LHC status - Week 35 G. Arduini, M. Lamont Main aims:

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

02/09/2010 Access conditions for test of the RB.A23 at 17:30. Splice mapping. Complete machine closed by ~18:00.Problems in getting TI2 ready for injection.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Machine Coordinators: G. Arduini, J. Wenninger
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Status of LHC Operations
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Summary of Week 11: 14 – 21 March
LHC Operation Week 38 Coordination G.Arduini, R.Bailey
Summary of Week 13 G. Arduini, B. Holzer
LHC commissioning Week 38
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
Saturday 2/4/ :00-09:00 Problems with SPS:
Tuesday 20 March 2012.
Week 35 – Technical Stop and Restart
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Week 36 Machine coordinators R.Assmann, R.Bailey
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Yesterday morning Held 1647 for a while – SPS kicker problem
Saturday 7th May Sat – Sun night
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
IP8 aperture measurements (07:30-10:30)
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
MD Planning Fri – Sat (1. – 2.7.)
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Summary Tuesday h23: Machine closed. Precycle started.
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Wednesday 23/2 Thanks CRYO!!!.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Wednesday h18: 228b fill lost just before start of ramp.
RAMP FOR COLLIMATOR SETUP
Another Immortal Fill….
Thursday Morning/Afternoon
31/3/2010 Difficult day… but at the end stable beams.
Tuesday
Presentation transcript:

LHC status - Week 35 G. Arduini, M. Lamont Main aims: Recovery after technical stop Commissioning of ramp with 10 A/s Commissioning of bunch trains with 150 ns spacing

Statistics From the end of the technical stop (Thu 2/9 at 18:00 to Mon 6/9 07:00) Beam: 48 % Set-up without beam: 18 % Faults: 34 % Major stops: Cryogenics Sector 34 (~13 h), QPS (~6 h), XPOC (~3 h), PS MPS cooling & RF trip of 4 cavities (~2 h)

RB.A23 Switch-opening test on RB.A23 caused quenches in 4 magnets: B23R2 at 22:38:55.196 Elec. perturbation of 2nd switch triggers old QPS (board B) A23R2 at 22:38:55.704 500 ms later, little understood propagation phenomenon C23R2 at 22:41:19 symmetric quench by thermal propagation @ 400 A B22R2 at 22:41:19 heaters fired as 3 neighbors were quenched A23R2 previously measured excess splice resistance by nQPS: 28 nOhm. Measurement individual aperture- and inter-aperture-splice resistances. preliminary analysis confirms the order of 30 nOhm – no degradation. Excess resistance is not concentrated in one splice but is distributed in both apertures. OK for powering 1st switch 2nd switch B23R2 A23R2 U_HDS: U_QS0: A23R2 resistive transition

Commissioning steps Crossing angles setting-up 10 A/s ramp and squeeze Injection/Injection protection RF and Transverse feedback Bunch train setting-up in the injectors

Crossing angles Polarities for ALICE solenoid/spectrometer: + + (last time changed in May!) Polarity for LHCb spectrometer: - External crossing angles: IR1: -170 mrad at inj./ramp and -100 mrad in squeeze/collision IR2: ±170 mrad at inj./ramp and ±110 mrad squeeze+collision IR5: +170 mrad at inj./ramp and +100 mrad in squeeze/collision IR8: -170 mrad at inj./ramp and -100 mrad in squeeze/collision IP2 with parallel separation (3 to 4 sigmas).

ALICE Polarity Change Can be corrected using compensator magnets and MCBX  need time to verify corrections to be implemented for each polarity.

Crossing angles Non-closures (rms): - B1 H/V : 0.44/0.27 mm - B2 H/V : 0.14/0.31 mm Calculated corrections for each point separately

Crossing angles Non closure corrected Golden orbit defined at 450 GeV/c. Ramp with crossing angles ON done. Measurement and non closure correction calculation during the squeeze.

