Machine Directorate All-hands meeting November 14, 2017

Slides:



Advertisements
Similar presentations
Hargrave Street Pumpstation – Site Preparation July 2014.
Advertisements

Change Request Routing from the CUB (H01) to D04, D07, D08, E04 for the DMSC network. Routing from the CUB (H01) to D04, D07, D08, E04, G02, G04, F03 for.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
Agenda / Logistics John J. Barnard Twelfth US - Japan Workshop on Heavy Ion Fusion and High Energy Density Physics September 7-8, 2009 Intercontinental.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
OFFICE OF SCIENCE The Making of the Spallation Neutron Source A 25-Year Journey Patricia Dehmer Deputy Director for Science Programs & Acting Director.
Accelerator/program Mats Lindroos Head of accelerator April 21, 2015.
Instrumentation of the Controls Configuration Directory Service J. Luis González Arias BE3528 Software Developer for the Accelerator Controls Configuration.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI ISIS Developments David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory.
CSNS cryogenic system Institute of High Energy Physics Guoping Wang June 21, 2016.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
ITE Hirakjyoti Nath Class 7
Report Technical Director Storage-Ring-Installation Completed
Linac4 status and perspectives
The CERN Linac4 history, performance, perspectives
UPS power distribution for LHC Beam Dumping System

PLC-based control systems at SOLEIL - ICALEPCS 2017
Chairman – Telecom Commission Members of Telecom Commission
Advanced-Fusion Neutron Source
Enzymes.
Hot Checkout System for LERF Resuscitation
Welcome to NADDI 2013 hashtag #NADDIconf
Lesson 6 Wrap-Up.
Lesson 6 Wrap-Up.
IPLI PLM Roundtable Agenda PLM Roundtable INTRODUCTION
National Groundwater Modelling System Software workshop pre-release PR07 Peter Gijsbers.
LHC upadtes.
ESHAC meeting October 1-2, 2018
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI
5b - In-depth Assessment economic analysis - progress report SCG meeting 5 November 2008 Anita Payne, Unit D.2, DG Environment, European Commission.
Welcome and Logistics European Commission CEOS 2018 Chair team
1v1.
ESS Project Status Roland Garoby – Technical Director August 2018.
High School Engineering Design Training
BCM-BIS Interface Szandra Kövecses
Summary & Concluding remarks
Operations/Control room organization during commissioning
Ciprian Plostinar Workshop on Testing and Commissioning
Announcements.
I-LHC NOMINAL ions beam in 2007
ISRC and LEBT Vacuum System Design
Welcome and charge to the committee
Water Directors meeting Mondorf-les-bains, June 2005
MPS commissioning at ESS
PSS Verification and validation
Ion Source and LEBT Beam Diagnostics
SOLID Collaboration Meeting
Licensing update TAC 18 October 2018
Radiation Protection Handbook
European Spallation Source ERIC
NAPAC19 First SPCC Meeting
Lessons from the 1st Safety Readiness Review
ESHAC Meeting # Peter Jacobsson Head of ESH
Charge and Agenda of the 18th TAC meeting
ESS Value Engineering and Cost Reduction Initiative
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Radiation fields During 1st stage beam commissioning
The Management System at Work (Ion Source and LEBT commissioning)
Accelerator Installation Schedule
Machine All Hands meeting #4 WoW-Ways of Working
Lessons Learned: Comments from Operations
Project Coordination Group (PCG) for the implementation of the MSFD
IS&LEBT Commissioning Review Safety and Radiation Protection
Presentation transcript:

Machine Directorate All-hands meeting November 14, 2017 13:00 - 13:10 Welcome 13:10 - 13:40 Remarks from the DG 13:40 - 14:05 Pre-Ops and Garfunkel 14:05 - 14:25 Move to Site 14:25 - 14:50 Site status and enablement of the machine design 14:50 - 15:15 All what you always wanted to know about PSS… 15:15 - 15:45 Coffee break

Machine Directorate All-hands meeting November 14, 2017 15:45 - 16:10 Neutron Beam Extraction System 16:10 - 16:35 TSS Overview and Reliability 16:35 - 16:55 Ortho and para hydrogen catalyst selection 16:55 - 17:15 Accelerator Installation, Test and Commissioning Plan 17:15 - 17:35 Cryogenics - Installation progress and lessons learnt 17:35 - 18:00 Ion Source and LEBT 18:00 - 20:00 Mingle/cocktail