Measuring Carpentry and Miscellaneous Items

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Common Components of a Traditional Wood Framed Building
Chapter 5 Measuring Carpentry Work. Board Measure Most lumber is dressed; this means that surfaces are sanded, which reduces the size of cross section.
Floor-Plan Dimensions and Notes
Carpentry Skilled Trades Ceiling and Roof Framing The most commonly used types of residential roof and ceiling construction are: Joist and Rafter.
CAREER OPPORTUNITIES IN THE HOUSING INDUSTRY Housing I
Lumber Grading.
Measuring Concrete Work
Chapter 7 Estimating Plumbing, HVAC, and Electrical Work.
Chapter 12 Pricing Masonry Carpentry, and Finishes Work.
Chapter 9 Pricing the Work. Introduction Non-computer estimates are priced in two stages: –Stage one: Prepare a recap by sorting and listing all takeoff.
Skilled Trades 1201 Floor Framing
14 Foundation Plans Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Identify the primary features.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
Wood Frame Construction Common Components of a Traditional Wood Framed Building Gateway – Unit 7 – Green Architecture © 2012 Project Lead The Way, Inc.Green.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Measuring Masonry Work
CON 4003 Construction Estimating Prof R. V. Locurcio.
Chapter 11 Pricing Concrete Work. Objectives Upon completion of this chapter, you will be able to: –Describe the job factors and the labor and management.
Chapter 4 Measuring Concrete Work
Constructing Homes and Other Buildings
Drafting and Dimensioning the Architectural Floor Plan
1 WALL FRAMING. 2 Interior & exterior walls l basic wall components –bottom plate –studs –top plates –headers –bracing –sheathing –finishing materials.
ASSIGNMENT Begin on page 197 “The Foundation”.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Floor Plan Dimensions and Notes
Construction Carpenter Vocabulary Created by The University of North Texas in partnership with the Texas Education Agency.
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
Chapter 35 Section Layout.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Gill Timbers Canadian lumber for interiors-exteriors and all purpose furniture.
Wall and Ceiling Construction
Common Components of a Traditional Wood Framed Building
Materials Lists Preparing to Build. Materials List  Complete list of all supplies needed to complete the project  Must be detailed  Dimensions of materials.
Chapter 26 Millwork and Cabinet Technology, Cabinet Elevations, and Layout.
Wood Construction CTC-375.
CON 4003 Construction Estimating Prof R. V. Locurcio.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Wall and Ceiling Construction
Chapter 28 Structural Components of Framed Construction.
Chapter 32 Drawing Framing Plans.
 Overview of Interior Finishes  Types  Examples.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Chapter 21 Building Sections. Chapter 21 Building Sections.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 8 Layout Tools and Procedures.
APPLICATIONS OF TECHNOLOGY
Building Construction for the Fire Service
Common Components of a Traditional Wood Framed Building
Warm-up 9/20/16 What is the underlayment called below the shingles?
Common Components of a Traditional Wood Framed Building
OBJ: SWBAT create a CAD Rendering of a Utility shed.
APPLICATIONS OF TECHNOLOGY
Construction Framing Mr. Brock.
Wood Frame Systems Civil Engineering and Architecture®
Chapter 1 Introduction.
Construction Documents
Warm-up 9/19/16 What template are we using?
CHAPTER 5 IRC 2009 FLOORS.
Objective 6.02 part 1: Recognize components of construction
Competency: Draw wall sections and details.
Wood Structures Topic 8 Quality Workmanship
Common Components of a Traditional Wood Framed Building
House Construction Budget Plan
Common Components of a Traditional Wood Framed Building
Week 5 Drafting and Dimensioning the Architectural Floor Plan.
Common Components of a Traditional Wood Framed Building
Chapter 22 Building Sections. Chapter 22 Building Sections.
Chapter 13 Concrete Form Design.
Common Components of a Traditional Wood Framed Building
Presentation transcript:

Measuring Carpentry and Miscellaneous Items Chapter 7 Measuring Carpentry and Miscellaneous Items

Objectives Upon completion of this chapter, you will be able to: Describe a system that will allow an estimator to accurately measure detailed carpentry work on a large project Calculate quantities of lumber and sheet materials

