ClimaCheck Energy saving through optimisation CoolCheck Pty Ltd

Slides:



Advertisements
Similar presentations
Energy Conservation Energy Management.
Advertisements

ENERGY SAVING Product Offering COMPRESSOR MARKETING OPPORTUNITIES.
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
Variable Frequency Drives VFD Basics
Heat pumps and their economics. There has been fluctuations before Johnson Controls2.
Energy Saving Control-Strategies for Reefer Containers Kresten Kjær Sørensen, Lodam electronics.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
C oncerns Ltd ool Energy Efficient Refrigeration Jane Gartshore, Cool Concerns Ltd.
Design Envelope Pumps – Value Proposition 2012 Lowest Installed Cost Lowest Life Cost.
1 Vapour compression cycle Refrigerator Air conditioning plant Heat pump (“ ENERGY MANAGEMENT HANDBOOK” Sixth Edition, Chapter 8)
Jim Chmielewski – HVAC Sales Manager Emerson Control Techniques
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
Steve Craker K-12 Team Lead Geoff Overland IT and Data Center Focus on Energy Increase IT Budgets with Energy Efficiency.
ENGINEERING YOUR SUCCESS. PDF Market and Sales Meeting Refrigerated Dryers.
Refrigeration Terms Cooling Load, Cooling Capacity – Q in Compressor Load – W in Condenser Load – Q out Tons of Refrigeration – Rate of Heat Input Refrigerant.
Air-Source Heat Pumps I North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Airsource Heat Pump 1.
Quantifying Cycle Isolation Losses and Integration with On Line Systems Feedwater System Reliability Users Group 2015 Meeting San Antonio Ken Porter Rich.
Hawke’s Bay Refrigeration
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Air conditioning – Refreshes your life EWTP MBY Applied Systems Sales1 EWTP-MBYNN Air-cooled Heat Recovery.
1 PredictiveOnLine PREDICTIVE SYSTEMS ENGINEERING Vintec Knowledge Ltd.
Mission Energy: Energy Efficient Cooling How Data Centre energy consumption and operating costs can be significantly reduced through readily available.
© 2008 Data Power Services, LLC By: Tom Taranto 2010 Energy Expo Hosted by National Grid NYSERDA Reducing Compressed Air Energy Cost Using a Systems Approach.
Automatic Tube Cleaning System for Condensers and Heath Exchangers
Vapour Compression Refrigeration Systems
Flooded Screw Chiller FWSF Electronic Expansion Valve Condenser Evaporator Control box compressor Flooded Screw Chiller - FWSF.
November 2004 Low Hanging Fruit Low Cost Energy Efficiency Opportunities in Cleanrooms.
Sawyer Environmental Changes Mechanical Engineering Department Capstone Amy R. Dan H. Colby C. Brittany P. Richard G. 1.
/ 1 ERA A chiller to suit everyone. Air cooled water chillers Free-cooling chillers Air/water heat pumps.
Why Maintenance Tasks are Important Produced by Joe Marchese.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Lecture Objectives: Finish with absorption cooling Power generation Rankine cycles Connect power generation with heating and cooling –CHP –CCHP.
Pressure-Enthalpy and the Variable Refrigerant Cycle
1 BREC Air-cooled water chillers BREF Air-cooled water chillers with free-cooling system 1602A A A A A 3202A A A -
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
Objectives Cooling Cycles –Examples Cooling system components Refrigerants.
Better together... we deliver MODELLING, CONTROL AND OPTIMISATION OF A DUAL CIRCUIT INDUCED DRAFT COOLING WATER SYSTEM February 2016 C.J. Muller Sasol;
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
Refrigeration What's Refrigerated? What makes up a system?
Best practice small scale commercial refrigeration, optimisation strategies and simple maintenance Michael Bellstedt, Minus40 Pty Ltd.
Data Analytics – A Cost Effective Approach to Reducing Operating Costs Automatically “find what matters” in the data from building equipment systems and.
Enhancing The Efficiency Of New And Existing Cooling Systems Dr Robert Lamb CEng FInstR Group Sales & Marketing Director Star Refrigeration Ltd.
© INTECHNICA Energy efficiency assessment Systematic Approach to Green Production Energy Efficiency Assessment Supported by: The sole responsibility.
WELCOME. Glycol Refrigeration A most basic definition of refrigeration is taking heat from someplace we don’t want it and moving it to someplace where.
James McIntyre VRF Training Manager V5 Key Components.
ENERGY SAVING AND EFFICIENCY OF AIR CONDITION & LIGHT SYSTEMS AT PUBLIC BUILDINGS Meitav-tec (Contel group)
How Machine Learning & Analytics Saved 1 Billion kWh
. Level 3 Air Conditioning Inspections for Buildings
Energy Management and Planning MSJ0210
The Data Center Challenge
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Lecture Objectives: Discuss Final Project
HYDRONIC HVAC: The Most Comfortable and Efficient System
GEYSER Heat Pump Water Heater
Introduction to Food Engineering
AdaptaPAK The sustainable, energy-efficient outdoor refrigeration solution.
HYDRONIC HVAC: The Most Comfortable and Efficient System
Lecture Objectives: Continue with Sorption Cooling
Lecture Objectives: Answer questions related to HW 4
Trane Care Energy RTHD Adaptive Frequency Drive retrofit.
ENERGY SAVING Product Offering
Stefan Thie, EPEE Technical Expert
Air Conditioning System-1
HOW TO SAVE MAXIMUM ENERGY IN YOUR COMPRESSORS INSTALLATION
Leak Detection All Refrigerant: Soap bubble
Title RTWD Water-Cooled Chillers subtitle START
HAZOP Guidewords Base Set
SNS Cryoplant Commissioning Past Experiences
Making the right business decisions is essential for any company.
INTRODUCTION ALAQUA is a US corporation. We manufacture process equipment. Our engineers have over 20 years experience in the engineering of sanitary and.
Presentation transcript:

