Week 25 Summary Coordinators: Mike Lamont and Barbara Holzer

Slides:



Advertisements
Similar presentations
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Advertisements

21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
LHC Status Tue Morning 22-Aug
Wednesday 3rd October - morning
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Saturday :12 Stable beams fill 3351 Initial luminosity
Friday 15th June 01:11 Injection.
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Summary of week 7 Hardware Commissioning:
Tuesday 11th September LHCb dipole presently fault off
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday fill with 1092 bunches (6 h stable beams)
LHC – Progress with Beam
Summary week 23 Luminosity production
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Summary week 31 Week 31 G. Arduini & O. Brüning
Summary week 41 (MD) Weekend of physics
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Fri 15th – Sun 16th June Friday Saturday Sunday Monday
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Mike Lamont, Jorg Wenninger
Thursday 10th May - morning
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Week 35 – Technical Stop and Restart
Summary week 29 VdM scans Luminosity production
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Wire almost entirely through beam before BLM triggers dump
Tuesday 22 November 2011.
LHC progress report Week
Friday Morning 7:30 injection for fill 2908
Sunday
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
LHC Morning Meeting - G. Arduini
Tuesday morning 08:30-09:00 Squeeze with probe.
Summary week 18 Intensity ramp up & production
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Saturday :42 stable beams fill 3541
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Friday morning 08:00 Stable beams with 840b.
2011年 5月 2011年 6月 2011年 7月 2011年 8月 Sunday Monday Tuesday Wednesday
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Coordination: Eva Barbara Holzer, Mike Lamont
Thursday 20th July - morning
Another Immortal Fill….
Thursday Morning/Afternoon
Wednesday 26 October 2011.
Wednesday morning / afternoon
Saturday 26 November 2011.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
HI2011 Commissioning Status
Tuesday
Presentation transcript:

Week 25 Summary Coordinators: Mike Lamont and Barbara Holzer MD Coordination: Ralph Assmann, Giulia Papotti, Frank Zimmermann

Program of Week 25 Monday 18.6. Luminosity production Scheduled Actual Monday 18.6. till 13:00 Luminosity production 13:00 – 18:00 Access followed by test of TETRA impact on beam 18:00 20:00 90 m beta* un-squeeze validation Tuesday 19.6. 6:00 12:30 Start MD Block #2 Monday 25.6. Start Technical Stop

Closed books for ICHEP on Monday 18 June 13:00 Atlas: 6.6/6.3 fb-1 delivered/recorded CMS: 6.8/6.3 fb-1 delivered/recorded LHCb: 0.65/0.62 fb-1 delivered/recorded Alice: a little over 1 pb-1

Faults, Accesses and Recovery Time Excellent availability: ~ 14% of time spent in fault, access or recovery (e.g. pre-cycle) Monday 5:00 hours – 2 separate accesses: LBDS Check/repair Ethernet connection on FEC cfc-ua63-mkdtspm Collimator cooling check TCT IR8 BI BBQ: UA43 – remote communication with a controls front-end BI Head-Tail monitor: Q7R4 - install attenuators ATLAS 2nd access: RF module M2B2 broken crowbar (diagnosis), UX45 Tuesday total of 9:15 hours No beam Tuesday morning 8:15 hours: 4:15 – 9:00 fault of 400 V distributor: S12+S23 triped, vacuum valves closed access for TI services and vacuum valve controls 11:35 finished the repair of crowbar RF module 2 beam 2 10:30 – 12:30 no beam from PS: 10 MHz cavity intervention Tuesday night 1 hour: BLM SEM not recognized by sanity check

Faults, Accesses and Recovery Time cont. Wednesday afternoon 1 hour PS septum Thursday 3:30 hours (1:30 + 0:30+1:30) access: AC Dipole repair Diamond BLMs: change dynamic range for UFO MD Install temperature probes for Head-Tail monitor RF L8B2 fast abort, and PS ventilation door opened in UL26 Friday 1 hour: access system, communication lost between LASS and TIM. SIS didn't get information on the door status and the powering interlock was sent to all sectors. Saturday 1:30 hour: RQTL11L2.b2 went faulty during re-cycling Sunday 2 hours Oracle DB (LSA, Inca, …): a node in the DB cluster partially crashed, and connections were not automatically transferred to the other nodes in the cluster. RF line 8B2