Using Graphic Indicators to Summarize Project Status Quick view of both tasks and projects Dave Hulse:

Slides:



Advertisements
Similar presentations
© Copyright, 2009, S. Leigh Geiger & Associates, Inc. Using MsProject for Earned Value Calculations Advanced MsProject Course Dr. Leigh Geiger.
Advertisements

©2012 Construction Science, LLC 1 Primavera P6 Settings Presented by Karen Reynolds, Partner Construction Science, LLC.
PERTEMUAN 3 PPSI Microsoft Project Presentation. What is a Gantt Chart? A Gantt Chart is a visual tool to help Plan, Manage, and Track a project or projects.
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Microsoft Project.
Presented by: Kreg McCall. Baseline Management & Control Define Baseline Baseline Types How to Generate a Baseline Baseline Setup for Success Baseline.
© The McGraw-Hill Companies, Software Project Management 4th Edition Monitoring and control Chapter 9.
Project Control Techniques
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Systems Analysis and Design 8th Edition
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Microsoft Project Presentation By Corey Johnson 10/11/00.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Microsoft Office Project 2007: Managing Projects.
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
OPSM 639, C. Akkan SAVE your existing MS Project File at the end of PART3 as _PART4 _PART4 WITH BASELINE. Make sure you keep the original file without.
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
Tracking progress on tasks and assignments TUTORIAL # 3.
Office of Project Management Metrics Report Presentation
Refining Your Project Plan Lesson 4. Skills Matrix SkillsMatrix Skill Apply a task calendar to an individual task Change task typesChange scheduling formula.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
07 – Project Management Software
1 DESKTOP TIPS Presented by: Doug Bonebrake Senior Project Manager Global Project Office FrontRange Solutions Inc.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Understanding Earned Value Analysis
Reporting to Management Using Microsoft Project and EPM Derek Loar, Pcubed.
11-1 ELC 347 project management Snow Day. Committed to Shaping the Next Generation of IT Experts. Essentials Microsoft Project 2003 Dawn Parrish Wood.
Ahmad Al-Ghoul. Learning Objectives Explain how to begin working in your project by Gathering Information, Determining detail tasks, Determining detail.
The Project Plan IT Project Management COSC
Advanced Project Plan Formatting Lesson 14. Skills Matrix SkillsMatrix Skill Customize the calendar view Format bar styles for tasks in the Calendar view.
Project Management Software Application PRM 705 Lecture 32 1.
Microsoft Project 2010 ® Tutorial 6: Sharing Project Information with Other People & Applications.
Fourth R Inc. 1 WELCOME TO MICROSOFT OFFICE PROJECT 2003 INTRODUCTORY COURSE.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
Produced by: KPI’s for Measuring & Controlling STO Projects E.J. (Ted) Lister Lister Management Inc.
This information is confidential and was prepared by Bain & Company solely for the use of our client; it is not to be relied on by any 3rd party without.
MS Project Tips & Tricks Presenter: Natalie Wieland PMP, MCSD, MCDBA, OCPDBA, MCT.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Unpublished Work © 2003 Treb Gatte Program Management Using MS Project Server Treb Gatte Wachovia Corporation Permission granted to MPUG-Charlotte for.
© 2008 Sterling Commerce. Confidential and Proprietary. How to Get Along with Project Using Microsoft Project so that it actually works for you, not against.
6. TRACKING PROGRESS. OBJECTIVES Save current schedule values in a plan as a baseline. Record progress on tasks through a specific date. Record tasks’
Microsoft Office Project 2007 Advanced Tips & Tricks Keith Wilson, Executive/Senior Consultant Project Management Practice Inc.
Chapter 3 Managing the Information Systems Project
Assignment-Level Tracking Field Calculations in Microsoft® Office Project Kelly Jones PMO Manager, Information Systems Sharp Healthcare.
Microsoft Project 2003 Level 1 Deanna Reynolds Instructor.
1 Microsoft Project 2003 Introduction. 2 Overview Microsoft Project is a specialized database that stores and presents thousands of pieces of data. Examples.
Project Plan Tracking – Fundamentals Lesson 8. Skills Matrix SkillsMatrix Skill Establish a project baseline Track a project as scheduled.
Project Time Management
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
Department of CS & Eng. MSSE Program, © Fissure 1 SOFTWARE PROJECT MANAGEMENT COURSE Executing, Monitoring and Controlling Session #7.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Microsoft Project Mastering Microsoft Project 2010 Instructor: Tom Vorves Dial In:1 (800)
Measuring Project Performance MS Project. Key Performance Indicators (KPIs) Quantifiable measurements – Reflect and measure achievements on critical success.
Using MS-Project INFS MS-Project: 3 Major Parts 1. Project Planning 2. Project Execution & Tracking 3. Project Reporting.
Fine-Tuning Tasks Lesson 5 © 2014, John Wiley & Sons, Inc.Microsoft Official Academic Course, Microsoft Project Microsoft Project 2013.
InLoox 9 Web App Product Presentation
Business System Development
Establishing and Managing a Schedule Baseline
InLoox 9 Web App Product Presentation
Quantitative Project Risk Analysis
Monitoring and Reporting Project Progress
In this tutorial you will:
SSI Toolbox Status Workbook Overview
CAD DESK PRIMAVERA PRESENTATION.
Presentation transcript:

