Student Design Competitions

Slides:



Advertisements
Similar presentations
Presented by Thabo Letopa
Advertisements

1 Grundlæggende Web Design Final Project Bon Appetite Café Website By Mohammed Marouf Course Manager Michael Hammel Mohammed Marouf Bon Appetite.
EUROPEAN FARRIER CHAMPIONSHIP AUSTRIA 3 rd to 5 th August 2012.
Officiating Race Walk Presented by Les Chih January 19, 2014 USATF Ohio Association Clinic.
Inspiration Furniture A Proposal for a Web Site Redesign by KCC, Web Design & Usability Specialists.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
P.464. Table 13-1, p.465 Fig. 13-1, p.466 Fig. 13-2, p.467.
P449. p450 Figure 15-1 p451 Figure 15-2 p453 Figure 15-2a p453.
Fig. 11-1, p p. 360 Fig. 11-2, p. 361 Fig. 11-3, p. 361.
Estimating Planning Estimating Planning Controlling.
TRD Status meeting Münster Clemens Adler TRD ROC Status The long and winding road to production start.
Table 6-1, p Fig. 6-1, p. 162 p. 163 Fig. 6-2, p. 164.
Testing the Resistance of Paths Through the Earth Near the LVEA.
1 Grundlæggende Web Design Final Project Bon Appetite Café Website By Mohammed Marouf Course Manager Michael Hammel Mohammed Marouf Bon Appetite.
PROCEDURES FOR SELECTING THE CONTRACTOR
Chapter 5: Transformation System Design 1 Solutions to Chapter 5 Exercises.
Ft. Kent Weather Database Student: David Southern Instructor: Tony Gauvin 27 April 2009.
Art 128 Interface Programming 1 In-class Presentation Week 11A.
1 times table 2 times table 3 times table 4 times table 5 times table
Pellet Plant Wawasum Corporation. Wawasum 50/50 Partnership BNA & AZA Planned Location: BNA Reserve 67,000 tpa.
Member Association Fees. Current System 1 parameter: number of archers 4 categories plus development category –Category 1 400US$1-100 archers –Category.
A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Water System Planning Study
Desktop Publishing A leaflet. Requirements Leaflet must fold into four A5 pages. An A5 page is half an A4 page. Must have information on four trips -
Chapter 16 Structured Systems Analysis. Learning Objectives Know goals, plans, tasks, tools, & results of systems analysis Understand/appreciate costs.
Tracking Assets Certification Inventory Services The University of Texas at Austin.
Business Plan Your Proposed Company Name Here. Mission / Purpose of Your Business Give an overview here.
Graphic designers use film media, print, and electronic devices to create designs. They create designs for ads, brochures, products, web pages, and logos.
ARIN Customer Survey Richard Jimmerson. Objectives Create a pro-active channel for customer feedback – Many customers do not currently use existing feedback.
Capstone Project Phase Two! Design Phase – Functional Specification Document.
Supply Management – Excluding Vaccine. Supply Management is responsible for assuring the clinic has adequate medical and non-medical supplies Must have.
Alexandria Radio Club Chairman: Jack Hranicky – K5OTZ Annual Ham Radio Field Day June 23-24, 2012.
WACKO Event Instructions The Thunderbird Battalion "Choose Greatness...Strive For Excellence!""
SDC Update June 5, SDC Update – June 2012 Investment Plans submitted to OCIO for approval – Core Network – Firewall – Storage OB2 Heat Reduction.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Tables Learning Support
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
Best 20 jobs jobs sites.
PROPOSALS Superstructures Paul V. Anderson’s Technical Communication, 6 th ed.
9/6/2017 2:01 PM9/6/2017 2:01 PM9/6/2017 2:01 PM1 Restaurant Service A student in.
Logistics Data Base Training
Multiplication table. x
Fall Final Review Answers (Mostly from the student journal)
ANNUAL JSC SPACE SETTLEMENT DESIGN COMPETITION
Modified for Volleyball Alberta Domestic Competitions
Times Tables.
IST 251 Enthusiastic Study/snaptutorial.com
Officiating Race Walk Presented by Barbara Hensley and Les Chih
11/14/2018 Innovation Cup.
2017 Near-Space Balloon Competition Please enjoy some pizza!
Energy of an atom Bohr proposed to calculate energy you use the following equation However, we also know that Using substitutions, we get Simplifying this.
تسلیم کالای جانشین توسط بایع Deliver of Substitute Goods
Manufacturing Planning
Class Schedule – Day One
Project Name Group Members.
Round 1 Debrief - PM What worked? What didn’t work?
How tall is the table?.
Project Name Group Members.
Project Name Group Members.
Science Fair Project Timeline
2018 Classroom Layout Project
3 times tables.
6 times tables.
Labor Assignments In either job or Batch production systems, the problem is to determine the number of workers needed in each station to achieve the required.
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
Multi-Family Fourplex Apartment
Scheme of work.
Presentation transcript:

Student Design Competitions

Proposed Layout 12 13 10 1 2 3 6 11 8 9 4 5 7 Easeles

SDC Schedule Time SDC ACTIVITIES 0600 Test equipment delivered to competition site 0700 Finalize layout of tables and move equipment to tables 0800 Test set up SDC#1, #3*, #4, #7, #8+, #10, #12, #13 0900 - 1200 Judging SDC#1, #3*, #4, #7, #8+, #10, #12, #13 1200 – 1230 Lunch 1230 - 1330 Test set up SDC#2*, #5, #9+. #11 Judging cont. #4, #7, #10, #13 1330 - 1430 Judging SDC#2*, #5, #9+, #11  1430 - 1500 Test set up SDC#6*  1500 - 1700 Judging SDC #6*  1700 - 1800 Tear down and repack equipment 1800 - Ship out equipment NOTE: *SDC#2, #3 and #6 share the same test station, and + SDC#8 and #9 share the same test station.