The Refurbishing Process

Slides:



Advertisements
Similar presentations
The following photo essay shows a 2011 Hyundai Equus Sedan being transformed from a running passenger car into a specialized platform used for photographing.
Advertisements

Hercules Sizing Tester 2012
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Cisco 6500 E-Series Chassis Up-grade
For all your Beverage & Packaging Needs Industrial Mechanical Automation Ltd.
 Without reference, identify principles relating to Fixed Radiological X-RAY PM with at least 70 percent accuracy.
YOUR Hospital's DECON AREA A few things to consider.
Source One Source One Network and Building Solutions.
Assembly / Disassembly / Reassembly Computers. Chapter Objectives After completing this chapter you will: Understand how static electricity can damage.
1 TRAILER Pictures of Rusted Parts and Areas 2 TRAILER TIRES Before Sandblast and Prep.
5.8 Project Management Chapter 37 HL - Only.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Sodick High-Speed Small Hole Driller
Beds and Benches Mindy Moore HORT Beds for Cut Flowers Raised and Ground Beds Raised and Ground Beds The beds can be level with the ground or they.
Sylvan Theater Column Restoration Project
How Plotter4u Refurbishes HP Plotters A step by step pictured tour of the process of refurbishment.
Rapiline 28 Processor. Equipment Refurb Process Each piece of equipment Bob Weber, Inc. sells is thoroughly refurbished, tested, and cleaned before shipment.
Assembling a Computer Safety Precautions CPU Installation
1 Before and After The Appearance Program; enhances your company image contributes to your fleet vehicle safety communicates a professional advantage.
Safety ESD EMI Cleaning Safety for 10 Points True or false: you should wear long sleeves when working on a PC. True False.
Safety ESD EMI Cleaning Safety for 10 Points True or false: you should wear long sleeves when working on a PC. True False.
What is technology for you?.... How can we define Technology? We define Technology as the bridge between technique and science Science Technique Technology.
InDesign CS3 Lesson 4 ( Only pages ) Importing and Editing Text.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Project Status Update Mark Petree LCLS Self Seeding Status: Management put it on hold. – Preliminary conceptual design completed – Interference.
1 Presentation to Technical Services Step 1 - Walk-through of new premises Step 2 – This presentation will focus on next steps to relocate staff and departmental.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
Cctv Management Solution - CMS From – Intelitech Solutions Pvt. Limited. [ ITSPL Group ]
POWER WINDOWS. COMPONENTS n Master Switch n Individual Switch n Drive Motors n Rack and Pinion Flexible Strip n Safety Switch n Window Regulator.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Status of NA62 straw electronics Webs Covers Services Readout.
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
VELOPEX EXTRA - X Mk 1V Automatic dental X-ray film Processor
Art with Power.  40 Points Creativity- Did you come up with an original idea or design?  30 Points Composition- Did you fill the space? Did you put.
Successful Presentations A guide to preparing and delivering your presentation and avoiding common problems.
Planning a Display Steps for you to follow Decide Why Purpose, theme, and location of display Category or categories of merchandise to be displayed.
How to Approve & Receive.  Who Approves Transfers? Administrators at both the sending and receiving cost centers Title I Project Manager (If item on.
ETERE NUNZIO The ultimate end-to-end solution for your NewsRoom.
Poultry Equipment Used On Broiler Farms Ag. Ed. Computer Workshop June 27, 2002 Pictures and Program Prepared by John Sutton Georgia Agriculture Education.
SC2004 Exhibit Status. Proposed Schedule Exhibit ships from SLAC 7/22 Arrive Fermilab 7/29 Fermilab Quantum Universe display opens 10/1 Ship date to SC2004.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Level 1 – Maintenance activities Produced by Neil Liggett.
Body Works, Rims, Paint Preparation, Painting Farm Mech Instructor~ Mr. Reinders.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
LINDBERGH Chesterfield Mall Chesterfield, MO Prepared by: Rick Zavala Week 10 of 10.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
REPAIR MAIN HAVE BEEN WELDED RELEASE ELECTRONICADDITIONAL PERIPHERAL
This picture shows what the wiring of a new alternator looks like
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
News about the WA104 Programme
Report to: Overhaul Plating
The Chair Doctor Specialist repair & refurbishment of posture, nursing and riser/recliner chairs.
Circuits Lab Introduction
Emergency Electrical Power Supply for Buildings
Ben Press and Theodor Marcu FRS
Senior Project Portfolio Preparation
Maintenance Lubrication
Cashew Dryer User Manual
Smitty’s Two Minute Drill #1: Feeders and Branch Circuits
Pig Heart Dissection Activity
Student Name English IV 3A Teacher
Press Ad Screen-shot.
Click on Save All to save everything and choose a location etc
HELLO Today we want you to give us the opportunity to be your strategic provider.
FULL SUPPLY OF FIREFIGHTING EQUIPMENT ANS SERVICES
Who’s Responsible for Maintenance, Repairs and Care?
< How to assemble the Mechanical Interlock Unit AR-12M >
Butler County engineers Office
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Presentation transcript:

The Refurbishing Process On a SODICK A320D AWT

Before and after pictures of the A320D When the machine first arrives, it is showing its age. The end result of the meticulous refurbishing process.

Working on the Power Supply for the A320D Initially, there are many signs of ageing, wear and tear. Notice the replaced parts and cables. Everything looks brand new.

The control panel is updated. The control panel is dingy and covered with grime from use. Now it has been well cleaned, keypad and monitor replaced.

The Dielectric Tank is dismantled and completely restored. This is an important part of the A320D equipment. It’s cleanliness is important. The tank is taken apart, stripped and repainted

Special care is taken to make the work area look and work like new. This work table has clearly been well used. Rust is covering large parts of it. Sections of the table have been sandblasted and ground so they look new

The all-important threader, which automatically supplies the wire needed to operate the A320D. In this before shot, there is rust and calcification. Parts are also missing. The entire assembly has been cleaned and missing parts replaced with new ones.

The finished A320D AWT Ready for delivery.