Unit 9 Finishes Teaching Objectives 1. Have basic idea of finishes 2. Understanding something about wall finishes, floor finishes and ceiling finishes.

Slides:



Advertisements
Similar presentations
0 - 0.
Advertisements

Addition Facts
Sectional Assembly and Installation
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
FLOOR FINISHES Screeds Terrazzo (in-situ type) Ceramic Tiling
Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual Module 4 LaGyp.
NGfL CYMRU GCaD FLOOR COVERINGS.
-Master Bedroom w/ T & B - 2 Bedrooms - 1 Maids Quarter - 2 T & B - Living Room - Dining Room - Porch - Terrace - Carport -Standard Lot Area – 156 sqm.
Interior Wall and Ceiling Finish
Objectives Property of water (maths knowledge) Awareness of the uses of water (knowledge of the world, language development) Vocabulary: light, heavy,
Location: No 4 sharafadeen shoyege Magodo Estate Lagos Nigeria
Interior Wall and Ceiling Finish
Concrete Technology Finishing Concrete Joints in Concrete Lecture 20
Finishes many options Walls wood shakes, shingles, board & batten (vertical), plank lap (horizontal), T1-11 ply, vinyl, fiber cement, aluminum, stucco.&
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
Concrete Fooring & Roofing System
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Timber Framed Structures
Materials used in the external walls. Brick Bricks are probably the oldest manufactured material we have today. Although the method of production has.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
Glenn Murcutt Anna James Construction & Structures 2 SRT251.
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Building Methods Types of Structure.
Fire Behaviour Elements of Structure and Fire Development.
The development of floors After the foundations have been completed and the external walls constructed the construction of the floors commences. There.
Form screeds and granolithic finishes. Learning outcomes The purpose of damp proof membranes The recommended area of separate construction flooring that.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Bricking the Mason 2x4 Evaporator
Concrete
KOECH KIPLANGAT JOSEPH ADM NO 2012/BC/25432 CLASS 2012BCBC1B.
Carl the construction worker has a problem. Carl needs to build a house for a family moving into the neighborhood. Carl’s boss gave him lots of tools.
Standard Grade Graphic Communications
New Mexico FFA Agricultural Mechanics Career Development Event Concrete and Masonry.
Building Foundations Foundation Walls.
CONSTRUCTING A FIVE CABIN LATRINE
Introduction to Construction Industry
Prefabricated Timber Frame Construction
Unit 26. Sizes 7-5/8” high 15-5/8” long Common depths – 8”, 10”,12” 3/8” mortar joints Walls usually stand 7’-4”
Emergency Trade Repairs By Jake Beutle. What is an Emergency Trade Repair?  An emergency trade repair is those simple/ not so simple problems in your.
B UILDING R ESEARCH I NSTITUTE 1 Barriers for Deconstruction and Recycling of the Currently Built Single Detached Houses S. Nakajima Building Research.
Intro to Concrete 18.0 & 19.0 Class notes.
Chapter 14 Continued.
Btec Construction Unit 5 Methods of construction for domestic buildings.
Dry lining by direct bond – overview
Wall and Ceiling Construction
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Finishing the Building
SHREE J.M.SABVA INSTITUTE OF ENGINEERING &TECHNOLOGY, BOTAD 1.BELADIYA VISHAL R. 2.PARMAR PRAKASH K. 3.DESAI PARAS V. 4.PARMAR VISHAL D. 5.GOHEL KAMLESH.
Drywall Theory. Dry Wall Saw Dry wall T-Saw Dry Wall Lift.
Choose a category. You will be given the answer. You must give the correct question. Click to begin.
How to Build a Divider Wall By Charysse Roberson.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Learning Outcome Lesson Objective
Learning Outcome Lesson Objective
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Prefabricated Timber Frame Construction
Building Planning and Drawing
DAMP-PROOFING AND WATER-PROOFING COURSE
Building Construction I Sofia Sebastian 1
INTD 503- Materials Topic: Partition Walls
Sedimentary rocks... Choose the correct answer
Building Construction I Sofia Sebastian 1
Building Construction I Sofia Sebastian 1
Floors You need to understand how floors are detailed.
FINISHES (FLOOR, WALL & CEILING)
Presentation transcript:

Unit 9 Finishes Teaching Objectives 1. Have basic idea of finishes 2. Understanding something about wall finishes, floor finishes and ceiling finishes. 3. Communication on site 1) pointing out mistakes 2) Excuses and apologies 3) putting things right 4. Reference section: materials and components, etc.

The Arrangement of Building Services

9.1 Wall Finishes Mistakes in solid concrete are hard to put right. When concrete work is not done correctly, a great deal of time and effort may be needed to remove the concrete and cast it again. The architect has to decide whether or not the mistake is serious enough to make this necessary. 1. balcony wall: / balcony outlet: balcony rail: 2. bush-hammering: tooling concrete with a loothed hammer head bush-hammer, ( )

9.1 Wall Finishes bush-hammer finish bush-faced bush-hammered concrete 3. realize: understand 4. match: be the same 5. keep an eye on: watch closely 6. fair-faced: carefully finished block, brick, or concrete wall 7. board-marked concrete: ( ) board-market

Wall Finishes

9.2 Floor Finishes You do it that way. I do it this way. There are more ways than one of doing some jobs and each tradesman chooses to use the method which he has found to be the quickest and the best. 1. tradesman: skilled worker 2. semi-dry method: way of laying clay floor tiles ( ) semi-arch semibasement semi-detached house ( ),

9.2 Floor Finishes 3. separating layer: sheet of plastic used in laying clay floor tiles, separating separating floor ( ) 4. polythene sheeting: 5. screed: smooth, flat finish to a concrete floor, usually made of sand and cement screed finish:, screed rail: ( ) screeding:,,

9.2 Floor Finishes 6. cracking: breaking along a line, cracking load, 7. differential movement: movement of different materials at different rates, caused by heat or moisture differential settlement, 8. level: make flat 9. mix ; mix design, mix control

9.2 Floor Finishes 10. get it laid: have semi-dry mix done 11. grout: type of cement used to fill the joints in floor tiling (, ) grouted frame grouted concrete grout(ed) joint grouter 12. bed: bedding floor tiles ( ) bed:, ;, bed coat ; bed course

9.2 Floor Finishes 13. guvnor (governor): boss, chief 14. stick to: continue using

Floor Finishes Hardwood strip flooring Secret nailing Penny gap

Ceiling Finishes Suspended ceiling construction

Ceiling Finishes

Coffered ceilingBreaking joint

9.3 Ceiling Finishes Accuracy is the finishing tradesmans chief skill. Most work on a building site does not require perfect accuracy. When an error is made, the decision to rectify it often depends upon whether the mistake will be noticed. 1. rectify: put right 2. depend upon: it is changed or affected by the other thing 3. notice: see, catch sight of 4. grid:,, ceiling grid: framework to support ceiling panels 5. out: not accurate

9.3 Ceiling Finishes 6. bit: part, area 7. get around to: find time to We must get around to cleaning those windows. 8. spirit level: 9. step ladder: ladder which stands on its own (P.172) 10. Ill give you that: I agree 11. depend: vary according to circumstances It depends. That depends. Just depends.

9.3 Ceiling Finishes 12. suspension hanger: metal part which fixes a suspended ceiling to the roof structure ( ) 13. hold-down clip: clip to hold a ceiling panel in place ( ) ; hold-down bolt:, 14. get at: reach, have access to 15. sagging: sinking down in the middle 16. show up: be easily seen 17. get on with: make a start on

Internal elevation of a bathroom basin bidet Water closet Flushing tank