Tribal Data WG Fire and Smoke WG Oil and Gas WG

Slides:



Advertisements
Similar presentations
Attribution of Haze Workgroup & Technical Support System Report Fire Emissions Joint Forum Meeting July
Advertisements

Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
Technical Support System Review / / RPO Monitoring/Data Analysis Workgroup Conference.
Technical Support System Review Board Meeting March 8, 2007.
Three State Data Warehouse Tom Moore Shawn McClure, Rodger Ames, Dustin Schmidt
Fire Emissions Joint Forum –Section 308 Strategies for Fire Coordinating efforts of states changing or developing smoke management strategies for regional.
Oil and Gas Workgroup Summary October 21-23, 2009 Denver.
2004 Workplan WRAP Regional Modeling Center Prepared by: Gail Tonnesen, University of California Riverside Ralph Morris, ENVIRON Corporation Zac Adelman,
NSDI Strategic Plan Update FGDC Coordination Group Meeting September 10, 2013.
November 7, 2013 WRAP Membership Meeting Denver, CO Tom Moore WRAP Air Quality Program Manager WESTAR Council.
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
Next Steps in Regional Haze Planning in the Western U.S. Prepared by the WESTAR Planning Committee for the Fall Business Meeting, Tempe, AZ October 31,
WRAP Update WESTAR Meeting San Francisco April 25, 2011.
WRAP States Four Factor Reasonable Progress Lee Gribovicz WRAP IWG Meeting March 10, 2009.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Santa Fe December 2006 Update on Regional Haze 308 SIP Template.
Geospatial LoB: Lifecycle WG Update November 3, 2009.
Technical Projects Update WRAP Board Meeting Salt Lake City, UT November 10, 2004.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Portland August 2006 Suggested Changes to IWG Section 308 SIP Template.
Overview of WRAP FEJF Work Products WRAP Workshop on Fire, Carbon, and Dust May 23-24, 2006 Sacramento, CA Darla Potter (WDEQ) & Mark Fitch (USFS)
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
Status of WRAP Work Plan Tom Moore, WRAP September 19, 2002 WESTAR Fall Technical Conference.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Technical Support System Review Board Meeting March 8, 2007.
Work Items for §309 SIPs WESTAR Fall Technical Conference September 19, 2002 Tom Moore & Brian Finneran.
NSDI Strategic Plan Update FGDC Coordination Group Meeting November 19, 2013.
CCP: Monitoring and Evaluation
WRAP Update Patrick Cummins WESTAR Meeting September 23, 2005
Implementation Strategy July 2002
WRAP TSC/Co-Chairs Call Workplan Progress Update August 1, 2018
WRAP Workplan WESTAR (State Caucus) Recommendations and Action Items
JRC’s Follow-up work to improve GES assessment
WRAP TSC/Co-Chairs Call Workplan Progress Update August 29, 2018
Monthly Update on WRAP Workplan
WRAP TSC/Co-Chairs Call Workplan Progress Update September 26, 2018
Reliability Standards Development Plan
WRAP TSC/Co-Chairs Call Workplan Progress Update October 31st, 2018
Upcoming projects* to support Regional Haze SIP/TIP planning
WRAP TSC/Co-Chairs Call Workplan Progress Update December 19, 2018
Adjusting the Regional Haze Glide path using Monitoring and Modeling Data Trends Natural Conditions International Anthropogenic Contributions.
Overview of WRAP 2014 Platform develop and Shake-Out project update
WRAP Regional Haze Grant Status, Technical Project Priorities, & Proposed Technical Analysis Forum Tom Moore WRAP Technical Coordinator Attribution.
2012 Spring Business Meeting Seattle, Washington
NERC Reliability Standards Development Plan
Western Regional Haze Planning and
Tribal Data WG Fire and Smoke WG Oil and Gas WG
North Carolina Council on Developmental Disabilities
Tribal Data WG Fire and Smoke WG Oil and Gas WG
timeframe in to be determined
WRAP Regional Haze Planning Schedule of Communication
NERC Reliability Standards Development Plan
TIBC Budget Formulation Improvement Project
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Regional Technical Support Document
COLORADO ACCESS Region 5 Program Improvement Advisory Committee
Tribal Data WG Fire and Smoke WG Oil and Gas WG
RHPWG – Control Measures Subcommittee Oil & Gas Source Coordination
Regional Haze SIP Status Report
Next Steps on the §309 Regional Technical Support Document April 2003
Fire Emissions and Smoke Management Plans
WRAP Regional Haze Planning Webinar June 20, 2019
WESTAR (State Caucus) Recommendations
Stationary Sources Joint Forum: Next Steps
Technical Review Workshop
Roles and Responsibilities
WESTAR Staff Reports Technical Coordinator Report
Status of Preliminary Reasonable Progress Analysis
Tribal Data WG Fire and Smoke WG Oil and Gas WG
EPA’s Roadmap for the Second Planning Period
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Tribal Data WG Fire and Smoke WG Oil and Gas WG
Presentation transcript:

Monthly Update on 2018-2019 WRAP Workplan June 26th, 2019 TSC and Work Group Co-Chairs Call Tribal Data WG Fire and Smoke WG Oil and Gas WG Regional Technical Operations WG Regional Haze Planning WG

Tribal Data Work Group

Workplan Progress by Tribal Data Work Group Workplan Progress over the Last Month Contracted/EN3 review & comments on CC Framework – “redline” draft of Framework based on the review Workplan Tasks for the Next Two Months Complete finalization by consensus of products under contract (oil & gas study) Plan 2nd webinar Relay TDWG/contractor feedback to RHPWG contractor on Consultation & Coordination Framework Send participation letter for TDWG Create “active tribes” section of tribal contacts list based on participation letter responses

Workplan Coordination Activities by Tribal Data Work Group Workplan Coordination Occurring over the Last Month EN3 continued outreach with O&G tribes Workplan Coordination Needed over the Next Two Months RHPWG – submit to RHPWG/Ramboll combined or staggered- any reviews/comments of Framework (contractor/EN3, Co-chairs) to accompany C&G SC – requested reviews. Target July 8 Review turn-around revision from Ramboll by July 18 (TDWG call), possible joint call w/ CGSC early Aug Tribal contacts list – format & arrange for state planning use via RHPWG OGWG – webinar possibility? Remaining EI’s from contacted tribes- share with OGWG

Fire and Smoke Work Group

Workplan Progress by Fire and Smoke Work Group Workplan Progress over the Last Month Baseline Wildfire Emissions Inventory development Reviewed & approved methodology for Baseline Period Wildfire Emissions Estimates Contractor working on baseline inventory Continued scoping out the Smoke Management Plan/Program mapping project Workplan Tasks for the Next Two Months Finalize Baseline Wildfire Emissions Inventory Continue scoping out the Smoke Management Plan/Program mapping project Begin discussions on future fire scenario development.

Workplan Coordination Activities by Fire and Smoke Work Group Workplan Coordination Occurring over the Last Month Coordination between Representative Baseline and Future Fire Scenario sub-group and Fire and Smoke Workgroup. Workplan Coordination Needed over the Next Two Months Coordinate with RTOWG for evaluation of sensitivity of modeled baseline vs. base year 20% most impaired days. e.g., how sensitive is modeled 20% most impaired days to modulating wildfire emissions? Coordinate with RTOWG and RHPWG on questions: How will future fire scenario modeling be used in RH planning? What specific questions need to be addressed? Given limited resources, how many future year modeling sensitivity scenarios are possible? How many future fire scenarios should be generated? Coordinate with TSC. What other questions beyond RH planning are we looking to address with the development of future fire emissions scenarios?

Oil and Gas Work Group

Workplan Progress by Oil and Gas Work Group Workplan Progress over the Last Month OGWG and PMT review and feedback Baseline Inventory – Underway WRAP OGWG Draft Baseline Inventory (v2) and Report [v2 integrated OGWG survey data] (for OGWG review – June 25 comments were due) Forecast Scenarios – Underway Workplan Tasks for the Next Two Months Task 1: Baseline Inventory Final Inventory (v2) (anticipated late June) Survey Data Memo [gas compositions and controls] (anticipated in early-July) Task 2: Forecast 2028 Inventory (On-the-books controls) – Summer Medium forecast scenario being finalized based on previous agency input Developing low and high forecast scenario methodology Task 3: Forecast 2028 Inventory (Additional Reasonable controls) – Summer Single forecast scenario and Integrate OGWG survey data

Workplan Coordination Activities by OGWG Workplan Coordination Occurring over the Last Month June 4 – Project Management Team Call Coordinate and PMT feedback with Ramboll June 11 – OGWG Bi-Monthly Call Proposed Navajo Nation Minor Source Regulations RHPWG Control Measures Subcommittee – O&G Source Coordination June 20 – RHPWG Quarterly Outreach Webinar included OGWG Workplan Coordination Needed over the Next Two Months July 2 – Project Management Team Call August 13 – OGWG Bi-Monthly Call OGWG and PMT review and feedback on draft work products Coordination (External to WRAP) Occurring / Needed EPA’s 2016 Modeling Platform – availability of OGWG Baseline Inventory 2017 NEI – account for inventory improvements

Regional Technical Operations Work Group

Workplan Progress by RTOWG Workplan Progress over the Last Month 2014 Shakeout v.2 modeling underway Workplan Tasks for the Next Two Months Review of Shakeout v.2 modeling results Representative baseline modeling Reflect current emissions under ‘normal’ conditions Basis for 2028 modeling Use updated GEOS-Chem results for boundary conditions White paper on new GEOS-Chem simulations to evaluate Natural conditions International contributions

