Streetscape Water Street Gateway A Centretown Concept.

Slides:



Advertisements
Similar presentations
Who we are these people? Gabriela Vega – Transportation Planner, DDOT/PPSA George Branyan – Pedestrian Program Coordinator, DDOT/PPSA Trey Dickerson –
Advertisements

Downtown Revitalization Along Lafayette and Diamond Bridge Avenues Borough of Hawthorne October 15, 2014 Borough Engineer: Stephen T. Boswell, Ph.D., P.E.,
Neighborhood Preservation Program Planning Proposal.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
Emerson Avenue Corridor Gateway Project Welcome. Introductions Rebecca Seifert MSW, Executive Director Gennesaret Free Clinic and the Chair of the Emerson.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Before : Inadequate gateway point along Highway 100 No Sense.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Contact: Beth Morris
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Retrofitting Suburbia CIDs as a Partner in Progress April 9, 2009 Brett Harrell, Executive Director Evermore Community Improvement District 2463 Heritage.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Trail Funding Sources & General Information
Auzerais Avenue Project: Underpass Beautification The Delmas Park Neighborhood Association proposes to beautify gateways to the city that run through the.
In association with: 73 rd Street to Indian Bend Wash Bridge THOMAS ROAD STREETSCAPE 73 RD STREET TO INDIAN BEND WASH BRIDGE PROJECT NO. T0606 City of.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
City of Auburn Streetscape: A Complete Street Presented by: Ed Armstrong, RLA.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Upper Niagara Street Proposal Black Rock Neighborhood Scajaquada Expressway to Ontario St Devashree S. Desai Ayla Abiad Sampada S. Pulekar Anwesha Samanta.
Maintenance Agreement with Town Center At Palm Coast Community Development District City Council Workshop February 10, 2015.
Grand Canalscape Phase I and II General Update October 30, 2015.
Downtown Decatur Neighbors Requested Crosswalk Improvements Buddy Harrell Chair, Planning & Development Committee
LITTLE BOHEMIA NEIGHBORHOOD ASSOCIATION 35E Bike Path Enhancement CIB Proposal.
109th Street: The Bridge District1. The Bridge District A bold vision for the redevelopment of the 109 th Street corridor.
Madison Avenue Reconstruction Department of Planning and Development.
Overview of Planning Concepts for the Mixed-Use Corner.
A stop sign is a traffic sign that stands for coming to a complete stop at an intersection or end of the road.
A PRESENTATION BY THE DISTRICT 1 COMMUNITY COUNCIL POINT DOUGLAS ROAD RECONSTRUCTION.
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
Livingston County Transportation Connectivity Plan Final Report December 2013.
University of Palestine College of Applied Engineering and Urban Planning Architecture Department Landscape Second semester st lecture -1 st week.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Mobility for all Modes Update to the Transportation Chapter of the City’s Comprehensive Plan City Council May 27,
City of Snoqualmie Tokul Roundabout Project April 10, 2012.
Lexington Road Corridor Transportation Plan Public Meeting #1 October 7, 2014 Welcome!! And Thank You for Coming Out.
Complete Streets Training Module 4b – Designing for All Users.
Surviving through Downtown Construction
Bremer Avenue Rebuild Streetscape Concept Proposal
Hesperian Boulevard Corridor Improvement Project San Lorenzo
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
Ashland Redevelopment Authority
Marina Vista Streetscape Project
Project Management Team Meeting #3
The City of Colorado Springs Recognized a Unique and Powerful Window of Opportunity: Linking Expansion of its Knowledge and Innovation Capacity (UCCS)
District 3 Complete Streets Projects
Stanford Avenue/El Camino Real Intersection Improvements Project
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
FY 2011 Status Report on the Ormond Beach Downtown CRA
US1 AT CANAL STREET INTERSECTION DESIGN DEVELOPMENT
Ad Hoc Advisory Group presentation, August 3, 2016
Community Information Session
Arizona Conference on Roads and Streets Multimodal Cities: Addressing Issues in Transit Corridors March 24, 2016.
Downtown Valdosta Truck Traffic Mitigation Study
Motor Row Streetscapes
Adoption of the FY Capital Improvement Program Budget
58 Main Street Midway City 2016 General Plan
Place Type: Community Center
Complete Streets & Livable Communities Jacob Snow General Manager 1.
DEDD Mission: Create attractive physical and economic conditions in Downtown Monroe. DEDD led efforts to develop RiverMarket, which created a launching.
Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration
Charter oak international academy
Streetscape Water Street Gateway A Centretown Concept.
IT’S MORE THAN JUST A ROAD
Module 6 A 21st Century Transportation Network
Presentation transcript:

Streetscape Water Street Gateway A Centretown Concept

Concept: That the City of Cornwall consider the creation of gateway features at the corner of Water Street and Brookdale Avenue that welcomes U.S. travelers to the city and directs traffic to the waterfront and our two small business districts. An associated banner project will help denote this district for visitors and area residents alike. Gateway concept – Water Street

The look: Creation of a pair of gateway features at the corner of Water Street and Brookdale Avenue that welcomes U.S. travelers to the city and directs traffic to the waterfront and our two small-business districts. Wayfinding signage at the pumphouse and the addition of greenery will augment beautification work along this corridor. Cost: $35,000 each

The look (continued): The features can be sourced locally and created with concrete and brick that will stand the test of time. As this is an international crossing the inclusion of the Canadian flag is desirable. The addition of greenery will help augment beautification along this busy municipal corridor. Cost: $35,000 each

Banners: New triangular banners can be added to existing and new light standards on the median along Water Street, that denote this district. These banner concepts have been approved by both BIAs and can be created with material that will mitigate wind damage. Cost: $250 each

Banners: The waterfront banners follow the same design and theme of similar triangular banners that are planned for both the Downtown BIA and Le Village. Cost: Borne by the BIAs

Banners: Completely bilingual, with the exception of the ‘Downtown’ and ‘Le Village’ designations in order to maintain the identity of those locations. *Community feedback required*

Banners: Banners can be affixed to existing and new light standards to denote the district for motorists and pedestrians. In this particular case a new pole would have to be installed.

Banners: Banners can be affixed to existing and new light standards to denote the district for motorists and pedestrians. Banners should be staggered, perhaps at regular intervals on every other light standard, to avoid saturation.

Budget: The execution of this project can be considered for the 2019 municipal budget and phased in over a period of a couple of years if this is more fiscally palatable. The city has already undertaken road resurfacing on Water Street and the creation of crosswalks that include interlocking brickwork. This is in place of work that was budgeted, but ultimately abandoned to add interlocking brick to the entire intersection at Brookdale Avenue and Water Street. Gateway features x2 $70,000 Banners (Water Street) x32 $8,000 Banners installation x32 $10,000 Landscaping (pumphouse, gateways) $7,500 Wayfinding signage (pumphouse) $4,500 Total: $100,000 Gateway concept – Water Street

Thank you Questions?