© ART 2012 TWS. © ART 2012 www.advancedrailtech.com TWS.

Slides:



Advertisements
Similar presentations
Aspire Vertical Markets Banking, Finance and Insurance.
Advertisements

Division of Alcoholic Beverages and Tobacco In-State Manufacturers Monthly Report.
Plan My Care Training Care Management Working in partnership with Improvement and Efficiency South East.
1 Distribution Cabling Telephones are connected back to their exchange via a pair of wires in a cable. Such pairs are always twisted so that each wire.
AMS Time-Minder Comprehensive, payroll-integrated time and attendance systems for all industry groups and for all sizes of enterprise. Please click to.
How to make Parent Bookings Welcome to PTO (P arent T eacher O nline ) To exit this slideshow at any time, press ESC on your keyboard.
Airport ORM Guide VT-28 Safety Department. College Station – Easterwood Field (KCLL) Probability of Occurrence: C (May Occur in Time) Severity: III.
Operations on the BDMRR Dispatching for the Birmingham District Model RR.
ECORDIA Guidance.
RAJAR Website Training Manual Berlin: March 2013.
Welcome to Online HRS All your Human Resources needs in one easy to follow database system.
Follow these simple steps to login to the Rose Bay High intranet from home. To advance slides press the right arrow on your computers keyboard. Made By:
Welcome to this quick guide/presentation of M2TIEMPOS We’re an easy way to buy spare parts, engines and power.
FAMIS TRAINING The Basics. Basic FAMIS Training (Logging on & off, & basic screens.)  Before beginning this training you must request your user id and.
Introduction toVote411 Online Voters’ Guide LWVOR ConventionMay 2011 Vote411 is an online Voters’ Guide ✓ All work done at secure website ✓ League volunteers.
Making the most of Satellite Navigation and Tracking Integration with your Business System.
SAKBase Training for Education Providers
Signal Basics. Signals: –Allow for safe operation of trains – protecting your train, other trains, and the equipment –Lets the railroad operate more efficiently.
CE 515 Railroad Engineering Line-haul Operations Source: Armstrong Ch 13 “Transportation exists to conquer space and time -”
Disabled Platform Access There are two designated parking bays immediately outside the front of the main college building. Disabled access both into the.
TRAIN OPERATIONS IN THE GARDEN
ETrack User Manual Penchant Software Inc. This manual was written using an Iphone 4s Version One of the keys to successful freight management,
Energy Smart Room GROUP 9 PRESENTERS DEMO DATE SPECIAL THANKS TO ADVISOR PRESENTERS Thursday April 19, 2007 Department of Electrical and Systems Engineering.
GPS. Meet the Bad Elf GPS Pro The Bad Elf GPS Pro offers the first Apple approved GPS with an informative user interface.
The Greener Side of FDOE: What We’re Doing For You! 62 nd Annual FAPT Summer Conference Naples Beach Hotel and Golf Club, Naples, FL. July 5-9, 2009 Presented.
Garmin GPS III Plus Data Collection. Objectives Collect: - Waypoints -Average Position Waypoints -Reference Waypoints - Multiple Tracks in One Track Log.
CE 515 Railroad Engineering
Office of Railroad, Pipeline and Hazardous Materials Safety Collision of Metrolink Passenger Train 111 and Union Pacific Freight Train LOF65-12 Signal.
SLC Online Booking System Booking an interpreter Online Tutorial.
Sequences and Conveyors By Dr. Jason Merrick. Simulation with Arena — Further Statistical Issues C11/2 Sequences Open the Arena File “BankNoSequences.doe”
RFID Children’s Game Jared Wilkin Chris Good. What does it Do? A set of stations that when deployed create an active children’s game Each station uses.
Dispatching Operations Department of Transportation Project DISPATCHERS.
Open Internet Explorer and type “help” (with no quotes) into the address line. Press Enter Entering Heat Tickets via the Web.
Semaphore Training HARLAN R. DICKSON DIVISION. U. S. Naval Sea Cadet CorpsCOMPASS :: What is Semaphore? Semaphore is a method.
Train timetables Time real life problems – Year 4/5.
Cigarette Distributing Agent’s Report. Log in with the user id and password provided through the EDS registration process and click on the Login button.
SuperShuttle Written By: Carlo Keuroghlian And Mitch Dye SuperShuttle LA.
Centralised Traffic Control Working On Dhamra line of ECoR
Sending Semaphore Trainer Norman Young KA4PUV. How to Use this Trainer It is easy enough to learn to recognize a semaphore signal, but when you send the.
Next step is to consider a range of possible careers. Log on to this website and register. Work your way through the In your last careers.
How it works APD’s head office in Hull inca intelligent GPS transponder * On board 12 channel GPS receiver * Universal communications interface *
ETrack User Manual Penchant Software Inc. This manual was written using a Samsung Galaxy Nexus phone with Android OS version (Jelly Bean) Version.
Processes Creation and Threads. Shared Resource Example The console is just a place where text can be printed by the application currently running. Program.
© ART 2012 TWS. © ART 2012  Provide an easy-to-use system to manage key information about train movements through the network  Manage track workers.
Times Tables 1 x 1=. Times Tables 1 x 2= Times Tables 1 x 3=
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
CE2303 Railway Engineering
MY NEST A TECHNOLOGICAL OVERVIEW. NECKLACE Reason: Hidden Less like being tagged and branded (jail)
Rules of the Road. I. Traffic Lights – must be obeyed unless a police officer directs otherwise.
BSBRA’S SCM An Informational Guide Created By: Anthony Garcia Jr.
Capricorn Suppliers running Caplink in Integrated mode do not need to manually check a Member’s Credit Status before attempting to enter an invoice in.
EMERGENCY RESPOSE SYSTEM “DIAL 100”. “DIAL 100” is an automated system to handle Public Distress by using PSTN, GSM/CDMA/Wireless Media, CTI based Solution.
Premise Information Entry Flagging an address. Sign into the WCPSN Gateway
Contact form LAW Click the web link
Register SPID - Retailer
NATE Blue Button Directory Detailed overview
Cambrian Lessons Learnt
Guide for the application of CSM design targets (CSM DT)
Advisor Advanced Release FW120.
RB Control Systems CUSTOMER pROFILEs
PL/SQL Scripting in Oracle:
Whistle and Horn Semaphore and Signal Lights
How to make Parent Bookings
Applying for 6th Forms, Colleges and Apprenticeships in Kent.
vInspect Application Training
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Auditing with GPS and on-board recording devices
PL & APL Training.
Rosenbergstrasse 74, 9000 St. Gallen
Rosenbergsstrasse 6, 9000 St. Gallen
Presentation transcript:

© ART 2012 TWS

© ART TWS

© ART 2012 TWS

© ART TWS

© ART 2012 TWS

© ART TWS

© ART 2012 TWS

© ART TWS

© ART 2012 TWS

© ART TWS

© ART 2012 TWS

© ART TWS

© ART 2012 TWS

© ART 2012 Provide an easy-to-use system to manage key information about train movements through the network Manage track workers accessing track sections Support existing operations which may be phone or radio-based Share information in real-time about train locations

© ART 2012 TWS emulates the traditional signalling processes of Absolute Block Working TWS stores records of movements to assist in preventing trains accidentally occupying the same section at the same time. The system prevents Movement Warrants being issued where the block section is already occupied by another train or track workers

© ART 2012 The following demonstration follows a pair of trains moving around the network The network in this example is simple but the system can be much more complex. Have a look at the layout

© ART 2012 The line runs from Alpha to Hotel via Echo and Foxtrot Station Alpha has 5 platforms + siding Station Bravo has 2 platforms, yard and through road Between each station there is a single line section of track Between Foxtrot and Golf there are 4 running lines

© ART 2012 The following demonstration follows trains moving around the network We shall move a train in each direction through the network from Station Alpha to Station Charlie

© ART 2012 Train 2AC01 is in Platform 2 at Alpha Train 2CA52 is in Down Platform at Charlie

© ART 2012

The Controller now issues Warrants: 2AC01 can move towards BRAVO 2CA51 can move towards BRAVO

© ART AC01 has received a Warrant to enter the section from Platform 2 at Alpha 2CA52 has received a Warrant to enter the section from Down Platform at Charlie Warrants are issued allowing the trains to enter the sections. When this is done the Section turns yellow

© ART AC01 has now entered the section from Alpha to Bravo. The colour has changed from yellow to red 2CA52 has received a Warrant but has not yet left Charlie 1 st Train enters section

© ART AC01 is still in the section from Alpha to Bravo 2CA52 is now in the section from Charlie to Bravo 2 nd Train enters section

© ART 2012 Train 2AC01 is at the end of the section and the controller needs to select a route at BRAVO The system shows the controller that Road 2 is available.