ClimaCheck Energy saving through optimisation CoolCheck Pty Ltd www.CoolCheck.co.za

of the world’s energy is consumed by cooling systems 20% of the world’s energy is consumed by cooling systems IIR (2002)

About ClimaCheck ClimaCheck is performance and efficiency monitoring platform for cooling systems. Invented in 1986 in Sweden it uses a scientific process to identify energy inefficiencies and issues affecting reliability and maintenance costs. The technology was developed and refined and due to growing international demand, the company ClimaCheck was formed in 2004 to service markets worldwide. The process is totally non-invasive and uses raw temperature, pressure and energy data from any vapour compression system (cooling or heat pump) to measure the performance and efficiency. At its core, ClimaCheck provides plant owners and their operators high level key performance indicators and accountability for efficiency and reliability. Thousands of customers around the world trust ClimaCheck - from a mission-critical data centres in North America to a cooling system for a hotel in China of 300MW. CEO and inventor Mr Klas Berglöf

What is it? How does it work? What is it used for? What does it do?

Compared to other systems ?? What is the difference??

Rack / Chiller efficiency and performance Feature Description ClimaCheck Traditional Controls Rack / Chiller efficiency and performance Cooling capacity* (kWR) (1 minute resolution) yes ─ System cooling COP* Condensing/heating capacity* (kW T.H.R) (1 minute resolution) System condensing/heating* COP System Efficiency Index (SEI) (e.g. performance indicator relative to application) System stability automatic detection (e.g. fluctuating LP or HP) kWR(hr) Kilowatt hours of refrigeration (cooling energy consumed by end-user) Oil separator failure (hot gas bypass into oil system) Oil separator condensation (e.g. low load with low condensing) Sensors out of calibration Transducers out of calibration kW(hr) Kilowatt hours of electrical energy per rack # kW(hr) Kilowatt hours of electrical energy per compressor kW(hr) Kilowatt hours of electrical energy per condenser Uneven compressor run hours Liquid flood back # Additional hardware and sensors required * Scientific process using raw system data. No manufacturer performance data or "polynomials" used.

