Victor Dolcemascolo – DGITM* Bernard Jacob - IFSTTAR**

Slides:



Advertisements
Similar presentations
Delivering solutions Applying the Future Today - Intelligent Transport Systems (ITS) Presentation by Dr Adrian Withill Technical Director - WSP.
Advertisements

CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
HORIZON 2020: FINANCIAL ISSUES
PROJECT CLIMEPORT Mediterranean Port’s Contribution to Climate Change Mitigation ANTONIO CEJALVO Director Agencia Valenciana de la Energía (AVEN) Projet.
Network Design and Implementation
Weigh-in-Motion for Enforcement in Europe
INTEGRATION OF WEIGH-IN-MOTION TECHNOLOGY INTO NIST’S HANDBOOK 44 Webinar: Talking Freight September 21, 2011 Dan Middleton Texas Transportation Institute.
Session V: Programme Roles and Responsibilities
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
Development of North Adriatic ports multimodal connections and their efficient integration into the Core Network Project: NAPA STUDIES Trans-European.
World Forum for Harmonization of Vehicle Regulations (165th session)
EFRTC welcome & presentation EC project, AUTOMAIN workshop, Paris, 4 th October 2012 Imrich Korpanec, EFRTC Secretary General.
Accounting systems design & evaluation 9434SB 8 April 2002.
Presented to presented by Truck Size and Weight Wisconsin’s Legislative Process AASHTO Subcommittee on Highway Transport 2013 July 10 th Wilmington, NC.
Voice over IP Spring LNA Meeting April 1, What is Voice over IP? n A technology for transporting integrated digital voice, video and data over IP.
ISO Strategic Highlight and Innovation 9 July, 2015 A Successful Organization in 2020 INNOPROM /27.
Estonian Ministry of Education and Research KNOWLEDGE-BASED ESTONIA Estonian Research and Development and Innovation Strategy Dr. Indrek Reimand.
ITS for freight and logistics …Bringing intelligence into the mobility of people & goods 22 June Zeljko Jeftic.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Opportunities for ATSSA in ITS Mike Schagrin ITS Joint Program Office US Department of Transportion.
National Innovation Centre Michael Wilkinson, PhD.
Bangkok, Thailand, 25 Aug 2014 Mongolian ICT sector standardization Chuluunbat Tsendsuren Type Approval Officer Communications Regulatory Commission of.
Project Title: CONSTRUCTION OF SCIENCE & TECHNOLOGY BLDG. (Ph. 1) Approved Budget for the Contract (ABC): Php 26,102, (Ph. 1) Source of Funds:Fund.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
HIGH INTENSITY DRUG TRAFFICKING AREA FINANCIAL MANAGEMENT DATABASE PROJECT.
EFV Conference 2007 in Germany 14th March Session WP.29 Geneva Informal document No. WP , March 2007, agenda item 11.3.
Public-Private Partnership Development Platform in Ukraine Non-governmental organization “Public-Private Partnership Development Platform” Київ
Chapter 11: Alternative Approach - Purchasing Systems.
Network design Topic 1 Business goals. Agenda Network life cycle Network design process Business goals Scope Constraints.
Ministère de l'Écologie, du Développement durable et de l’Énergie The French National Projet : Using WIM for direct enforcement.
Principles of Marketing
Chapter 12 The Network Development Life Cycle
PROSAFE Project: Best Practice Market Surveillance Dirk Meijer Chairman of PROSAFE PROSAFE PROJECT Best Practice Market Surveillance Funded by the European.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
How safe are our highway structures? Optimised assessment of bridges Aleš Žnidarič Slovenian National Building and Civil Engineering Institute.
European Truck Platooning Challenge Conference HGV Platooning Trial in the UK Ian Thompson Senior Technology Advisor Highways England.
PKP Energetyka S.A. – Projects. QUALITY, SAFETY, COMMITMENT, EFFICIENCY Documents Schedule Scope Structure Risk Targets Questions.
APLMF GA and Working Group Meetings
Evaluation and Impact Assessment of European FP for R&D :
Project Management Information Systems
Driving Client Efficiency via IData Partnership
Lecture 1. Basic definitions
Introduction to Business (MRK 151)
WELCOME TO EMERGE TECHNOLOGIES
ECR conference Vilnius 16 juin 2016
ITS and Roads in ireland present and future
Truck Weigh Stations, In Motion Weighing
Indigenous and Northern Affairs Canada Leveraging Infrastructure Funds
National Audit Office of China
ServiceNow Implementation Knowledge Management
Business System Development
NMi WIM standard Cock Oosterman NMi Certin
V-Con project (October March 2017)
Commercial Vehicle Enforcement as a solution for ITS enhancements.
Reversing audible warning devices for M- and N- Vehicles
World Forum for Harmonization of Vehicle Regulations (165th session)
Achieving Success Through Project Management Excellence
Project Information Management Jiwei Ma
Infra program Project outline Jouko Kankainen
Challenges in implementing MB IPA statistical cooperation programmes
Impact of Information and Communication Technologies to Distance learning How Information Technology is incorporated in the World Bank’s Development work.
OIML Certification System (OIML-CS)
The Government Role in BOT
SESSION IV: INVESTMENT AND FINANCING OPPORTUNITIES
a. Financing b. Designing c. Construction d. Operating
ENabling SafE Multi-Brand Platooning for Europe
FCC study – Fire collaboration WP4 Status & Update
Brussels,
Presentation transcript:

The French National Projet : Using WIM for direct enforcement of overloading Victor Dolcemascolo – DGITM* Bernard Jacob - IFSTTAR** * General Directorate for Infrastructure, Transport and the Sea ** French Institute for Sciences and Technology for Transports, Development and Networks

Presentation plan Introduction : Static enforcement of overloading Description of the WIM project Organization – Technicals means Budget Participation of the vendors

Static enforcement of overloading : Situation in France Yearly static controls

Static enforcement of overloading : Drawbacks and advantages Need human resources (weighing officers, policemen...) Need a static weighing area Need static scales (risk of vandalism...) Capacity to control only a small percentage of the truck traffic flow Increase of the truck traffic flow and the average level of truck overloading → not efficient → but static weighing or low speed WIM are the ONLY devices legally approved for weight enforcement (by OIML recommandation)

Description of the WIM Project 4 years project : 2013-16 IFSTTAR/ CETE Est and Ouest Objective: Implementation of HS-WIM for direct enforcement of overloading 2 phases : Phase 1 (2013-14): feasibility study for OIML type approval of an HS-WIM system Phase 2 (2015-16): construction and test of a prototype

Organization WP3 : MS-WIM WP4: Bridge WIM WP2 : Interaction sensor/pavement WP1: Feasibility of OIML type approval Transv WP : On site test WP5 : Expert study

Technical mean: Accelerated Pavement Testing Facility

Budget First phase (2013-14): 777 k€ Second phase (2015-16): 728 k€ Consumables, etc.: 177 k€ Staff: 600 k€ (50 MM) Second phase (2015-16): 728 k€ Consumables, etc.: 150 k€ Staff: 578 k€ (48 MM)

Participation of Vendors Welcome in this project to take part in the experimentations to contribute to and benefit of the R&D effort to develop market solutions and products IFSTTAR will issue a document describing the conditions of participation to this project (participation contract) + organise meetings Contact persons: louis-marie.cottineau@ifsttar.fr bernard.jacob @ifsttar.fr

Thank you