© ART 2012 The Controller selects Road 2 at BRAVO The Controller selects Road 2 and confirms that the train is Out- of-Section

© ART AC01 is now in Road 2 at BRAVO

© ART 2012 Train 2CA52 is at the end of the section and the controller now needs to select a route at BRAVO Note that Road 2 is no longer shown on the selection list as it is already occupied by 2AC01 The controller selects the Through Road at Bravo

© ART 2012 Trains 2AC01 and 2CA52 are now at BRAVO Both trains have given up their warrants. Neither have permission to move further through the network

© ART 2012 Send 2CA52 towards ALPHA The Controller issues a warrant for 2CA52 to move towards Alpha on the Main Line There is a choice of 4 warrants which can be issued to 2CA52

© ART 2012

Both trains have departed from BRAVO

© ART AC01 is approaching Charlie Before 2AC01 leaves the section, the controller routes the train into the Up Platform Pressing the TOOS button (Train-out-of-section) moves the train into the Up Platform

© ART AC01 has left the section and now is in Up Platform at Charlie The section between Bravo and Charlie can now be reoccupied

© ART CA52 is now approaching ALPHA Before 2CA52 leaves the section, the controller routes the train into the Parcels Bay Pressing the TOOS button (Train-out-of-section) moves the train into the Parcels Bay

© ART 2012 Both trains have reached the end of their journeys

© ART 2012

Down Main section between Golf and Foxtrot to be blocked Possession needs to be taken on a 4 Track Section Down Main & Down Goods from Golf to Foxtrot Up Main & Up Relief from Foxtrot to Golf

© ART GF34 is in the Down Platform at Golf Station 9GF34 is going to Foxtrot

© ART 2012 An Engineering Possession is authorised A Possession is authorised on the Down Main

© ART 2012 An Engineering Possession is authorised A Possession can be divided into 10 Sub- Warrants allowing multiple worksites within a single sections.

© ART 2012 An Engineering Possession is authorised

© ART 2012 Issue Movement Warrant to 9GF34 to move towards Foxtrot The only available Movement Warrant to Foxtrot is on the Down Goods. There is still an Engineering Possession on the Down Main.

© ART GF34 receives Movement Warrant to Foxtrot via Down Goods The Controller selects the Down Goods Warrant and sends it to the driver.

© ART 2012

9GF34 enter the section Pressing the TES (Train-entering-section) button confirms that 9GF34 is now between Golf & Foxtrot.

© ART GF34 is between Golf and Foxtrot The colour has changed from yellow to red as the train is now in section

© ART GF34 approaches Foxtrot and leaves the section Both Platforms are available at Foxtrot The Controller selects the Down Platform

© ART GF34 is routed to the Down Platform The Controller confirms that 9GF34 has arrived at Foxtrot by pressing the TOOS button.

© ART GF34 has arrived at Foxtrot The Engineers are still working between Golf and Foxtrot on the Down Main

© ART 2012

Giving up the Engineering Possession The Engineers still have Sub- Warrants for 3 worksites in the Possession

© ART 2012 Now all of the Sub-Warrants have been handed back All of the Engineering Work is completed

© ART 2012

The Engineers have completed their work

© ART 2012 All of the transactions are written to a Train Register log which can be audited The system is extendable to incorporate Additional dumb terminals for viewing network use from other offices and locations Shore to locomotive direct computer access GPS verification of locomotive position Verification of end-of-train position via GPS The system will work non-stop 7 * 24

© ART 2012 TWS

© ART TWS

© ART 2012 TWS

© ART TWS

© ART 2012 TWS

© ART TWS

© ART 2012 TWS

© ART TWS

© ART 2012 TWS

© ART TWS

© ART 2012 TWS

© ART TWS

© ART 2012 TWS

© ART TWS

© ART 2012 TWS