Outer Tracker Module Design meeting, 27 January 2014 News on the PS and 2S module geometries 200 W / 2m 100 W / 5m News on PS and 2S module geometries,

Slides:



Advertisements
Similar presentations
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Results on Test Cryostats and The AGATA Asym. Triple: Status of Cryostat Production AGATA Detector Group Meeting, IKP Cologne March 16th, 2006.
1 Outer Tracker Mechanics, indico: May 2014, A.Onnela 21 May 2014 Thermally conductive carbon-fibre composite material for module and mechanics.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
K.K. GanUS ATLAS Review1 Optical Hybrids K.K. Gan The Ohio State University WBS
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
1 Module and stave interconnect Rev. sept. 29/08.
VELO Module Kickoff Summary Richard Plackett – VELO Pixel Chip Meeting CERN, 13th November 09.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
VELO upgrade news 19 January VELO Upgrade Survey  Not yet filled in, but last answers arriving in the next 24 hours....!  Hope to soon appoint.
7 october 20111T. Schneider Test bench for digital sensor New Philips Digital Light Sensor Outer dimensions 32.6*32.6mm 2 8*8 pixel array Pixel pitch 4*4mm.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
EC: 7 DISK concept Preliminary considerations
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
GEM Integrated PCB readout and cooling
ATLAS Internal ID Service Integration
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Detector building Notes of our discussion
Cabling for LHCb Upgrade
LBNF CAD models, Drawings and Component list
Status of the MICE Construction Project
Technical Design for the Mu3e Detector
Status of design and production of LEP connection cryostat
Hybrid Pixel R&D and Interconnect Technologies
T2K Upgrade First look at TPC contraints (WAGASCI Constraints)
Micro Vertex Detector of PANDA Strip Detector
Antti Onnela CERN – EP – Detector Technologies group
Mini-drawers, FE-ASIC , Integrator
Services Layout – Update
Database requirements from ITk-Strips for DAQ loads
Adapting the via last Design
2S module geometry updates Module positioning concepts
Rod adaptors for module tests Module positioning studies
Ideas and Plans on Tracker Module Mechanics Developments
WG4 – Progress report R. Santoro and A. Tauro.
Status of CO2 Cooling tests at CERN for Pixel phase 1
Recent updates to the 2S module geometry Towards first dummy modules
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
Advantages and Challenges of this design Today status of the design
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Updates on the Silicon Tracker 2S Module
Development of Reference Geometry DB of ATLAS Detector Reproduction of Inner Detector Kobakhidze Shota 25/04/2019.
Presentation transcript:

Outer Tracker Module Design meeting, 27 January 2014 News on the PS and 2S module geometries 200 W / 2m 100 W / 5m News on PS and 2S module geometries, 27 Jan 2014, indico: 295643 A.Onnela, K. Cichy

Contacts, further info Modules CAD design: Aleksis Chavèz Niemelä returned at the end of 2013 to Finland to complete his university studies. Thanks for his contributions to the Upgrade project! Kamil Cichy since December 2013 as CERN technical student, and is now the contact for the module CAD (Catia) design. Module geometry data files (Catia and STEP), as well as module images, are available in https://espace.cern.ch/Tracker-Upgrade/SitePages/Home.aspx ’2S Module design’ and ’PS Module design’ ’Documents’ link in the left panel News on PS and 2S module geometries, 27 Jan 2014, indico: 295643 A.Onnela, K. Cichy

PS, Pixel-Strip modules 200 mm < R < 600 mm The modules 2S modules PS modules Status in mid 2013 Current status 2S, 2-Strip modules R > 600 mm PS, Pixel-Strip modules 200 mm < R < 600 mm News on PS and 2S module geometries, 27 Jan 2014, indico: 295643 A.Onnela, K. Cichy

PS module, with 4.0 mm sensor gap Power hybrid lowered, with no spacer, to reduce module total thickness from 13.5 mm to 9.7 mm. November 2013 More compact optopackage, with only electrical connector, no optical connectors January 2014 News on PS and 2S module geometries, 27 Jan 2014, indico: 295643 A.Onnela, K. Cichy

PS module sub-assemblies News on PS and 2S module geometries, 27 Jan 2014, indico: 295643 A.Onnela, K. Cichy

Heat-spreaders, spacers, base-plate Base-line spacer choice: Aluminium/Carbon-fibre – composite. Carbon foam considered as possible other option. News on PS and 2S module geometries, 27 Jan 2014, indico: 295643 A.Onnela, K. Cichy

2S module Spring 2013 The same compact optopackage, as on the PS module 5th support added to improve cooling January 2014 Sensor HV-connections moved to the Service hybrid News on PS and 2S module geometries, 27 Jan 2014, indico: 295643 A.Onnela, K. Cichy

2S 4.0 mm News on PS and 2S module geometries, 27 Jan 2014, indico: 295643 A.Onnela, K. Cichy

2S 1.8 mm Spacers of the 1.8 mm module Spacers of the 4.0 mm module News on PS and 2S module geometries, 27 Jan 2014, indico: 295643 A.Onnela, K. Cichy

PS and 2S module designs, next PS modules: The now starting prototype studies (more in Alan’s talk) will focus in particular on the handling and assembly of the PS modules. May lead to modifications, e.g. on the geometries of the sensor HV-connections. Positioning/alignment holes or clamping points may need to be added. Update models of the 1.6 mm and 2.6 mm modules to be at the same design level as the 4.0 mm. 2S modules: In current design all 5 module attachment holes are the same. Need to define two of them to be used for module positioning/alignment. News on PS and 2S module geometries, 27 Jan 2014, indico: 295643 A.Onnela, K. Cichy

Back-up slides News on PS and 2S module geometries, 27 Jan 2014, indico: 295643 A.Onnela, K. Cichy

PS 4.0 mm News on PS and 2S module geometries, 27 Jan 2014, indico: 295643 A.Onnela, K. Cichy