Feature Description Refrigerant performance and efficiency ClimaCheck Traditional Controls Refrigerant performance and efficiency Gas leak detection (without gas sensor) yes ─ Impurity detection (e.g. leakage of high glide refrigerants) Non-condensable detection Incorrect refrigerant Compressor performance and efficiency (per compressor) Liquid flood-back Isentropic efficiency (e.g. valve plate wear/damage / piston ring wear) Planned maintenance on "work done" kWR(hr) and/or kW(hr) e.g. VSD compressors Compressor "off" without controller alarm Short-cycling Condenser performance and efficiency Performance degradation (e.g. dirt build-up over time, water pump cavitation) Verification of manufacturer data versus actual performance Verification of de-superheater performance Evaporator performance and efficiency

The law of the conservation of energy: How does it work? The law of the conservation of energy: “Energy cannot be destroyed” The law of the conservation of energy: “EnergyThe law of conservation of energy, a fundamental concept of physics, states that the total amount of energy remains constant in an isolated system. It implies that energy can neither be created nor destroyed, but can be change from one form to another”.

How does it work? m

How does it work? Heat Capacity Cooling Capacity 3 2 Enthalpy Pressure How does it work? Heat Capacity 3 2 P HP Enthalpy Difference P LP Cooling Capacity 1 Massflow= Electrical power −heatloss Enthalpy increase compressor

What does it do?

What does it do? Nothing???? Non-Invasive Passive “Read only”

Nothing???? What does it do? Non-Invasive Passive “Read only” Energy-saving gadget Set point “optimisation”

Optimization start with measurements Analyze Optimize Save ClimaCheck onsite - field measurements - 20 minutes to connect ClimaCheck online – continuous monitoring - Early warning – energy reporting All starts with measuring - To measure is to know! The ClimaCheck performance analyser logger is connected to equipment for measuring all relevant parameters. Collected data is then analysed either with a PC software for field measurements or via online with server for fixed monitoring. Information presented is very easy to survey and provides the keys for optimising the performance. The result is significant savings in time, in equipment and in energy. The Monitoring system is fixed for online analyses of equipment installed at end users – the equipment owners. Commissioning engineers, consultants and service contractors use the portable field measurement system in their work. Usually, the ClimaCheck software is installed in a PC for direct analyses of equipment.

Climacheck Analyser:

300 MW Macao Hotel Casino Complex Combined Total Cooling Capacity:

Performance vs Efficiency What is the difference? …as explained by Jeremy Clarkson…

Efficiency (MBE) Program Monitoring Based Efficiency (MBE) Program

Typical Process: A ● Efficiency Time Technology Optimum Project Concept Technology A ● Optimum Efficiency Time

Typical Process: A ● B ● Efficiency Time Technology Optimum 1 Project Concept Technology A ● Optimum 1 Current Deviation B 2 ● Efficiency Time

Typical Process: A ● B ● Efficiency Time Technology Optimum 1 Project Concept Technology A ● Optimum 1 Current Deviation B 2 ● 1 Design and Installation: Constraints (e.g. budget, time, environmental) Information accuracy (e.g. client data, load data) Load variability versus controls design and equipment operating envelope. Incomplete or incorrect system commissioning. Efficiency 2 Maintenance and Repair: Setpoint adjustment. (e.g. priority given to performance over energy and/or reliability) “Run to Fail” mentality: “if it ain't broke, don’t fix it”. Component degradation over time (e.g. fouled heat exchangers). Operational inefficiencies (night operation with unoccupied space) Operator and service technician skill level. Time

Typical Process: A ● B ● Efficiency Time Technology Optimum 1 Project Concept Technology A ● Optimum 1 Lost Efficiency Current Deviation B 2 ● 1 Design and Installation: Constraints (e.g. budget, time, environmental) Information accuracy (e.g. client data, load data) Load variability versus controls design and equipment operating envelope. Incomplete or incorrect system commissioning. Efficiency 2 Maintenance and Repair: Setpoint adjustment. (e.g. priority given to performance over energy and/or reliability) “Run to Fail” mentality: “if it ain't broke, don’t fix it”. Component degradation over time (e.g. fouled heat exchangers). Operational inefficiencies (night operation with unoccupied space) Operator and service technician skill level. Time

