ECE 135 – The Three Presentation 9

Slides:



Advertisements
Similar presentations
SWR Meter/Low Pass Filter Session 4
Advertisements

Wireless Controller wireless.controller.googlepages.com Spring 2007 Preliminary Design Review March 3, 2007 wireless.controller.googlepages.com.
Created By: Kevin Pace For Virginia Beach City Schools.
ECE 135 – The Three Presentation 10 Bryan Chavez with Pat Cleary & Kevin Parker April 14 th, 2005 April 14 th, 2005.
Presenter: Kenny Haulk
Gigabit Ethernet PMD Opto-Link, Inc. – Progress Summary Vinh Nguyen, Clifton Kerr, Andrew Meyerson, Bryan Justice April 21, 2005.
Senior Design Project: Group IV Gigabit Ethernet Optical Transceiver Group Members: Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Rahmin Sarabi Adam Durity.
Unit 9.2_Lesson 2_CD Resource 2f_Plenary Gantt charts From the Gantt Chart answer the question.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
Presenter: Curtis Grens April 3, Highlights of the Last Week Connectorized PD on current board replaced with unconnectorized PD Second board constructed,
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
Presenter: Kenny Haulk. 2 This Week’s Highlights Tested Receiver with attenuation and shielding Measured power output from GDS1250 TX and our own VCSEL.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Arithmetic Sequences Recognize and extend arithmetic sequences.
BSOP 326 Week 1-7 All Discussion Questions (Devry) FOR MORE CLASSES VISIT WEEK 1DQ 1 What is Total Quality Management WEEK 1DQ 2 A.
UNDERSTANDING COMPUTERS From the Beginning: History of the Computer.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
Project GabE ECE 135 – Spring 2005 Patrick Crosby Adam Durity Rahmin Sarabi Omar Al-Jadda.
ECE Group 2 – Presentation 8
Opto-Link, Inc. – Status Report 8 Clif Kerr March 31, 2005
ECE 135 – BtrLaytDanNvr Presentation 7
Kevin Parker with Bryan Chavez & Pat Cleary February 24th, 2005
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
Algebraic Sequences.
Presenter: Chris Lambrecht
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
ECE 135 – Group 3 Presentation 1-2
Gigabit Ethernet Design ECE 4006C – Spring 2003
المدخل إلى تكنولوجيا التعليم في ضوء الاتجاهات الحديثة
Gigabit Ethernet Design ECE 4006C – Spring 2003
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019.
ECE 4006 Group 6 – Presentation 8
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Project GabE ECE 135 – Spring 2005
Optical Gigabit Ethernet
Capstone Design Update
ECE 135 – VCSEL Kings Presentation 5
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
“Breadboarding” a Simple FM Transmitter
Optical Gigabit Ethernet
Status Presentation February 20-27, 2003 Michelle Middleton.
Harmonic Cancellation Connecting Loads Through Phase Shifting Transformers Dave Loucks, Ph.D., PE, CEM.
Progress Report (October 2 - 9, 2002)

Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
GROUP 1 FINAL PRESENTATION
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
GIGABIT ETHERNET DESIGN ECE Spring 2004
Project GabE ECE 135 – Spring 2005 Presentation 10
Project GabE ECE 135 – Spring 2005 Week 9
Capstone Design Update Week 9 ECE 4006 – Group 1
Contact Us 406 W. Cesar E. Chavez Blvd. San Antonio, TX
Presentation transcript:

ECE 135 – The Three Presentation 9 Kevin Parker with Pat Cleary & Bryan Chavez March 31st, 2005

Work Summary Soldered and Tested Board 1B Soldered and Tested Board 1Γ Board 1 Troubleshooting Finished Midterm Paper

GANTT Chart

Board 1 Construction

Further Board 1 Troubleshooting Receiver Circuit Functions Perfetto Continuing Issues with Tx Blew up more ferrite bead inductors Further Testing Needed Per Dr. Brooke’s Instructions

Receiver Testing PRBS7 Pattern 0 dB – 7 dB Attenuation

Transmitter Testing

Transmitter Testing

Future Work Continue Troubleshooting Board 1 Reanalyze Tx Design Board 2 Order Board 2