BCAR & The Technical Guidance Documents Conference 2019 Part E: Sound

Slides:



Advertisements
Similar presentations
Loft Conversions - The building regulations Chris Wigley MD London Building Control Ltd
Advertisements

HOUSING SOUND INSULATION & SUSTAINABLE DEVELOPMENT Dr Sean Smith Building Performance Centre Napier University Scottish Executive – Victoria Quay BPC.
The builders experience – mere compliance to enhanced performance Sustainable new homes and sound insulation conference Dave Poole.
WP4 – Task 4.4 LCA Activities
Third Party Certification & The Q-Mark Scheme. What is third party certification? Independent process of certifying that a manufacturer continues to comply.
Concrete Pre Cast Panel By Peter Spence ID:
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
Summary of Ofgem ECO 1.2 consultation workshop Minimum insulation levels for primary measures and building regulations 28 August 2014.
ISO 9000:2000 Quality system standards adopted in 1987 by International Organization for Standardization; revised in 1994 and 2000 Technical specifications.
ASPEC Internal Auditor Training Version
ISO 9000 Certification ISO 9001 and ISO
LEGISLATION OVERVIEW & PROCEDURES Douglas Walker Chairman Scottish Registration Board Structural Engineers Registration Ltd.
13. Airworthiness of Aircraft-1 Certificate of Type Approval Certificate of Type Approval A Certificate of Type Approval approves the basic design and.
Introduction The Gamma Bracing System  Gamma bracing system is a light weight steel, structural truss bracing frame that fits INSIDE the timber studs.
Part of the BRE Trust Approved Certifiers of Design: Section 6 (Energy) BRE Scotland.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
STRUCTURE-BORNE SOUND INTRODUCTION IMPACT ISOLATION IMPACT ISOLATION CLASS (IIC) IIC IMPROVEMENTS IMPACT NOISES DESCRIPTION:  IMPACT NOISES ARE ERRATIC.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
ACOSHAPE Acoustic Lighting Case Study Document. Requirements General school areas such as; meeting rooms, offices, libraries and classrooms have to reach.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Building Industry Authority Determination 2003/3 Commentary Paul Clements.
Fire Resistance Rated Truss Assemblies Educational Overview.
Robustdetails Feedback from Robust Details Technical Advisors.
Building Regulations & The Building Control System 4A7 Design & the Built Environment John O’Connor.
Building Act Post Moratorium Reforms Occupancy Certification System Department of Lands, Planning and the Environment May 2016.
SOUND INSULATING MATERIALS PRESENTED BY : TANDEL RAJAT B. ( ) GUIDED BY:- PROF.N.B.KAGRA GOVERNMENT ENGINEERING COLLEGE, DAHOD CIVIL ENGINEERING.
Introduction to CE marking for construction products and how this relates to national construction regulations Dr. Adam Pinney, CPR expert Adam Pinney.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
Code for Sustainable Homes Materials
Refer to slide robustdetails robustdetails.
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Recommended Practices in Housing Credit Compliance
Prefabricated Timber Frame Construction
Selection of contractors & PAS91:
Sustainable new homes and sound insulation 2006
Apartment Owners Network Fire Safety in Existing Apartment Blocks
Regulation and compliance with performance standards
UPPER FLOORS TIMBER AND CONCRETE.
Refer to slide robustdetails robustdetails.
RIBA Plan of Work 2013.
Michel BRENON IEC ExTAG Secretary
BUILDING CONSTRUCTION 1
Energy Code Program Manager – SPEER
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
ACOUSTIC DESIGN OF BUILDINGS
Setting Actuarial Standards
Certification system for prepackages
Management Verifications & Sampling Methods
Backgrounds and plaster
What is the UL QFCP? FCIA Webinar Presenters:
New Building Regulations L1
‘Top Ten’ Things Auditors Should Know About 9104/1
Effective Building Control System
Building Regulations, EPBD & Part L for Existing Buildings
Housing Standard Review & Building Regulation changes
Operationalizing Export Certification and Regionalization Programmes
HSSE Bridging Overview
Introduction The Gamma Bracing System
Insurance, Liability and Indemnity issues for Assigned Certifiers
Conference 2015 Chris Barry, B.Sc. M.Sc. Pg. Dip. F.S.P. N.D.F.E.M.
ISO 9001.
NZEB Dwellings and Major Renovations
ANCILLARY CERTIFICATION UNDER BC(A)R
RIBA Plan of Work 2013.
IMPLEMENTING THE CHANGES WHAT’S IN IT FOR ACCREDITATION BODIES
Introduction The Gamma Bracing System
Presentation transcript:

BCAR & The Technical Guidance Documents Conference 2019 Part E: Sound

BUILDING REGULATIONS 2014 Regulation E1 – Sound Each wall and floor separating a dwelling from (a) another dwelling or dwellings, (b) other parts of the same building, (c) adjoining buildings, shall be designed and constructed in such a way so as to provide reasonable resistance to sound.