Using Graphic Indicators to Summarize Project Status Quick view of both tasks and projects Dave Hulse:

Agenda 2. Why Use Indicators? 3. Identify What Should be Measured 4. Task Indicators 5. Enterprise Indicators 1. Overview 6. Complex Indicators 7. Tips, Tricks and Best Practices

Indicators Visual indicators help managers focus on what is important Available in both Project Pro and Project Web Access Support improved project management metrics –Project Management Maturity (PMM) is a measure of the extent to which a specific project management process is defined, repeatable, managed, measurable, and effective.

Common Measures of Variance Work variance –Planned vs. actual hours worked Cost variance –Over/under budget –Earned value Schedule variance –Variance from baseline –Slack time to deadline

Task vs. Project Variance Task variance –Track every task in the project schedule –Available in both Standard and Enterprise editions of Microsoft Project Project variance –Useful for digital dashboards that summarize overall performance of multiple projects –Project indicators only available in EPM –May require more complex logic (Example: final deadline may not be the best milestone)

Work and Cost Variance Easy indicators to create Typically compare work to baseline work or cost to baseline cost Cost is calculated as resource hours X resource cost –Some organizations dont expose resource cost in Project

Useful Functions IIf( expression, truepart, falsepart ) –IIf( [Work]>[Baseline Work], Over, OK) Switch( expression1, value1, expression2, value2,... ) –Switch( [Work]/[Baseline Work]>1.1, 3, [Work]/[Baseline Work]>1, 2, True, 1) ProjDateDiff( date1, date2, calendar ) –ProjDateDiff( [Baseline Finish], [Finish]) –Usually divide by 480 (60 min X 8 hours)

Baseline Variance A baseline saves the following –Cost –Finish –Work You can easily create variance indicators for any of these –Duration –Start

Schedule Variance Typically measures slippage based on the end date of the task or milestone Work best for flexible project plans where the end date is affected by update of actual work –Fixed duration tasks do not float –Entering progress by percent complete does not push out end dates

Schedule Variance Finish date variance from baseline –Easy indicator to design –Easy for project managers to establish Finish date slack from deadline –Easy to design and very flexible –PM must set deadlines on individual tasks Actual progress vs. expected progress –Requires more complex logic –Can be used for fixed duration tasks

Track Pct. Complete LogicValueColor Task not due to start 0White Task is complete 1Green Task underway and on schedule 1Green Task is behind schedule 2Red

Project & Enterprise Indicators Within a single project, rollup capability can be used to show overall project status –Supported in Standard edition –Rollups use same logic as tasks Enterprise edition allows true project level indicators –Indicator logic can be different and more complex than task logic

Complex Indicators Create indicator logic to distinguish certain types of tasks –Critical path –Custom flags –Key milestones Roll up values based on task type or flag fields

Best Practices Dont create too many different indicators Indicators that roll up should be based on algorithms that return simple numeric values Higher numbers indicate worse conditions Be sure to trap all conditions (including no value Create and save a project plan that tests all logic

Best Practices (cont.) Document your logic Keep your plans currentmove uncompleted time to the future Global template changes dont take effect until you close Project and re-open –Hint: Test logic in local fields, then import into Enterprise fields Divide duration by minutes times hours per day Hint: Service Pack 1 may impact roll-ups

Advanced Customization SQL Reporting Services or custom code can be used to generate alerts –Slipping critical tasks Project metrics can be linked to other data –ERP resource cost to EPM resource hours

Code Samples Work variance from baseline –IIf([Baseline Work]=0,0,Switch([Work]/[Baseline Work]>1.1,3,[Work]/[Baseline Work]>1,2,True,1)) Schedule slip from deadline –IIf(IsDate(1+[Deadline])=0,0,Switch(ProjDate Diff([Deadline],[Finish])/480>5,3,ProjDateDiff([ Deadline],[Finish])/480>0,2,True,1))

Code Samples 2 Fixed duration task check –Switch([Current Date]<[Start],0,[% Complete]=100,1,ProjDateDiff([Start], [Current Date])/ProjDateDiff( [Start], [Finish])<([% Complete]/100),1,True,2)