RiverView Condominiums II Chicago, IL

Slides:



Advertisements
Similar presentations
Riverview Heights Darren K. Howard Structural Option Architectural Engineering Spring Thesis 2005 Advisor: Dr. Ali Memari.
Advertisements

Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
MICA GATEWAY RESIDENCE BALTIMORE, MARYLAND SCOTT MOLONGOSKI SENIOR THESIS STRUCTURAL OPTION ADVISOR: PROFESSOR SUSTERSIC.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
University Health Building Thesis Final Presentation
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
George Read Hall The University of Delaware
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Jonathan Coan AE Senior Thesis April 10, 2012 Weill Cornell Medical Research Building New York, NY Images courtesy of Ennead Architects.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Mathew Nirenberg AE Senior Thesis Structural Option.
Nicole C. Drabousky Pennsylvania State University Architectural Engineering Structural Option Spring 2006 Senior Thesis Presentation.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Reinsurance Group of America (RGA) Global Headquarters Natasha Beck Structural Option Faculty Advisor: Heather Sustersic Images courtesy of Gensler & Tom.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Christopher Simmons l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Dr. Ali M. Memari Baltimore Hilton Convention Center Baltimore.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
University of Delaware Center for the Arts Newark, DE Karen Schulte Mechanical Option Spring 2006.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Student Health Center Jacob Brambley - AE (structural option)
The Executive Tower NW Washington DC Sean T Howard Structural Emphasis Advisor: Dr. Linda Hanagan æ Class of 2006 (Roof of the Federal Building, Chicago.
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
CONDOMINIUM TOWER & PARKING
ENVIROCENTER PHASE II JESSUP, MD
Advisor: Professor M. Kevin Parfitt
Redifer Commons Addition & Renovation Project
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
One South Dearborn Chicago, Illinois.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

RiverView Condominiums II Chicago, IL Introduction Problem Structural System Redesign Breadth Work Conclusions Emily Whitbeck – AE Senior Thesis 2005

RiverView Condominiums II Chicago, IL Presentation Outline Building Introduction Problem Outline Solutions Structural Mechanical Acoustical Conclusions Introduction Problem Structural System Redesign Breadth Work Conclusions Emily Whitbeck – AE Senior Thesis 2005

RiverView Condominiums II Chicago, IL Building Introduction - High-End Residential High-Rise - 5 levels of parking + 27 story luxury condominium tower - 640,000 sq. ft. of occupied space in tower - $120 million - Design Architect – DeStefano + Partners - Structural Engineer – Chris P. Stefanos - Owner – MCL Properties - Location: North Side of the Chicago River, blocks from Lake Erie Introduction Problem Structural System Redesign Breadth Work Conclusions Phase I complete, Phase II under construction in August Emily Whitbeck – AE Senior Thesis 2005

RiverView Condominiums II Chicago, IL Building Introduction Introduction Problem Structural System Redesign Breadth Work Conclusions Parking Layout Tower Layout Emily Whitbeck – AE Senior Thesis 2005

RiverView Condominiums II Chicago, IL Building Introduction Existing Gravity Structural System - flat-plate reinforced concrete floors supported on reinforced concrete columns Existing Lateral Structural System - reinforced concrete shear walls located in three cores and other locations spaced throughout the building Introduction Problem Structural System Redesign Breadth Work Conclusions Emily Whitbeck – AE Senior Thesis 2005

RiverView Condominiums II Chicago, IL Problem Statement Goals of the Redesign 1 – minimize floor-floor height without changing floor-ceiling clearance 2 – avoid changing the architectural layout or façade, as well as the integration with phase I 3 – open up the layout of the floors by removing columns and shear walls from apartments and some parking areas 4 – improve the overall quality of life for occupants Introduction Problem Structural System Redesign Breadth Work Conclusions Emily Whitbeck – AE Senior Thesis 2005

RiverView Condominiums II Chicago, IL Outline of Redesigns Structural System Depth Study - change the gravity system to post-tensioned concrete change the shear wall layout Mechanical System Breadth Study install an additional return air vent in the corridor for each condominium change fan coil units to minimize ceiling-floor section depth Acoustical Analysis of the Mechanical System check the air ducts against the room criteria method - check the interface zones at supply air vents and return air grilles Introduction Problem Structural System Redesign Breadth Work Conclusions Emily Whitbeck – AE Senior Thesis 2005

RiverView Condominiums II Chicago, IL Structural Gravity System Redesign Methods investigations of other systems investigation of post-tensioning ADAPT leads to several different combinations of depth and span Results Of the systems originally designed, two were studied further 7 ½” slab with a 40’ span, reduces the section depth by 1” per floor, but 40’ is not far enough to remove any columns or move shear walls Introduction Problem Structural System Redesign Breadth Work Conclusions 8 ½” slab with a 45’ span, does not change the section depth, but a 45’ span does allow the removal of several of the columns Emily Whitbeck – AE Senior Thesis 2005

RiverView Condominiums II Chicago, IL Structural Lateral System Redesign Methods investigation of existing shear walls using ETabs different combinations of existing and new walls considered Results based on smaller ceiling-floor section depth, lateral loads on the building decreased different groupings of existing and new walls considered for new system Introduction Problem Structural System Redesign Breadth Work Conclusions Emily Whitbeck – AE Senior Thesis 2005

RiverView Condominiums II Chicago, IL Mechanical System Redesign Outdoor Air Supply - Existing system Goal of the Redesign Install one additional air return vent per condominium in the corridor, creating indirect outdoor air supply Costs $120 per condominium, considered a valuable addition to quality of life Introduction Problem Structural System Redesign Breadth Work Conclusions Fan Coil Units Existing system Goal of the Redesign Same manufacturer creates a ceiling profile model with plenum that is only 10 ½” deep Reduces the ceiling-floor section by 5 ½” and the overall height of the building by about 17’ Emily Whitbeck – AE Senior Thesis 2005

RiverView Condominiums II Chicago, IL Acoustical Analysis of the Mechanical System reasons the Room Criteria Method, RC method what is the RC for ducts? what is the RC for the interface zones? what can be done to mediate problems? Introduction Problem Structural System Redesign Breadth Work Conclusions Emily Whitbeck – AE Senior Thesis 2005

RiverView Condominiums II Chicago, IL Conclusions Structural Redesign of the slab allowed longer spans Smaller lateral loads and a shorter building allowed changes to the lateral system Mechanical Streamlined the system and improved quality while maintaining value Acoustical Determined that there are problems with the interface zones Suggested ways to improve these areas Overall high-rise residential considerations Priorities/secondary items Introduction Problem Structural System Redesign Breadth Work Conclusions Emily Whitbeck – AE Senior Thesis 2005

RiverView Condominiums II Chicago, IL Thank You To my classmates who got me through the last 5 years To the faculty and staff of the AE department who work endlessly to help us To my friends and family who make it all worthwhile To the wonderful people at DeStefano + Partners, Chris P. Stefanos Associates, and Environmental Systems Design Introduction Problem Structural System Redesign Breadth Work Conclusions Emily Whitbeck – AE Senior Thesis 2005

RiverView Condominiums II Chicago, IL Questions? Introduction Problem Structural System Redesign Breadth Work Conclusions Shoot Emily Whitbeck – AE Senior Thesis 2005