TRAFFIC DESIGN UPDATE SPECIFICATIONS

Slides:



Advertisements
Similar presentations
ODOT Structure Project Management Seminar Bridge Preliminary Design Report.
Advertisements

Session 12 STEPS 3 AND 4. Stage 2 Detail Design Submission should include an updated cost estimate and the following: (Not every item listed will apply.
Structural Steel Construction
Salvage and Recycle Policy. Why Bother? Human Resources – increasing number of personnel actions Monetary value of materials Environmentally sound disposal.
Actions and Retrofit of Post Earthquake-Damaged Bridges
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Traffic Signal Maintenance – Best Practices
Nonlinear Analysis of Traffic Poles and Signal Lights Using New ATLAS V6.01 Bridge Software Institute, Gainesville, FL, USA.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
RMM Systems, LLC By Sam Rietta RMM Systems, LLC is a manufacturer's representative firm focused on providing value added sales solutions by providing.
Mid-Bay Bridge Connector Phase II and III December 2011 Project Update.
Please read this before using presentation This presentation is based on content presented at the Registration of cranes.
2015 Traffic Signals 101 Topic 3 Field Components.
FLORENCE & HUTCHESON LEE SEWELL, PE, SE.  SIGNAL AND LIGHTING STRUCTURAL ANAYLSIS (SALSA)  ANALYZES WIRE SPAN, MAST ARM AND HIGH MAST STRUCTURES.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
Overhead Sign Support Structures: Meeting AASHTO 2001 John W. van de Lindt CDOT Staff Bridge Communication Day – September 27, 2004.
Centre the check box and text Blow out this view STEP 2 From your web site.
WisDOT - Bureau of Structures Brandan Burger.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
Bilan du contrat Renco Piping contract F467 TS workshop Archamps Mai 25 th 2005 R. Principe TSCV.
2015 Traffic Signals 101 Topic 12 Special Provisions.
MnDOT Sample Plan - Jerry Kotzenmacher MnDOT
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
WisDOT - Bureau of Structures Matthew Coupar.  Anything “structural” – change in loading, structural capacity, pile locations  If in doubt, call us!
CIS 103 — Applied Computer Technology Last Edited: September 17, 2010 by C.Herbert Wireless Home Networks.
 All proposals will require electronic bidding unless waived in the advertisement Improves accuracy of the bidding process Reduces WisDOT resource requirements.
WELCOME to SpeakmanCompany.com!! The following guide will outline the key tools available on the Speakman Company web site. Please contact the marketing.
UAS Universal Anchoring Solutions The Helipost™ An environmentally friendly engineered alternative to expensive concrete anchors and piers, the Helipost.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Hazard Communication Presentation Presented by: Western Assurance Corp Desert Utility & Paving, LLC and Century Club Construction, LLC Design © 2005, 2012.
Load Modeling for Dynamic Studies ROS Meeting – July 2005 ERCOT System Planning.
FAST Enterprises, LLC 2013 Trainer’s Conference March , 2013.
2015 Traffic Signals 101 Topic 13 Maintenance. Office of Traffic, Safety, and Technology Maintenance Maintenance Agreements Agreements - the Maintenance.
Overview of Graphics (alias Drafting) Print multiple handouts on one page Select File – Print Edit the following selections to read: Select the OK button.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
ODOT Traffic Standards Engineer
API RP 6HP (draft 5.2) Status Presentation Tech Session II Summer Standards Conference.
Signing In Enter in your address and password to log in to the site. *****
COA Development Steps Analyze available forces.
Sign Structures Updates: Helpful Tips for Inspectors
STREET LIGHT DESIGNED BY
SAFETY AND INFRASTRUCTURE REQUIREMENTS FOR TEL-2 INSTALLATION IN THE LAB Paolo Magagnin (BE-BI-ML) 24 – April
Tauranga Transport Operations Centre TTOC. Region Update - TTOC Other areas TTOC manage and operate: CCTV  Transport, Crime, Libraries, ICT, Dog pound,
2015 Traffic Signals 101 Topic 6 Controller Operations.
6/23/2016 Quick Reference Parts Guide Introduction This Quick Reference Parts Guide is an easy way to locate part numbers to common replacement parts.
After Replacement MS 2406 with new motor
Relocation Services and Equipment Modification Services
CONTRACT DOCUMENTS & CONSTRUCTION
* Topic 12 Special Provisions
Steps To Solve Wireless Connectivity Issue On Your Roku Device For More details visit
Session II: System authority for ERTMS 4RP Trackside approval
Welcome We’re using a new cost system for BAJA SAE for the 2018 season. The main change will be moving away from an MS Excel document to an online system.
[Poster Title] [Your name] abstract methods results background
 Contact Us For More Detail Call Us On  Or You Can Check Our Website
SAFE WORK INSTRUCTIONS
Check Out for Bowflex Power Rod Review -
Inspection Metrics Gerry Fallon.
Create an Account Click on the button next to the Create Account Click
التعلم بالإكتشاف المراجع:
You must log in using both you address and your Full name before proceeding
SENIOR DESIGN PROJECT P08455
Traffic Light.
Materials Certification List
Elevated Voltage Testing Metal Streetlights
North Carolina Department of Insurance Office of State Fire Marshal
Now Buy Best External Door Hardware from Doorhardware
Pole Position Student Points Time
A B C D.
Presentation transcript:

TRAFFIC DESIGN UPDATE SPECIFICATIONS QUARTERLY DESIGN MEETING JANUARY 29, 2008

CONCLUSIONS Things are always changing Check with us at major project milestones Proper to go through Mary Ann or Fred

ADOT vs. MOA TS2 Level 2 TS1 Manufactures Assisted Startup In-House Startup Frangible Bases Slip Bases Loop Install/Location Detail on ftp site Standard Drawing T-32.01 In House Signal Timing Signal Timing & Adjustments HPS Lighting MH, Induction Lighting Signal Control Cable to Ped equip. 4C#14 to signal heads and buttons 5C#14 to signal Heads and 3C#14 to buttons

THINGS TO LOOK FOR IN THE FUTURE 01 AASHTO with fatigue category importance factors from Fatigue Category II Manufacturer assisted startup, 660-3.11, will still be used but we intend to phase it out by next year. This Item has been included under Signal System Complete.

NUTS & BOLTS Charpy requirements in 740-2.02 Welding re-written by bridge see 504-3.01 661 photocell Controller specifications reside in 740 for the NEMA TS2 Level 2 controller Anchor rods for signal poles included in 740-2.02 T52.15 the new foundation details and the MCL

RESOURCES ftp address: ftp://ftp.cadastral.info/dot-cadastral/Design_Engineering/Region%20Details/Traffic Contact for Pole Analysis Program: Steve Garlic Hg Engineers (LLC) 613 45 Place SE Salem Oregon 97301 503-362-5001

QUESTIONS?