Workplan Coordination Activities by RTOWG Workplan Coordination Occurring over the Last Month Calls we participated in WRAP Regional Haze Planning - Summer Solstice 2019 Outreach OGWG RHPWG EPA-State modeling review workgroup NASA HAQAST haze call Workplan Coordination Needed over the Next Two Months RTOWG call, 7/16/19 WAQS 2014 Shakeout v1 / v2 progress, 7/17/19 Emission updates Shakeout v.2 Baseline modeling

Regional Haze Planning Work Group

Workplan Progress by Regional Haze Planning Work Group Workplan Progress and Coordination over the Last Month June 20th Milestone Webinar Coordinate with FSWG & OGWG on the June webinar Workplan tasks and Coordination for the Next Two Months Consensus on the WRAP Communication Framework Coordinate with CGP Subcommittee on the development of Regional Haze Storyboard

Workplan Progress by Coordination and Glide Path Subcommittee Workplan Progress over the Last Month Task 6.3: Develop New Materials D) Storyboard – Haze in the West Team has drafted an outline of the storyboard. Looking to hire a contractor to produce a mock-up that can be presented to the states. Aiming to present on the Fall Periodic Webinar. E) Webinar Presentations to States Next milestone webinar targeting Fall 2019 Task 7.1: Review TSS v1 for Priority Needs Coordinating call with RTOWG to discuss “TSS Priorities” document feedback Task 7.2: Coordinate and Review TSS v2 Monitor Data Tool Development Monthly presentations on new metrics and tools from CIRA on TSS progress We need to "freeze" the TSS version of the IMPROVE base data and RHR/Impairment metrics for planning period. Workplan Tasks for the Next Two Months Task 1.2: Analyze monitor data trends Brandon (Montana) and ARS planning on giving a short update on the next call then hosting an August webinar on the results of the trend analysis and natural conditions alternative ideas project. B) Glossary & C) FAQs Potential for contractor support. Creation of scope of work to detail deliverables Task 8.2: Establish Consultation-Coordination Framework Ramboll is working with the C&GP sub and the TDWG to integrate feedback into a final product. FLM’s also drafting content for 1 pagers.

Workplan Coordination Activities by Coordination and Glide Path Subcommittee Workplan Coordination Occurring over the Last Month The subcommittee coordinated with the following entities: RTOWG – Draft FLM Priorities Document Review EI&MP Sub – Draft FLM Priorities Document Review FLMs – Updated agendas and Coordination Framework Workplan Coordination Needed over the Next Two Months RTOWG – Coordination on Natural Conditions Project findings and opportunities to model outcomes for future planning periods.

Workplan Progress by EI&MP Subcommittee Workplan Progress over the Last Month 2014 Base Case (Shakeout v2) emissions changes being processed by contractor Identified minor issues with some state inputs and corrected Representative Baseline emissions changes received from states Workplan Tasks for the Next Two Months Send out memo describing Shakeout v2 updates Compile and reformat representative baseline emissions updates from states Procedural guidance for OTB emissions to be submitted by states

Workplan Coordination by EI&MP Subcommittee Workplan Coordination Occurring over the Last Month O&G Workgroup reviewed v1 emissions; O&G v2 emissions will come from contractor based on state comments Workplan Coordination Needed over the Next Two Months v2 shakeout, representative baseline, and OTB modeling scenarios require coordination as needed with O&G WG, contractor, Fire & Smoke WG, Coordinate with Communication subcommittee to provide guidance to states on what is needed from them for the different modeling scenarios.

WRAP goal: complete by late 2019 Workplan Progress by Control Measures Subcommittee Workplan Progress over the Last Month Q/d analysis work products complete Spreadsheet and database tools on the TSS Ramboll created an interactive map of Class I areas with radius of impact and facilities with Q > 4,000 tpy – posted on TSS Workplan Tasks for the Next Two Months Begin to identify 2028 control strategies for incorporation in 2028 inventory Many states are notifying sources and beginning the control strategy analysis, some states already working on the analysis Draft Source Control Assessment Considerations memo being prepared to assist states in performing the four-factor analysis WRAP goal: complete by late 2019

Workplan Coordination by Control Measures Subcommittee Workplan Coordination Occurring over the Last Month Coordination call (on May 28th) with the O&G Workgroup discussing potential control options for oil and gas sector Workplan Coordination Needed over the Next Two Months Continued coordination calls with the O&G Workgroup Montana coordinating western state RH O&G call to gauge interest in discussing potential control options for oil and gas sector Several states have expressed interest: Colorado, Montana, North Dakota, Utah and Wyoming Coordinate with EI &MP Subcommittee on timing of conversations with sources to generate/confirm emission inventory inputs for modeling

End of Workplan Progress Update