MB Maarten Litmaath CERN v1.0

Slides:



Advertisements
Similar presentations
GLexec update GDB Maarten Litmaath CERN.
Advertisements

New VOMS servers campaign GDB, 8 th Oct 2014 Maarten Litmaath IT/SDC.
WLCG Service Report ~~~ WLCG Management Board, 27 th October
A short introduction to the Worldwide LHC Computing Grid Maarten Litmaath (CERN)
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) WLCG GDB, CERN 8 July 2015.
WLCG Service Report ~~~ WLCG Management Board, 24 th November
Marian Babik, Luca Magnoni SAM Test Framework. Outline  SAM Test Framework  Update on Job Submission Timeouts  Impact of Condor and direct CREAM tests.
WLCG Service Report ~~~ WLCG Management Board, 1 st September
Maarten Litmaath (CERN), GDB meeting, CERN, 2006/02/08 VOMS deployment Extent of VOMS usage in LCG-2 –Node types gLite 3.0 Issues Conclusions.
MW Readiness Verification Status Andrea Manzi IT/SDC 21/01/ /01/15 2.
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
Andrea Sciabà CERN CMS availability in December Critical services  CE, SRMv2 (since December) Critical tests  CE: job submission (run by CMS), CA certs.
MW Readiness WG Update Andrea Manzi Maria Dimou Lionel Cons 10/12/2014.
Alberto Aimar CERN – LCG1 Reliability Reports – May 2007
WLCG Service Report ~~~ WLCG Management Board, 7 th September 2010 Updated 8 th September
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Update Authorization Service Christoph Witzig,
WLCG Service Report ~~~ WLCG Management Board, 23 rd November
Distributed Analysis Tutorial Dietrich Liko. Overview  Three grid flavors in ATLAS EGEE OSG Nordugrid  Distributed Analysis Activities GANGA/LCG PANDA/OSG.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks glexec/SCAS pilot service Status and short-term.
LCG Pilot Jobs + glexec John Gordon, STFC-RAL GDB 7 December 2007.
WLCG Service Report Jean-Philippe Baud ~~~ WLCG Management Board, 24 th August
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
MW Readiness WG Update Andrea Manzi Maria Dimou Lionel Cons Maarten Litmaath On behalf of the WG participants GDB 09/09/2015.
Summary of SC4 Disk-Disk Transfers LCG MB, April Jamie Shiers, CERN.
WLCG Service Report ~~~ WLCG Management Board, 10 th November
David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 LHCOPN Meeting January 2007 Many thanks to DANTE for hosting the meeting!! Thanks to everyone.
The Worldwide LHC Computing Grid WLCG Milestones for 2007 Focus on Q1 / Q2 Collaboration Workshop, January 2007.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
INFN Tier1/Tier2 Cloud WorkshopCNAF, 22 November 2006 Conditions Database Services How to implement the local replicas at Tier1 and Tier2 sites Andrea.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Direct gLExec integration with PanDA Fernando H. Barreiro Megino Simone Campana.
Maarten Litmaath, GDB, 2008/06/11 1 Pilot Job Frameworks Review GDB working group mandated by WLCG MB on Jan. 22, 2008 Mission –Review security issues.
Argus EMI Authorization Integration
T0-T1 Networking Meeting 16th June Meeting
WLCG IPv6 deployment strategy
LHC[OPN/ONE]  IPv6  status
OpenSSL and Java 7 vs. 512-bit proxy keys
“A Data Movement Service for the LHC”
Dirk Duellmann CERN IT/PSS and 3D
Multi User Pilot Jobs update
LHCOPN update Brookhaven, 4th of April 2017
Security aspects of the CREAM-CE
Flavia Donno CERN GSSD Storage Workshop 3 July 2007
GDB 8th March 2006 Flavia Donno IT/GD, CERN
CREAM Status and Plans Massimo Sgaravatto – INFN Padova
Database Readiness Workshop Intro & Goals
How to enable computing
Massimo Sgaravatto INFN Padova On behalf of the CREAM product team
The CREAM CE: When can the LCG-CE be replaced?
CASTOR-SRM Status GridPP NeSC SRM workshop
LHCb Computing Model and Data Handling Angelo Carbone 5° workshop italiano sulla fisica p-p ad LHC 31st January 2008.
Deployment of IPv6-only CPU on WLCG – an update from the HEPiX IPv6 WG
glexec/SCAS pilot service
Deployment of IPv6-only CPU on WLCG – an update from the HEPiX IPv6 WG
Summary from last MB “The MB agreed that a detailed deployment plan and a realistic time scale are required for deploying glexec with setuid mode at WLCG.
WLCG security landscape in EGI and beyond Maarten Litmaath CERN v1
John Gordon, STFC GDB October 12th 2011
Grid status ALICE Offline week March 30, Maarten Litmaath CERN-IT v1.1
WLCG Service Report 5th – 18th July
1 VO User Team Alarm Total ALICE 2 ATLAS CMS LHCb 14
Take the summary from the table on
LHC Data Analysis using a worldwide computing grid
WLCG Collaboration Workshop: Outlook for 2009 – 2010
WMS Options: DIRAC and GlideIN-WMS
Argus: General Introduction
WLCG Status – 1 Use remains consistently high
IPv6 update Duncan Rand Imperial College London
Dirk Duellmann ~~~ WLCG Management Board, 27th July 2010
The LHCb Computing Data Challenge DC06
Presentation transcript:

MB 2011-10-11 Maarten Litmaath CERN v1.0 MUPJ - gLexec update MB 2011-10-11 Maarten Litmaath CERN v1.0

Maarten Litmaath (CERN) Site /ops/Role=pilot job + glexec test Oct 10 Capability ASGC OK BNL OK for ATLAS CERN CNAF FNAL OK for CMS IN2P3 KIT NDGF n/a NIKHEF PIC RAL SARA TRIUMF Maarten Litmaath (CERN)

Maarten Litmaath (CERN) Nagios tests for “ops” LCG-CE https://sam-glexec.cern.ch/nagios/cgi-bin/status.cgi? servicegroup=SERVICE_CE&style=detail CREAM servicegroup=SERVICE_CREAM-CE&style=detail Maarten Litmaath (CERN)

Maarten Litmaath (CERN) Nagios tests for LHCb Site /lhcb/Role=pilot job + glexec test Oct 10 CERN OK CNAF IN2P3 - KIT NIKHEF PIC RAL SARA No tests since Oct 6: pilot proxy expired? CREAM CEs not tested yet https://sam-lhcb.cern.ch/nagios/cgi-bin/status.cgi? servicegroup=SERVICE_CE&style=detail Maarten Litmaath (CERN)

Test status for ATLAS (Jose Caballero) Site /atlas/Role=pilot job + glexec test June 7 ASGC LCMAPS error on WN, should be fixed now BNL Basic tests OK, Athena tests failed, not yet investigated CERN OK, workaround applied for glexec mapping according to VOMS CNAF OK IN2P3 KIT NDGF n/a NIKHEF PIC RAL SARA TRIUMF Maarten Litmaath (CERN)

Maarten Litmaath (CERN) Test results for CMS Site /cms/Role=pilot job + glexec test Oct 10 ASGC OK CERN CNAF FNAL IN2P3 3 CE always OK, 3 CE error 203 - configuration problem ? KIT NDGF n/a PIC RAL https://sam-cms.cern.ch/nagios/cgi-bin/status.cgi? servicegroup=SERVICE_CE&style=detail https://sam-cms.cern.ch/nagios/cgi-bin/status.cgi? servicegroup=SERVICE_CREAM-CE&style=detail Maarten Litmaath (CERN)

T2 gLExec deployment campaign Broadcasts sent to T2 lists and LCG-Rollout on May 2 No traffic on dedicated mailing list Some went directly to the Argus support list Again more sites now claiming glexec support in the BDII 67 = 47 EGI + 20 OSG Was 41 = 26 + 15 in June Some T2 consistently OK in Nagios, but many are not https://twiki.cern.ch/twiki/bin/view/LCG/GlexecDeployment How to implement gLExec on the WN Includes example script for Argus configuration Provided by Antonio Delgado of CIEMAT  OK site in Nagios! Maarten Litmaath (CERN)

Maarten Litmaath (CERN) Experiment plans Wait for the Security TEG discussion outcome CMS enabling glexec in glidein-WMS per site where it works Socket reset problem cured by Condor patch Fix in glexec would be more appropriate and is foreseen ALICE implementing verification of payload signatures Algorithm to be copied into glexec LCMAPS plugin No user proxies needed on the WN Maarten Litmaath (CERN)