WP22 WASA 2 Site Description Report Trip WM11

Slides:



Advertisements
Similar presentations
for Storm Survival, Long Term Reliability and Safety
Advertisements

Stem and leaf diagrams and box plots Statistics. Draw a stem and leaf diagram using the set of data below
1 NAFE 2005 CS616 and Meteorological data T.Wells, C. Martinez, G. Hancock and J.D.Kalma Plan of talk: 1.Overview of the collected and missing data 2.Data/calibration.
A/C Generator Systems.
Installation. Indoor Unit Installation Typical Installation.
Solar Bike Install Jim Hickey. MDF board cut to profile of a Deuter handlebar bag, board with gal straps and machine screws fitted for concept proof.
Dishwasher Rework. Identify Unit Disconnect Power Turn off Breaker… … or unplug power cord.
FPR Lessons Learned Sterling Field Support Center December 1, 2009.
Electrical Notes.
Driver’s Education Vehicle Maintenance. What to Check before you enter the Vehicle 1.Check the following fluid levels at least once a month & before long.
Solar Charge Controller With Dump Load Circuit Built By Matt Smyrski.
Colorado Space Grant Consortium HOBO Computer Class #05 HOBO Computer Class #05.
Given Connections Solution
2-4. Solar Panels.
ISolar Portable Folding Solar Kit 45W. Packing Box Size : 40 x 26 x 10 cm (15.8 x 10.2 x 3.9 in) Weight : 3.5 Kg (7.72lb)
Charging System Service
VAT: Volt Ampere Tester
 Go to Control Panel of your System  Click on System and Security.
Project Goals And Objectives ____________________________________________________ Create a “smart”, customizable, all in one system Little to no learning.
All information contained herein is confidential and may not be disclosed to any third party without the written consent of Interlogix Europe & Africa.
Our concept was that we could effectively make a solar powered light that attaches to a hard hat and will provide a worker with adequate light when working.
Chop Saws Also known as miter saws and drop saws Used for straight and angle cuts in timber and metal Used in framing and finished carpentry.
Batteries The purpose of the battery is to act as a reservoir for storing electricity.
Miter Saws Also known as chop saws Used for straight and angle cuts in timber and metal Used in framing and finished carpentry.
Phase Presence and Sequence Tester (FAST-1) Boris Fradkin 2015 A.L.F. Enterprise.
Battery Fundamentals Chapter 30 Page 403.
Serial vs. Parallel Connections. Serial Connections Serial connections are positive-to-negative in a chain.
(c) P.Hsu 2007 SJSU ENGR 10 Electrical Power Sources Prof. Ping Hsu.
FPR Lessons Learned Sterling Field Support Center As of December, 2009.
Solar Energy Technology Science Summer Camp Session 9: Fri 9:00 AM - 12:00 N : Field trip to Energy Masters and Installing/Commissioning the System.
Alaska, My Thoughts. Alaska Improvements Wind Power to be added at Selawik and one other site, either Deadhorse or King Salmon LVD modified.
BRAZED PLATE HEAT EXCHANGERS. Solar Heating exchanger  Solar panel (M3) water 30-60c with glycol  4 BL20-25  4-12 BL20-22  BL50-20  BL50-30.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
Strip Module Working Group Meeting 16 th May 2012 Hybrids A Greenall.
You and Your Solar Panel
Issues with USB communication to pump box Sonya Collier Qi Zhang’s Group – UC Davis.
PAM Station Photo: HVAMS03 10-m Tower: Prop-Vane Anemometer Lightning Spike Solar Panel / battery Power System 2-m Temperature / Humidity in aspirated.
ELECTRICAL FIRES CAN BE PREVENTED! By PowerCheck.
Introduction to Sensors and Calibration Factors. Choosing a suitable recording range on a data logger Logger will have several range options: e.g. -10.
The 5 Phases Welcome Assessment Presentation Objection Closing.
Wisconsin Automatic Weather Station Servicing by BAS for Summer 2003/2004 Steve Colwell.
G2P Installation Readiness. Fast raster & Calorimeter.
Figure 3-9: Implementing the Load Diverter CAUTION Do NOT connect the wires to the Diversion Load Controller or the terminal block at this point. IF.
It all started simple…. One Alternator One Battery One Starter Motor.
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
STATIC DROPPED OBJECTS, COMMON INSPECTION FINDINGS.
CTIO Weather Station renewal
WP22 WASA 2 Continue with data collection and QA
Stem and leaf diagrams and box plots
CTIO Weather Station renewal
Module – Groundwater Level Measurement
Regular Maintenance Steps - LT Panel LT Panels Manufacturer – Guide by Accupanels.
Most Effective Methods to Tighten the Battery Terminal
Basic Electrical Circuits
PAM Station Photo: HVAMS03
सोलर पॅनेलचा उपयोग करुन रीचर्जेबल टॉर्च बनवणे.
RV Solar Panel Installation
FPR Lessons Learned Sterling Field Support Center
Approximate the answers by referring to the box plot.
WP23 WASA 2 Site description QA site visits at WM12 and WM14
Suchnetcom Solar Ltd Nigeria
Classic Linear Design Process
Piping Flow Maintenance
iSolar Lighting System - For areas lack of electricity
By Penelope Smith and Alan Vara
Basic Electrical Circuits
Welcome To Online Help 247 Learn to Set Up Arlo Camera With Solar Panel.
THROTTLE POSITION (TP) SENSORS
Presentation transcript:

WP22 WASA 2 Site Description Report Trip WM11 Replaced 60, anemometer, cable and junction box at WM11. Possible hail/ice damage to lower T-grad radiation shield Arranged with farmer to fit our own lock to gate Wind Atlas for South Africa (WASA)

WP22 WASA 2 Site Description Report Trip WM12 Checked connections of Tgrad sensors, as the max and min values showed regular spiking, possibly due to a loose wire connection. Very secure palisade fencing now erected around mast base. Clamped 20m WD sensor along boom to check boom directions WM14 Clamped 20m WD sensor along boom. Wind Atlas for South Africa (WASA)

Contingency Trip WM01 Replaced logger battery at WM01 Solar panel full of bird droppings (below left) and solution implemented (below right) Wind Atlas for South Africa (WASA)

Contingency Trip WM01 & WM01 Solar panel full of bird droppings at WM02 (below left) and solution implemented (below right) Wind Atlas for South Africa (WASA)

Next 6 months Continue with data collection and QA Finish Site Description Report Report on WASA1 maintenance by Webb Keep tabs on WM14 battery volts Replacement of Tgrad radiation shield at WM11 Wind Atlas for South Africa (WASA)