Typical Process: A ● B ● Efficiency Time Technology Optimum 1 ɪ Project Concept Technology A ● Optimum 1 B ɪ V Lost Efficiency B - baseline I - implementation V - validation Current Deviation B 2 ● Phase 1 1 Design and Installation: Constraints (e.g. budget, time, environmental) Information accuracy (e.g. client data, load data) Load variability versus controls design and equipment operating envelope. Incomplete or incorrect system commissioning. Phase 1: Operational Expenditure. E.G. re-commissioning, correction of identified inefficiencies such as poor control set-up (typical savings: 10% to 20%). Efficiency 2 Maintenance and Repair: Setpoint adjustment. (e.g. priority given to performance over energy and/or reliability) “Run to Fail” mentality: “if it ain't broke, don’t fix it”. Component degradation over time (e.g. fouled heat exchangers). Operational inefficiencies (night operation with unoccupied space) Operator and service technician skill level. Time

Typical Process: A ● B ● Efficiency Time Technology Optimum ɪ 1 Project Concept Technology A B ɪ V ● Optimum 1 Lost Efficiency B - baseline I - implementation V - validation Current Deviation B 2 ● Phase 1 Phase 2 1 Design and Installation: Constraints (e.g. budget, time, environmental) Information accuracy (e.g. client data, load data) Load variability versus controls design and equipment operating envelope. Incomplete or incorrect system commissioning. Phase 1: Operational Expenditure. E.G. re-commissioning, correction of identified inefficiencies such as poor control set-up (typical savings: 10% to 20%). Efficiency 2 Maintenance and Repair: Setpoint adjustment. (e.g. priority given to performance over energy and/or reliability) “Run to Fail” mentality: “if it ain't broke, don’t fix it”. Component degradation over time (e.g. fouled heat exchangers). Operational inefficiencies (night operation with unoccupied space) Operator and service technician skill level. Phase 2: Capital Expenditure. E.G. installation of variable speed drives, “EC” fans and replacement of components beyond economic repair. Time

Typical Process: A ● B ● Efficiency Time Technology // Optimum // ɪ Project Concept Technology B ɪ V M.B.E Program™ // A ● Optimum 1 Lost Efficiency B - baseline I - implementation V - validation Current Deviation B 2 ● Phase 1 Phase 2 Phase 3 // 1 Design and Installation: Constraints (e.g. budget, time, environmental) Information accuracy (e.g. client data, load data) Load variability versus controls design and equipment operating envelope. Incomplete or incorrect system commissioning. Phase 1: Operational Expenditure. E.G. re-commissioning, correction of identified inefficiencies such as poor control set-up (typical savings: 10% to 20%). Efficiency 2 Maintenance and Repair: Setpoint adjustment. (e.g. priority given to performance over energy and/or reliability) “Run to Fail” mentality: “if it ain't broke, don’t fix it”. Component degradation over time (e.g. fouled heat exchangers). Operational inefficiencies (night operation with unoccupied space) Operator and service technician skill level. Phase 2: Capital Expenditure. E.G. installation of variable speed drives, “EC” fans and replacement of components beyond economic repair. Phase 3: Monitoring Based Efficiency Program™. E.G. on-going monitoring. Fault detection/prediction. Performance degradation over time. Energy team KPI feedback. Time

Typical Process: A ● B ● Efficiency Time Technology // Optimum // ɪ Project Concept Technology B ɪ V M.B.E Program™ // A 2 ● Optimum 1 Lost Efficiency B - baseline I - implementation V - validation Current Deviation B 2 ● Phase 1 Phase 2 Phase 3 // 1 Design and Installation: Constraints (e.g. budget, time, environmental) Information accuracy (e.g. client data, load data) Load variability versus controls design and equipment operating envelope. Incomplete or incorrect system commissioning. Phase 1: Operational Expenditure. E.G. re-commissioning, correction of identified inefficiencies such as poor control set-up (typical savings: 10% to 20%). Efficiency 2 Maintenance and Repair: Setpoint adjustment. (e.g. priority given to performance over energy and/or reliability) “Run to Fail” mentality: “if it ain't broke, don’t fix it”. Component degradation over time (e.g. fouled heat exchangers). Operational inefficiencies (night operation with unoccupied space) Operator and service technician skill level. Phase 2: Capital Expenditure. E.G. installation of variable speed drives, “EC” fans and replacement of components beyond economic repair. Phase 3: Monitoring Based Efficiency Program™. E.G. on-going monitoring. Fault detection/prediction. Performance degradation over time. Energy team KPI feedback. Time

Repair Gas Leak Detection

Hardware, Installation cost & Monthly subscription