Objectives (cont’d.) Describe how to measure carpentry work in a takeoff Describe how carpentry work is classified in a takeoff Measure rough carpentry, finish carpentry, and miscellaneous items from drawings and specifications Complete a manual takeoff of carpentry work and miscellaneous items

Measuring Rough Carpentry Detailed carpentry work quantity takeoff Requires comprehensive carpentry knowledge when estimating Standard practices and code requirements Framing methods and design requirements Estimating commercial and institutional buildings Different skills required

Board Measure Unit of measurement of lumber Figure 7.1 Sample Board Measure Calculations (Delmar/Cengage Learning)

Metric Units Metric system: Lumber will be in millimeters Sheathing does not change Described in mm rather than inches Takeoff process Items of lumber: measured in linear meters

Measuring Notes—Rough Carpentry Generally: Lumber Measured in board measure or linear meters Measure lumber separately Dimensions, dressing, grade, and species Describe special treatment required Kiln dried, pressure treated, etc.

Measuring Notes—Rough Carpentry (cont’d.) Wall boards Measured in square feet or square meters Do not deduct for openings Less than 40 square feet Classify wall boards Measure separately Framing work Lumber is classified and measured separately

Measuring Notes—Rough Carpentry (cont’d.) Other considerations: Trusses, truss joists, and truss rafters Manufactured beams, joists, and rafters Sheathing Copings, cant strips, fascias Soffits Sidings

Measuring Notes—Rough Carpentry (cont’d.) Vapor barriers and air barriers Underlay and subfloors Blocking and furring Rough hardware

Measuring Finish Carpentry and Millwork Finish carpentry on commercial project Materials Supplied by a millwork subcontractor Installed by general contractor Architectural woodwork Supplied by millwork contractor as finish carpentry Supplied and installed by custom subcontractor

Measuring Finish Carpentry and Millwork (cont’d.) Estimators should be familiar with: Trade scope definitions of finish carpentry Architectural woodwork in project location Evaluate supplied items Items outside scope of subtrades All are priced for installation costs and supply

Measuring Notes—Finish Carpentry Generally: Classify and measure items separately Rough carpentry: grounds, rough bucks, etc. Include allowance for rough hardware Metalwork: measured under miscellaneous metals Glazing: include in glazing section Unless integral part of prefabricated cabinet work

Measuring Notes—Finish Carpentry (cont’d.) Other considerations: Trim Shelving Stairs Cabinets, counters, and cupboards Paneling

Doors and Frames Usually obtained from subcontractors Quote prices and deliver goods General contractors Estimate cost of handling and installing Different sections of specifications Deal with metal and wood doors, frames, assemblies, and special doors

Windows General contractors Small jobs Obtains prices from subtrades No work for them to measure Small jobs May not be worthwhile hiring separate specialists Components may be obtained directly from suppliers

Miscellaneous Metals Miscellaneous metals trade Prices received from specialized subcontractors Supply and installation “Supply only” General contractor Ability to prepare a realistic estimate Wide scope

Specialties Specialty trades Wide-ranging trade section Subcontractors will offer different price quotes Example: bathroom accessories

Finish Hardware Supply cost Estimating costs Cash allowance is often specified on larger projects Otherwise obtained from a subcontractor Estimating costs Calls for quantity takeoff of all finish hardware requirements

Measuring Exterior and Interior Finishes General contractor’s estimator Does not usually measure finishing work for an estimate Almost invariably subcontracted these days Performed on some occasions

Examples Carpentry and miscellaneous work takeoff—house example Takeoff notes shown as Figure 7.2a Rough Carpentry—Floor System Rough Carpentry—Wall System Rough Carpentry—Roof System Finish Carpentry

Examples (cont’d.) Exterior and interior finishes takeoff—house example Takeoff shown as Figures 7.3 and 7.4 Exterior finishes Interior finishes

Summary Thorough knowledge of carpentry construction Required to prepare a detailed estimate Estimator must apply a systematic approach Carpentry requirements of commercial and institutional projects Usually well detailed