Project Scheduling: Lagging, Crashing and Activity Networks Chapter 10 © 2007 Pearson Education.

Slides:



Advertisements
Similar presentations
Precedence Diagramming
Advertisements

Lecture 4 – PERT Diagrams & CPM
WBS: Lowest level OBS: Lowest level
Project Scheduling: Lagging, Crashing and Activity Networks Chapter 10 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall10-1.
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
IE 2030 Lecture 5: Project Management Drawing Gantt Charts Time on horizontal axis, Activities on vertical axis. 1 bar per activity Length of bar = required.
Chapter 7 Project Management
Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
CP Chapter 4 Schedule Planning.
CIS 480 Systems Analysis and Design
Chapter 6: Developing a Project Plan
Project Management 6e..
Project Management from Simple to Complex
Chapter 6 Time Planning & Networks
Developing the Project Plan
9-1 ELC 347 project management Day 19. Agenda Integrative Project –IP part 4 not graded yet –Part 5 Due Nov 22 (page 318) –Any of the first five sections.
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
Project Management Project Management
Developing a Project Plan
Project Scheduling: Lagging, Crashing, and Activity Networks
Project Scheduling: Lagging, Crashing and Activity Networks
Day 19 ELC 347/BUS 348/PSA 347.
Managing Projects Chapter 14.
Introduction to Management Science
ELC 347 project management Week 11. Agenda Integrative Project –3rd part Graded –4 th part due next week –Outline of deliverables (posted in WebCT)Outline.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
9-1 Project Scheduling: Networks, Duration Estimation, and Critical Path Chapter 9 © 2007 Pearson Education.
Project Scheduling: Networks, Duration estimation, and Critical Path.
9-1 Project Scheduling: Networks, Duration Estimation, and Critical Path Chapter 9 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Project Scheduling: Networks, Duration Estimation, and Critical Path
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Project Management Dr. Everette S. Gardner, Jr.. Project Management2 PERT / CPM advantages 1. Disciplined planning 2. Realistic objectives 3. Unambiguous.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
MANAGING PROJECT RESOURCES
Project Management: A Managerial Approach
Advanced Project Management Project Time Management Ghazala Amin.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
Lags in Precedence Relationships
ENGM 631 Optimization Ch. 10: PERT/CPM. Great Pyriamid of Cheops (2,500 B.C.) 42,300,000 Stone Blocks 440 Stories 4Accuracy of 0.04 inch 413 acres level.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Project Management MGT 30725
Project Management: PERT/CPM
Chapter 5: Project Time Management Doddy Prayogo, Ph.D.
Project Planning & Scheduling
Project Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
P.I.I.M.T American University of Leadership
deterministic Fixed and known in advance, representing a
Project Scheduling Lecture # 1.
Project Planning & Scheduling
Project Management for Business
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
Project Scheduling Chapter 14.
Chapter 6: Project Time Management
Projects: Critical Paths
PROJECT MANAGEMENT WITH CPM/PERT.
Project Planning and Budgeting
Project Scheduling: networks, duration estimation, and critical path
Project Scheduling: Lagging, Crashing and Activity Networks
ELC 347 project management
Project Time Management
Project Time Management
AOA A style of project network diagram in which arrows
Importance of Project Schedules
Project Time Management
Presentation transcript:

Project Scheduling: Lagging, Crashing and Activity Networks Chapter 10 © 2007 Pearson Education

Lags in Precedence Relationships The logical relationship between the start and finish of one activity and the start and finish of another activity. Four logical relationships between tasks 1.Finish to Start 2.Finish to Finish 3.Start to Start 4.Start to Finish

Finish to Start Lag Most common type of sequencing Shown on the line joining the modes –Added during forward pass –Subtracted during backward pass 0 A 6 Spec Design 6 6 B 11 Design Check 5 15 C 22 Blueprinting 7 Lag 4 This lag is not the same as activity slack

Finish to Finish Lag Two activities share a similar completion point –The mechanical inspection cannot happen until wiring, plumbing, and HVAC installation are complete 10 A 16 Plumbing 6 16 B 21 HVAC 5 21 C 22 Inspection 1 15 D 21 Wiring 6 Lag 3

Start to Start Lag 31 A 33 Plumbing 6 33 B 36 HVAC 5 36 C 37 Inspection 1 30 D 36 Wiring 6 Lag 3 Logic must be maintained by both forward and backward pass

Start to Finish Lag Least common type of lag relationship Successors finish dependent on predecessors start 22 A 28 Plumbing 6 28 B 33 HVAC 5 33 C 34 Inspection 1 30 D 36 Wiring 6 Lag 3

Gantt Charts Establish a time-phased network Can be used as a tracking tool Benefits of Gantt charts 1.Easy to create and comprehend 2.Identify the schedule baseline network 3.Allow for updating and control 4.Identify resource needs

Create a Gantt chart based on the activities listed in the table. TaskTimePredTaskTimePred Z8--U3W Y5ZT6V X8ZS7U,T W4Y,XR9S V5W

Gantt Chart With Resources in MS Project

Crashing Projects Accelerating a project by committing more resources than initially planned Principal methods for crashing Improving existing resources productivity Changing work methods Increasing the quantity of resources

Managerial Considerations Determine activity fixed and variable costs The crash point is the fully expedited activity Optimize time-cost tradeoffs Shorten activities on the critical path Cease crashing when –the target completion time is reached –the crash cost exceeds the penalty cost

What is the lowest cost to complete this project in 53 weeks? Times are in weeks and costs in dollars. ActivityPredNormal Time Min Time Normal Cost Crash Cost A BA CA DB, C ED FD GE, F HG

Activity on Arrow Networks Activities represented by arrows Widely used in construction Event nodes easy to flag Forward and backward pass logic similar to AON Two activities may not begin and end at common nodes Dummy activities may be required

1.Use AOA to sketch the network that represents the project as described in the table. 2.Calculate early and late start and finish times for all activities. ActivityTimePredActivityTimePred A4--F4D B2AG15D C10AH7E,F,G D3B,CK11G E15B

Controversies in the Use of Networks Networks can be too complex Poor network construction creates problems Networks may be used inappropriately When employing subcontractors –The master network must be available to them –All sub-networks must use common methods Positive bias exists in PERT networks