ESHAC #8 Safety Readiness Review Thomas Hansson, ESH

Slides:



Advertisements
Similar presentations
EQUIPMENT VALIDATION.
Advertisements

FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
Systems Engineering Management
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Effective Methods for Software and Systems Integration
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Introduction to Software Quality Assurance (SQA)
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Steve Griffith February 28th, 2017
Software Reviews Ashima Wadhwa.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
ESS licensing process and Readiness Reviews
Accelerator Readiness Review October 31, 2006
Session 2 Dr. Dan C. Surber, ESEP
Supportability Design Considerations
World Health Organization
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
CAD/PAD Development Process
Software Configuration Management
Accelerator Operations Department Readiness (Part 2)
Software and Systems Integration
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
Flooding Walkdown Guidance
Quality Management Systems – Requirements
Engineering Processes
Lockheed Martin Canada’s SMB Mentoring Program
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
ESHAC #9 Safety Readiness Review “Lessons learned”
Helen Boyer OHS group leader
M. Scharfenstein - ES&H Coordinator 14 May 2009
Operations/Control room organization during commissioning
Workshop commissioning Installation Coordination at ESS
Ian Evans SSRL Safety Office
TS2 PSS Architecture, Concepts of Operations and Interfaces
Welcome and charge to the committee
Testing Coordination at ESS
Introduction and Safety Plan
PSS verification and validation
ESS Management System SSM visit 24th October
PSS Verification and validation
Safety Analysis and Safety Functions
Technical Documentation Coordinator
On behalf of protection systems
Radiation Protection Handbook
Safety Readiness Review (SRR) Thomas Hansson, ESH
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson ESS Accelerator Collaboration Board Meeting Trieste
DOE Review of the LCLS Project October 2006
Machine Protection PLC Based System Verification and Validation Plan
High Level Readiness Reviews
Licensing update ESHAC #7, October 2017
Lessons from the 1st Safety Readiness Review
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Atefeh Sadeghzadeh Control engineer – Target safety and control
Charge and Agenda of the 18th TAC meeting
Stuart Birch On behalf of Protection Systems Group
Presentation transcript:

ESHAC #8 Safety Readiness Review 2018-04-10 Thomas Hansson, ESH www.europeanspallationsource.se

Outline Safety Readiness Reviews (SRR) ESS reviews Status and next steps Preparations for SRR1

Safety Readiness Reviews The purpose is to review readiness to safely commission/operate. It is a process by which HARDWARE, PERSONNEL and PROCEDURES associated with commissioning/operation are verified. The scope is safety, both conventional safety and ionizing radiation. The ownership of the process lies within ESH division. The scope of SRR1 (end of June 2018) is limited to the Ion Source (IS) and the Low Energy Beam Transport (LEBT)

ESS Reviews SRR Describes verification activities, resources, associated requirements prior to commissioning, after parts have been built and installed. Specifying “As-built”. Reports the outcomes of the verification activities. Specifying “As-verified”. FR, system Functional Review PDR, system Preliminary Design Review CDR, system Critical Design Review FAT, system Factory Acceptance Test SAT, system Site Acceptance Test TRR, system Test Readiness Review SAR, System Acceptance Review ORR, system Operation Readiness Review ESS-0091812

Status and next steps Activity Appointment of SRR process owner (ESS-0118414) August 2017 SRR process description (ESS-0123091) January 2018 Description of needed documentation (ESS-0177837)* November 2017 Internal communication (AD Tech Board, Brightness session) November 2017 Scheduling of SRR1 for IS & LEBT Recently Invitation to internal/external SRR team Next step Proposal with Members, Invitation letter, Charge & Agenda exists since February Follow-up on progress of preparations Next step Documentation* to be distributed to SRR Committee Members 18th of June Safety Readiness Review of IS & LEBT (1,5 day) Last week of June

Preparations for SRR1 (IS & LEBT) Documentation needed prior to a SRR. Possible to provide 1 concluding document with references. Descriptions of expectations on the documentation is found in ESS-0177837. Design descriptions purpose of the system technical solution, derived from relevant requirements Architecture description the specific system, involved equipment and devices. interfacing systems appropriate pictures and schematics Concept of Operations scope of proposed testing. operation modes of the system, including maintenance needed operators, disciplines, training requirements list of the specific individuals that are qualified to operate the system Requirements Specification Test envelope limitations and conditions Hazard identification Safety systems, belonging administrative procedures and their limits and conditions Descriptions of the derived requirements for safety systems (engineered controls) together with a description of the administrative procedures (administrative controls) which should include both the perspective of prevention and mitigation. required personal protective equipment. procedures describing handling of deviation from the testing envelope Interface descriptions interfaces / boundaries (access control, ventilation, power supply, etc.) Integration Plan includes intermediate demonstrations (for instance for belonging supporting systems and/or safety systems) finally leading to test readiness of the specific system of interest. can refer to already performed verification of required subsystems supporting systems and/or safety systems. Operation and maintenance documents allowed testing envelope from an operator point of view specific operating and maintenance procedures A list of the safety systems (engineered controls) together with alarm response procedures (administrative controls), that shall be available for the operators.   Verification Plan detailed steps to be followed to verify a system meeting requirements who when and where responsibilities of each participant and the documents to be prepared as a record consider validation plans, and even validation reports, from underlying subsystems. Verification Report Identifies the type of verification performed and reports on the results also cover “Lessons learned” in order to share gained experience

Thank you! Questions?

How do activities relate to each other? Backup slide How do activities relate to each other? “Internal readiness” is owned by the System Owners and accomplished by: lower level SAR and ORR for all concerned sub-systems (for instance “sub-system level” below) the specific level of TRR (for instance “ESS level” below) A SRR is an independent review of the safety aspects, after the corresponding TRR.

ESS Management System Expectations Backup slide ESS Management System Expectations ESSMS expectation SRR focus prior to commissioning Comment Design descriptions Description of the purpose of the system and the technical solution. Architecture description Description of the system, involved equipment and devices. Concept of Operations Descriptions of operation modes including maintenance modes and need of operators, their disciplines and their training requirements. Requirements Specification Descriptions of operational limits and conditions for the specific testing envelope, belonging hazard identification together with the requirements for engineered controls and administrative controls (preventing and/or mitigating controls). Interface descriptions Interfaces and boundaries to the surrounding structures, systems and components, for instance access control, supporting systems, power supply, etc. Integration Plan The integration plan is expected already in connection to the CDR, and includes intermediate demonstrations finally leading to the main validation activity; commissioning. Operation and maintenance documents The specific operating and maintenance procedures including the allowed testing envelope, list of administrative and engineered controls together with emergency response procedures. Verification Plan Prior to any verification activity a test readiness review (TRR) will assess the maturity of the resources for supporting the verification activities for a system (test stand accessibility, test equipment readiness, availability of the personnel). The System Verification Plan documents the detailed steps to be followed to verify and ensure that a product or system meets its specific list of requirements. The verification plan defines: who does the verification; when and where it is to be done; the responsibilities of each participant before, during, and after each verification; the hardware and software to be used (and other systems if applicable); and the documents to be prepared as a record of the verification activity. Could also consider validation plans, and even validation reports, from underlying subsystems. Verification Report - Identifies the type of verification performed and reports on the results of the verification activities.