 plan Todo’s: And also: 12+b injection.
Friday March 4th 08h32: Access for beam dump system.
Week 35 – Technical Stop and Restart
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Tuesday 9th November 10:02 Fill beams dumped
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday Fill 1364 (24 bunch) dumped at 07h
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Thursday – Morning Energy matching at injection with H CODs
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
07/08/2010 Fill #1264 dump at 02:14:38.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Wednesday h18: 228b fill lost just before start of ramp.
Thursday 20th July - morning
Another Immortal Fill….
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Daniel, Gianluca and Belen (for the Collimator team)
Monday 152 bunch operation summary
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Summary Tuesday 24.8. 06h23: Machine closed. Precycle started. 07h47: Problem with QPS OK on RB.A67 (worldFIP problem on the RB/RQD/RQF). Access for repair. Water problem with transverse damper. Access to P4. New transverse damper firmware for nominal bunch intensity (saturation problem). 11h05: Recovery from access. Trips of RSF2.A56B1 and RQTL8.L3B1. RF power: crowbar alarm on module 6B2 and 7B2. 13h02: Maintenance injetion lines (steering). Losses reduced by factor 2-3. 13h30: Injection into LHC. Injection phase +12 Hz on both beams. New injection scheme used: “1000ns_50b_35_14_35”. 15h39: Ramp started. Fill 1301. 17h35: Stable beams. 8:30 meeting

New filling scheme BI: Discrepancy between FBCT and BCT is not real: saturation problem. To be fixed. 8:30 meeting

Noise issue for tune feedback V H R. Steinhagen  follow-up from RF group would be helpful to understand this and minimize it 8:30 meeting

First time lumi above 10e31 (in CMS) 8:30 meeting

12 hour history Background in CMS appearing in middle of fill!? Max delivered: 350 nb-1 per experiment. 8:30 meeting

Fill 1301 6 hours of stable beams (so far) new filling scheme: 50b no long range encounters IPs: 1 5 2 8 - 1 5 8 - 1 5 2 - 1 5 - 2 8 - 8 giulia papotti (BE/OP/LHC)

Fill 1301 no Long Range interactions with Long Range IPs: 1 5 2 8 - 1 5 8 - 1 5 2 - 1 5 - 2 8 - 8 giulia papotti (BE/OP/LHC)

Fill 1298 IPs: 1 5 2 8 - 1 5 8 - 1 5 2 - 1 5 - 2 8 - 8 1 LR in 2 (33m) no Long Range interactions with Long Range IPs: 1 5 2 8 - 1 5 8 - 1 5 2 - 1 5 - 2 8 - 8 03.08.2010 giulia papotti (BE/OP/LHC)

Fill 1295 IPs: 1 5 2 8 - 1 5 8 - 1 5 2 - 1 5 - 2 8 - 8 1 LR in 2 (33m) no Long Range interactions with Long Range IPs: 1 5 2 8 - 1 5 8 - 1 5 2 - 1 5 - 2 8 - 8 03.08.2010 giulia papotti (BE/OP/LHC)

Fill 1301 no Long Range interactions with Long Range IPs: 1 5 2 8 - 1 5 8 - 1 5 2 - 1 5 - 2 8 - 8 giulia papotti (BE/OP/LHC)

List of Ongoing/Pending Work I Commissioning work for higher intensities: Multi-bunch injection: N bunches per injection, completed for beam1, to be completed for beam2. Transverse damper: Train test with 4 bunches at 150 ns. 1 shift. Adjustments for train. 1 shift. Total: 2 shifts. Multi-bunch studies for RF and BPM's, instrumentation, dump, ... Crossing-angle setup at 450 GeV. Address losses with 100 micro-rad in IP2, goal is 150 micro-rad (full, see w33 Tuesday summary). Check of orbit feedback improvement (minimize energy changing COD trims). Can be parastitic. 2 ramps. PLL commissioning work (better tune feedback with high intensities and damper on): at 450 GeV and later during ramp. 6 times 0.5 shifts. Injection preparation for 12b bunch train injection (injection protection setup). 2 shifts. Injection test for 12b bunch train. 0.5 shifts. Increase of intensity: Increase bunch intensity to 1.1e11. More bunches after 1 week with 48b?  NO. Define plan Agree target crossing angles 8:30 meeting

List of Ongoing/Pending Work II Maintenance of LHC performance & protection: Monitor collimation validity and efficiency (loss maps). 1b of 1e11 per beam. 1.5 shifts. Correct the momentum cleaning for beam 2 (collimator setup IR3). 1b of 1e11 per beam. 1 shift. Test less heavy method for loss maps (blow up selected bunches with transverse damper at end of shift). 1b of 1e11p. 1 hour. BCT response check for different bunch intensities. Parasitic to collimation loss maps. BCT response check for different bunch lengths. 450 GeV. 2 hours. Study and measurements of important LHC parameters: Independent measurement of beta* and beam offsets in triplets: k-modulation. 1b of 1e11 per beam. Not colliding. Change RQTX1/2/3 by +- 0.5 A. Measure after squeeze to 3.5m. 1 shift. Measurement of transverse beam distribution at 3.5 TeV. 8:30 meeting

Program today Thursday evening Physics 50b x 50b Friday day Bunch train studies part II: ADT, PLL, … Friday evening Physics 50b x 50b Saturday k-modulation in triplets (beta*, offsets), ADT test for loss maps, physics Sunday tbd 8:30 meeting

Week 34 Open Issues for next Technical Stop: CMS cooling for central tracker. Ion pumps in dump line MKB (B2 only 4 out of 8 pumps working; few days intervention). BLM racks (in buildings SR1 and SR5 and both at position BY02): would like to correct the way the power cable for the multi-plug arrives inside the rack. QPS boards: several boards had to switch from channel A to B. Access team to replace oxydized connectors for PAD-PX24 (3 hours). CV needs to replace a motorization of the water valve of the sector 56 (3h). RCBH18.R7B2 – Miguel Cerqueira Bastos. RCSSX3.L1 super blocked for cryo. 8:30 meeting