10 A/s ramp Chromaticity during the ramp  feedforward to be implemented today via expert application R. Steinhagen

Squeeze Beta-beating measurements: reproducible R. Tomas et al.

Squeeze Correction of beta*: below 20%. Clear improvement in the V-plane. Verification and possible second iteration ongoing (issues with the incorporation of the trims being addressed) R. Tomas et al.

Squeeze (Beta*) R. Tomas et al. Before correction (June-July measurements) Beam1: X Y IP1 3.75±0.1 4.04±0.28 IP2 3.36±0.68 2.91±0.50 IP5 3.80±0.67 3.10±0.51 IP8 3.25±0.39 3.63±0.45 Beam2: X Y IP1 3.69±0.32 3.44±0.05 IP2 3.37±0.06 4.03±0.14 IP5 3.80±0.13 4.12±0.14 IP8 3.77±0.07 2.92±0.25 After correction Beam1: X Y IP1 3.87±0.04 3.82±0.58 IP2 3.53±0.25 3.45±0.06 IP5 3.67±0.13 3.35±0.13 IP8 3.30±0.05 3.62±0.11 Beam2: X Y IP1 3.41±0.70 3.84±0.19 IP2 3.85±0.43 3.57±0.15 IP5 3.70±0.10 3.79±0.06 IP8 3.67±0.06 3.36±0.05 R. Tomas et al.

Injection protection Beam 1: Beam 2: Injection protection collimators re-centered with (vertical) crossing angle ON TDI: angular scan performed. A further control on the sign of the tilt for the upper jaw is needed. TCLIA and TCLIB have been re-centered for B1. 5 mm orbit offset found at TCLIA. Beam 2: Centering of injection protection collimators: no relevant difference has been recorded, as expected (horizontal crossing). All new settings and thresholds have been updated in the trim application for the fastRamp beam process. Settings and threshold tested via the sequencer. Injection of nominal bunch OK C. Bracco, B. Goddard

Transverse feedback Noise reduction of the BPM by factor ~2 by optimization of the dynamic range. Saturation level set to ±2 mm for 1 ns bunch length and 1.3x1011 Before improvement it varied between 1.8 um and 2.8 um. Main aim: allow detecting smaller oscillation amplitudes (e.g. Hump) and allow operation at larger gain During tests observed problem: “Close to zero there is a small glitch observed”  to be further investigated W. Hoefle, D. Valuch

RF New RF functions: capture voltage set to a fixed 3.5 MV during flat bottom using -+ 60 deg counter-phasing and scalar 7 MV total in order to allow operation with all cavities ON during first 50 s of ramp, zero counter-phasing and reduce scalar voltage from 7 to 3.5 MV. Voltage seen by beam ~ constant 3.5 MV then ramp voltage linear from 3.5 MV to 8 MV (reached at end ramp) start long blow-up when voltage reaches 5 MV (one third of ramp) P. Baudrenghien

Bunch train setting-up in the injectors Cycle for up to 4 x 12 bunches with 150 ns spacing commissioned. Bunch population ~1x1011 Transverse emittances in the range 2.5-2.7 mm (initially obtained by transverse blow-up in the PS and SPS) since yesterday completely done in the PS From time to time observed long bunches at injection in the SPS Transfer line setting-up to be performed

Others Splash events for CMS (Beam 1) last night: took longer than expected: Inject & dump limited by XPOC analysis time+ FMCM interlocks from time to time on the SPS extraction septum.

Plan Squeeze with beta-beating correction incorporated on-going together with verification of the non-closure of the crossing angles. Expected to continue until midday Injection/Injection protection set-up Collimation set-up at 450 GeV Next coordination team: R. Assmann, R. Bailey

Pending requests Access in point 2 for scope removal (K. Dahlerup-Petersen) – 3 hours (including re-qualification of the QPS after intervention) Sector 78 energy extraction test (K. Dahlerup-Petersen) – 2 hours