BUILDING REGULATIONS 2014 Regulation E2 – Reverberation The common internal part of a building which provides direct access to a dwelling shall be designed and constructed so as to limit reverberation in the common part to a reasonable level.

Application of Part E Amended Part E published in Dec 2014. “Guidance … applies to works, or buildings in which a material change of use takes place, where the works or the change of use commence or takes place, as the case may be on or after 1 July 2015.” Design and testing per the new Regulations is well established.

Sound Performance Levels “In general for dwellings, the performance required by Regulation E1 should be satisfied by achieving the sound insulation performance levels as specified in Table 1...” NEW GUIDANCE

Acceptable Constructions Section 3: Separating walls and associated flanking construction details Section 4: Separating floors and associated flanking construction details Afford prima facie compliance with Regulation E1, once performance is demonstrated through testing.

Example

Wall Type 1 - Solid masonry/ concrete with plaster finish

Wall Type 2 - Solid masonry with dry lining

Wall Type 3 - Cavity masonry wall with plaster finish

Wall Type 4 - Timber framed wall with absorbent material

Floor Type 1 - Resilient material bonded to concrete Includes a suspended ceiling below the concrete base.

Floor Type 2 - Floating layer on concrete base Includes a suspended ceiling below the concrete base.

Floor Type 3 - Floating layer on timber base Includes a suspended ceiling below the timber base.

Site Inspections To be conducted at key milestones: Closing up of floors and partitions; Erection of suspended ceilings; During façade assembly; and Immediately prior to testing.

Mandatory pre-completion testing by a competent person. Tests to be performed on a representative sample of dwellings. “Other” construction types require more tests, unless Assessed Sound Details. NEW GUIDANCE

“Sets of Tests” Each “set of tests” comprises a given number of airborne and, in the case of floors, impact tests. In houses, bungalows: 2 no. airborne tests on walls. In apartments, duplexes: 2 no. airborne tests on walls, 2 no. airborne tests on floors, 2 no. impact tests on floors.

“Sets of Tests”

Frequency of Testing TGD Constructions Other Constructions Table 3A Minimum frequency of testing per group or sub-group type (Par. 2.2.3) Number of attached dwellings ‘Sets of tests’ required 4 or less At least 1 Greater than 4 but less than or equal to 20 At least 2 Greater than 20 but less than or equal to 40 At least 2 + 10% x No. of attached dwellings greater than 20 Greater than 40 but less than or equal to 100 At least 4 + 5% x No. of attached dwellings greater than 40 More than 100 At least 7 + 5% x No. of attached dwellings greater than 100 Table 3B Other constructions - minimum frequency of testing per group or sub-group type (Par. 2.4.1.3) Number of attached dwellings ‘Sets of tests’ required Up to 8 At least 1 for each sep. element (up to 4) Greater than 8 but less than or equal to 20 At least 6 Greater than 20 but less than or equal to 40 At least 6 + 10% x No. of attached dwellings greater than 20 Greater than 40 but less than or equal to 100 At least 8 + 5% x No. of attached dwellings greater than 40 More than 100 At least 11 + 5% x No. of attached dwellings greater than 100

Assessed Sound Details (ASD’s) Assessment/certification for constructions not listed in TGD E. 30 no. in-situ tests, max 16 no. per site, by at least two different testers. Report to be assessed by an independent approved body, e.g. NSAI. Advantage: reduced testing per Table 3A.

Procedure for Testing and Reporting “Sound insulation testing should be conducted by a competent person…” Testing per I.S. EN ISO 16283 and 3382-2, rated per I.S. EN ISO 717. Living rooms and bedrooms >25m3 (use kitchens and dining room only where necessary).

Procedure for Testing and Reporting (cont.) Test in completed but unfurnished rooms. Doors and windows should be closed. Fitted units, cupboards etc. should be open and empty. Up to two individual tests may be conducted on any given separating wall or floor.

Reverberation Control Apply an acoustically absorptive material to circulation space that provides direct access access to dwellings: Method A is based on consideration of floor areas Method B involves calculations NEW GUIDANCE

Class of Absorption

Method B Example Method B results in the use of a Class D absorber instead of Class C per Method A

The Need for a Certification Scheme DECLG requested that a certification scheme should form part of the improved regime and sought an industry response. TGD E: “Sound insulation tests carried out by a person certified by an independent third party to carry out this work offers a way of ensuring that such certification can be relied upon.”

SITRI Ireland’s certification scheme is known as SITRI, Sound Insulation Testing Register (Ireland) The scheme database is known as VISIT, Verifying Irish Sound Insulation Tests

Any Questions?

Thank you for your attention