July 2015 SG CUB Closing Report Date: 2015-07-16 Authors: Notice: This document has been prepared to assist IEEE 802.19. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.19. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the TAG of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <shellhammer@ieee.org> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.19 TAG. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Hyunduk Kang, ETRI Steve Shellhammer, Qualcomm
July 2015 Abstract This is SG CUB closing report from July 2015 plenary meeting in Big Island, Hawaii, U.S.A. Hyunduk Kang, ETRI
Results of the Week (1/2) Technical contribution July 2015 Results of the Week (1/2) Technical contribution Expected Performance Improvement in New Coexistence Scenario and Use Cases for IEEE 802.19.1 - Simulation Results - (19-15/0054r0) Review the latest draft PAR (19-15/0028r7) and draft CSD (19-15/0029r5) Revision on PAR and CSD based on comments from other WGs Comments and revision on PAR (19-15/0061r0) PAR (19-15/0028r8): Updated CSD (19-15/0029r5): No update because there is no comments Hyunduk Kang, ETRI
Results of the Week (2/2) Revision on TG press release (19-15/0045r1) July 2015 Results of the Week (2/2) Revision on TG press release (19-15/0045r1) Decisions Revised PAR passed SG and WG motion Revised TG press release passed WG motion Hyunduk Kang, ETRI
Teleconferences No teleconference before September F2F meeting July 2015 Teleconferences No teleconference before September F2F meeting Hyunduk Kang, ETRI
Move Forward TG CUB will be started on September F2F meeting July 2015 Move Forward TG CUB will be started on September F2F meeting SG CUB chair really appreciate all participants and their contributions on SG CUB Hyunduk Kang, ETRI
Suggested TG Timeline (19-15/0044r1) July 2015 Suggested TG Timeline (19-15/0044r1) PAR/CSD submission June 1, 2015 PAR/CSD Approval EC July 17, 2015 NesCom September 2, 2015 WG Letter Ballot Initial November, 2016 1st Recirc. March, 2017 2nd Recirc. May, 2017 Form Sponsor Ballot Pool May, 2017 IEEE-SA Sponsor Ballot Initial August, 2017 1st Recirc. November, 2017 2nd Recirc. January, 2018 Final WG and EC approval March, 2018 Final RevCom approval May, 2018 Hyunduk Kang, ETRI