Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Advertisements

FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center 1 LCLS Linac TDR, December.
Undulator System Review Closeout Erik Johnson, Kem Robinson, Dieter Walz 4 March 2004.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
LTU/Undulator Installation Status
A Cold SCU Phase-Shifter
LCLS Undulator System Detailed Report
Undulator Scope, Management, and Organization
Advanced Research Electron Accelerator Laboratory
LINAC OPS Budget Review
Stefan Moeller – XES Manager May 14, 2009
e-Beams Systems Update
Installation of Photon Beam Transport to FEH
Electron Beam Systems ETC and Methodology
Injector / Linac Installation Current Status
Details supporting the increase
DOE Review of the LCLS Project
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Project Management Issues John N. Galayda, SLAC April 24, 2002
Linac LLP Outline LINAC Long Lead Procurements
LCLS Undulator System Status and Schedule
Electron Beam Systems Wrap-up
Undulator Cavity BPM System Status
LCLS Undulator System Production Management
LCLS Undulator System Status
Shutdown Planning & Installation Schedule
E-Beams Systems Manager
LTU/Undulator Installation Status
LCLS Undulator System Status and Schedule
LCLS Injector System Overview D. H
Linac Coherent Light Source Project ETC 18 September 2007
Control System Overview Hamid Shoaee LCLS Control System Manager
Installation Status & Operational Readiness Process
Undulator System Overview
DOE Mini-Review of the LCLS Project
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Injector/Linac Design Status C. E
Undulators Subgroup Summary April FAC Review K. Robinson, J
LCLS Undulator System Detailed Report
LCLS e- Beams System Overview
CF Scope, Management & Organization
Alignment Diagnostic System Status
e-Beams Systems Update
LINAC System Engineering / Design Status C.E. Rago
LCLS Control System Personnel Linac & BC2 Controls progress
DOE Status Meeting of the LCLS Project
LCLS e- Beams Systems Manager
Injector/Linac RF Status
Control System Overview Hamid Shoaee LCLS Control System Manager
Presentation transcript:

Electron Beam Systems ETC and Methodology David Schultz E-Beams Systems Manager Recent progress e-beams Costs Estimation and ETC Progress against milestones Risks

Recent progress LCLS Injector, and Bunch Compressor 1 Installed and commissioned Commissioning goals achieved Bunch Compressor 2 and Linac The down is under way, installation is proceeding No show stoppers are seen for installation and checkout. The downtime schedule remains very tight. BC2 commissioning schedule is generous. Undulator All Undulator segments now at SLAC Controls and component fabrication for LTU -> Dump installation is proceeding well.

Recent progress Enhanced Undulator staffing: Jose Chan CAM for Undulator System Integration at SLAC Carl Rago Integration Engineer at SLAC Bill Berg Integration Engineer at ANL Don Schafer Design Engineer at SLAC

ETC major contributing factors The Continuing Resolution added cost to the system Lost productivity while the impact was assessed. Costs to recover and perform to the new schedule. There were major increases in mechanical and cable plant installation cost estimates Estimates are based on experience with Injector -> BC1 installation. Further cost increases with increased scope LTU/UH/ED Controls networks

e-beams ETC cost increases Cost increases associated with the CR Effort associated with schedule replanning Lost productivity during uncertainty Very significant with the ANL Undulator effort Cost to accelerate production and procurements to meet the schedule

e-beams ETC cost increases Basis of estimate is experience with the installation of the Injector and BC1. Estimate is done top-down and confirmed with a bottom-up estimate. 2007 Installation $740k LTU Installation $886k Undulator Installation $203k E-Dump Installation $254k total increase $2.08M

e-beams ETC cost increases For cable plant installation, the estimate is done by the SLAC cable group using RS Means. Recent estimates have been accurate. LTU/Dump Cable plant Installation $247k Undulator Cable plant Installation $698k total increase $945k

e-beams ETC cost increases Controls network scope had to be added. The bottoms up cost estimate has been reviewed. LTU/UH/ED networks $800k addition

e-Beams ETC

e-Beams Level 3 Milestones

Risk registry entries The Linac BPMs may not have sufficient sensitivity for FEL commissioning. The upcoming BC2 commissioning will determine if an upgrade is warranted. The cost of an upgrade would be ~$800k. Beam diagnostics upstream of BC2 may be needed to optimize beam parameters as needed for FEL commissioning. The cost of an upgrade would be ~$250k.

Risk registry entries The assembly of the Undulator Girders is on the project critical path for Undulator commissioning. Several parts are, or are near, the limiting factor 1) RF BPM production The RFBPM is performing very well in the 3-BPM test at ANL. Fabrication has begun on some parts, but design is just now finishing. Prototype fabrication (brazing) was problematic.

Risk registry entries 2) Undulator Vacuum chamber The Stainless Steel ‘4-Weld’ design has been abandoned due to tight constraints on magnetic permeability. Three alternate designs were taken up, Extruded Al design Clamshell Al design (now halted) Cu tube design The extruded Al design is the front runner Mechanical tolerances have been met Interior surface finish tolerances have been met Down select design at the end of September

Risk registry entries 3) Undulator Component Deliveries There are a large number of parts coming to SLAC from ANL and ANL vendors These parts need to be assembled onto the Undulator girders and precision aligned. Any rework or modification of parts at SLAC will delay girder assembly. We have instituted weekly video meetings with ANL and are in the process of starting quarterly Undulator collaboration meetings to ensure coordination. Integration engineers at ANL and at SLAC have been established to coordinate the receipt and assembly.

Summary Progress to-date has been good, especially with Injector commissioning. Progress towards completion of the current installation is good. CR related costs have been incurred, and we are prepared to perform to the new CR driven schedule. Revised installation costs, based on experience, lead to a substantial increase in the ETC. With the new CR driven schedule, there is sufficient cost and schedule contingency to complete the project.