TGac January 2009 Closing Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0358r0 Submission March 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac March 2013 Closing Report Date: Authors:
Advertisements

Doc.: IEEE /1294r0 Submission September 2011 Rolf de Vegt, QualcommSlide 1 Spec Framework Text for.11ah Bandwidth Modes Date: Authors:
Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
Doc.: IEEE /0707r0 Submission May 2011 Minyoung Park, Intel Corp.Slide 1 Overview on TGah Specification Framework Development Date:
Doc.: IEEE /0217r1 Submission March 2009 Osama Aboul-Magd, Nortel NetworksSlide 1 March 2009 VHTL6 Meeting Agenda Date: Authors:
Doc.: IEEE /1445r1 Submission TGad November 2011 Closing Report November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors:
Doc.: IEEE /0413r0 Submission March 2010 Osama Aboul-Magd (Samsung)Slide 1 TGac March 2010 Closing Report Date: Authors:
Doc.: IEEE /0xxxr0 Submission May 2010 Osama Aboul-Magd (Samsung)Slide 1 TGac May 2010 Closing Report Date: Authors:
Doc.: IEEE /0393r1 Submission March 2008 Eldad Perahia (Intel)Slide 1 Orlando Liaison Report Date: Authors:
Doc.: IEEE /1200r0 Submission Sept 2012 Xiaoming Peng / I2RSlide 1 Date: Authors: IEEE aj Sept 2012 Closing Report.
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Doc.: IEEE /0464r2 Submission May 2009 Osama Aboul-MagdSlide 1 May 2009 VHTL6 Meeting Agenda Date: Authors:
A Proposed Timeline for IEEE ba TG
IEEE aj January 2016 Closing Report
TGax March 2017 Closing Report
Requirements Discussion
TGad Process Overview Date: Authors: January 2009
TGac Documents and Timeline
Towards an Improved Proposal Development Process for VHT
TGad September 2010 Closing Report
Towards an Improved Proposal Development Process for VHT
VHT SG September 2008 Closing Report
TGad July 2009 Closing Report
TGae Closing Report – January 2010
TGae Closing Report – March 2010
802.11ax Timeline Scenarios Date: Authors: May 2014
Task Group ac Process Overview
Task Group Process Overview
TGae Closing Report – May 2010
TGad September 2009 Closing Report
Candidate Statement- Osama Aboul-Magd
VHT SG September 2007 Closing Report
TGad November 2009 Closing Report
TGad January 2010 Closing Report
TGac Status and Timeline
May 2009 VHTL6 Meeting Agenda
TGn Closing Report November 2003
VHT SG July 2008 Closing Report
TGad March 2009 Closing Report
May 2009 VHTL6 Meeting Agenda
TGad May 2009 Closing Report
July 2009 VHTL6 (TGac) Meeting Agenda
July 2009 VHTL6 (TGac) Meeting Agenda
Task Group Process Overview
Tgae Closing Report – November 2009
IEEE Liaison Report for
VHT SG November 2008 Closing Report
Selection Procedure for TGai
TGad March 2011 Closing Report
TGac May2009 Closing Report
May 2009 VHTL6 Meeting Agenda
VHT SG January 2008 Closing Report
TGad May 2011 Closing Report
September 2009 VHTL6 (TGac) Meeting Agenda
VHT SG March 2008 Closing Report
May 2009 VHTL6 Meeting Agenda
Task Group AY September 2017 Closing Report
January 2009 VHTL6 Meeting Agenda
Spec Framework Decision Process Alternatives
TGae Closing Report – July 2011
TGae Closing Report – January 2011
TGad January 2009 Closing Report
Task Group AY May 2016 Closing Report
January 2009 VHTL6 Meeting Agenda
TGax September 2017 Closing Report
802.11ax Spec Development Process Proposal
IEEE aj March Closing Report
January 2009 VHTL6 Meeting Agenda
TGax November 2017 Closing Report
80 MHz Channelization Date: Authors: July 2010 Month Year
Presentation transcript:

TGac January 2009 Closing Report Month Year doc.: IEEE 802.11-yy/xxxxr0 Nov. 2008 TGac January 2009 Closing Report Date: 2009-01-22 Authors: Osama Aboul-Magd, Nortel Networks John Doe, Some Company

Month Year doc.: IEEE 802.11-yy/xxxxr0 Nov. 2008 Abstract This document is the closing report for the TGac for the January 2009 session Osama Aboul-Magd, Nortel Networks John Doe, Some Company

Submissions Nov. 2008 TGac Documents Technical 09/0035, “802.11ac Usage Models Starter Document”, Rolf de Vegt 09/0059, “802.11ac Selection Procedure”, Rolf de Vogt 09/0068, “IEEE TGac Usage Models- Preliminary States”, Phillipe Chambelin 09/0071, “Discussion on Functional Requirements”, Peter Loc 09/0086, “Task Group Process Overview”, Darwin Engwer 09/0088, “802.11ac Channel Models”, Qualcomm 09/0161, “802.11ac Usage Models Document”, Rolf de Vegt, Qualcomm 09/0179, “SDMA Channel Models”, Eldad Perahia Technical 09/0090, “Hi-Definition TV transmission over VHTL6 System”, Kunitoshi Nishijo, Baiko Sai, ShingoYoshizawa, Hiroshi Ochi, Kyushu Institute of Technology and Hokkaido University 09/0138, “OFDM-Related issues in VHTL6”, Marc Emmelmenn and James Gross, RWTH Aachen University Osama Aboul-Magd, Nortel Networks

Work Completed Functional Requirements Selection Procedure Nov. 2008 Work Completed Functional Requirements Submission 09/0071 presented a set of questions related to TGac functional requirement Selection Procedure Submission 09/0035r1 describes a proposed selection procedure. Usage Models Submission 09/0161 describes Usage Models specific to TGac. The document is accepted as the TGac Usage Models baseline document. Channel Models Two submissions on Channel Models (09/0088 and 09/0179) were presented. The two presentations agreed on the use of the 802.11n channel models for TGac and incorporate changes as needed. Specification Framework Submission 09/0086 provided an initial straw man to stimulate discussion. Osama Aboul-Magd, Nortel Networks

March 2009 Goals Functional Requirements Selection Procedure Nov. 2008 March 2009 Goals Functional Requirements Continue the functional Requirement discussion with the aim to have a first draft available by March. Selection Procedure Continue to refine the selection procedure described in 09/0035r1. Usage Models Continue the discussion on usage models based on submission 09/0161. Channel Models Expect a first-cut .TGac channel model addendum by March. The addendum and modifications can be used as supplement to TGn channel models for simulation. Specification Framework Initial view on the outline of the document Technical Submissions Osama Aboul-Magd, Nortel Networks

Conference Call Times Bi-Weekly, alternate with TGad Feb. 12 Feb 26 Nov. 2008 Conference Call Times Bi-Weekly, alternate with TGad Feb. 12 10:00 – 12:00 ET Feb 26 20:00 – 22:00 Possible Topics Channel Models Functional Requirements Selection Procedure Usage Model Osama Aboul-Magd, Nortel Networks