Project Scheduling Using OpenProj.

Slides:



Advertisements
Similar presentations
Microsoft Project Tutorial for Chapters 6 & 7
Advertisements

CIS 480 Systems Analysis and Design
Management Information Systems [MOIS470]
Microsoft Project Entering and Organizing Tasks Adapted from the Microsoft Step by Step Series by Aaron Schroeder.
©2012 Construction Science, LLC 1 Primavera P6 Settings Presented by Karen Reynolds, Partner Construction Science, LLC.
TUTORIAL 6 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 25/11/2012 Introduction to MS Project 2007.
PERTEMUAN 3 PPSI Microsoft Project Presentation. What is a Gantt Chart? A Gantt Chart is a visual tool to help Plan, Manage, and Track a project or projects.
MS Project Tutorial EMEN. Entering Project Properties Choose File Properties Click the Summary tab You can now enter general information about the project.
Microsoft Project.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
Microsoft Project 2010 Dr. Nouh Alhindawi Jadara University.
Building Your Project Work Plan in March 2, 2007 HP Project & Portfolio Management by Dan Gallagher See NOTES page for Presentation Discussion, Tips &
1 Project Planning with MS Project Kishore October 2002 Notes available in the presentation: To view notes download the presentation and select View->
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
Project Plan Optimization Lesson 13. Skills Matrix SkillsMatrix Skill Make time and date adjustments Adjust fiscal year settings within Microsoft Project.
Project Basics Lesson 1. Skills Matrix SkillsMatrix Skill Start Microsoft Project Standard Create a project planOpen a new project plan Specify a start.
1 of 4 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Microsoft Project 98 Tutorial1 Microsoft Project 98 Presented By: Ipsita B. Chowdhury.
Introduction to Project Management ECE 480 Erik Goodman.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Microsoft Project Presentation By Corey Johnson 10/11/00.
Planning. SDLC Planning Analysis Design Implementation.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
OPSM 639, C. Akkan SAVE your existing MS Project File at the end of PART3 as _PART4 _PART4 WITH BASELINE. Make sure you keep the original file without.
MS-Project tutorial Phongphan Danphitsanuphan CSSE – Computer Science Dept University of Southern California.
Tracking progress on tasks and assignments TUTORIAL # 3.
Microsoft Project – Tutorial 2 Project Goal network company computers to easily share resources within a time frame of three months and within a budget.
A description of how to construct a Work Breakdown Structure (WBS) with past historical data on a project that is in-flighted to U PlanIT. Next © 2009.
The Project Plan IT Project Management COSC
MS project Abeer Bin Humaid. What is project management? Project management is “the application of knowledge, skills, tools, and techniques to project.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
Becoming a Great Project Manager Gini Courter Annette Marquis TRIAD Consulting.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
1 Microsoft Project Pro CHAPTER 4 Viewing Project Information.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
Project Schedules Chapter 4 Applied Software Project Management, Stellman & Greene See also:
Microsoft Project User Group May 2002 – Chapter Meeting Scheduling - Best Practices Initiation and Planning Presented by James Nuthall Brentford Technologies,
Microsoft Project Tutorial Jesal Bhuta
6. TRACKING PROGRESS. OBJECTIVES Save current schedule values in a plan as a baseline. Record progress on tasks through a specific date. Record tasks’
Test status report Test status report is important to track the important project issues, accomplishments of the projects, pending work and milestone analysis(
Project Plan Tracking – Fundamentals Lesson 8. Skills Matrix SkillsMatrix Skill Establish a project baseline Track a project as scheduled.
@ Faculty of Information Technology, UNS, 2008 TRACKING PROGRESS Nguyễn Hoàng Anh
Microsoft Project Tutorial for CSCI 577 Fall 2006 Jesal Bhuta
GE 121 – Engineering Design Engineering Design GE121 Managing The Design Process Part II Lecture 11B.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
Parallon Business Solutions Microsoft Project Server 2010 Project Server 2010 Concepts of Working with Tasks.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
1 Microsoft Project 2010 Demo Part 2. 2 Problem 2.8: Enter Tasks Enter tasks and times for problem 2.8. Be sure to click Project/Project Information to.
VA Primavera P6: Baselining the Project Department of Veterans Affairs Office of Information and Technology IT Workforce Development (ITWD) in collaboration.
Microsoft Project 2003 By: Mahmoud Saad El-Din. Topics  Creating a new project.  Working with workspace project.  Defining project information.  Working.
© 2008 Prentice HallAppendix A -1 Introduction to Project Management Appendix Microsoft Project Tutorial Information Systems Project Management: A Process.
Creating a Work Breakdown Structure with Microsoft Project.
Microsoft Project 101: How to Build a Project Plan

ENGINEERING MANAGEMENT (GE 404)
Guide to Project.
In this tutorial you will:
PROJECT MANAGEMENT Bill Biddle.
Software Engineering I Fall 2017
ENGINEERING MANAGEMENT (GE 404)
Information System Analysis
مهارات المشاريع لأعضاء الهيئة الإدارية
Software Engineering I Fall 2017
All Right Reserved © JiJi Technologies Pvt Ltd
Expedite Project Updates Using a Custom Status View
CAD DESK PRIMAVERA PRESENTATION.
All Right Reserved © JiJi Technologies Pvt Ltd
Presentation transcript:

Project Scheduling Using OpenProj

Project Portfolio Management PPM – Project Portfolio Management Every company executes a set of tasks, that can be grouped together, utilizing a group of human resources and machinery/hardware – this is termed as project In every project, we need to track resources, time and cost In every project we need to plan, track and analyze the status Usually a team reports to a project manager OpenProj by Serena Software, helps to track projects The competing tools for OpenProj are Microsoft Project Plan, Open Workbench etc.

Tasks Tasks are the building blocks of project management A task must have a definitive start date and definitive end date A task can be assigned to one or more people A task can have a predecessor and/or successor. This creates a dependency between tasks We can have a detailed notes for every task

Resources A resource can be a human resource or machinery Resources will be associated with regular time rate and overtime rate Resources will be tied to the tasks for tracking purposes Resources are not shared between projects. Each project is treated as a separate entity

Project Calendar For scheduling a project, a base calendar is required In the calendar we specify the regular work time, holidays, etc We can use 24 hour calendar or a regular time calendar If required, we can also specify any unconventional work times Number of hours per day, number of days per week, number of days per month can be configured

Task Tracking Gantt chart is used to see a pictorial view of the task dependencies Gantt chart uses timeline as X axis and tasks on the Y axis, one below the other To create subtasks, use indentation feature We can define a task as milestone task as well to indicate a logical end point We can specify the percentage completion for every task When percentage completion is 100%, the task will be indicated with a tick mark

Baselines When tracking the tasks and the progress, it is imperative to save a baseline Baseline is a snapshot of the plan at a given point of time. After many updations to the plan, during the tracking phase, we can compare that with baseline dates This will tell us whether we are in line with or deviating from the original plans 11 baselines can be stored for every project Usually we suggest to have a weekly baseline of the plans If more baselines are required, we can clear some of the previously defined baselines

Task View The task grid can have many more columns We can hide an existing column or add a new column. There are many predefined columns such as priority etc. We can add our own text, number and date columns and rename them as well, as required Any column can be resized and the order of the columns can be rearranged When you double click on a task, you can see details of that particular task

Constraints The tasks do have dependencies as Finish to start, Finish to finish, Start to start, Start to finish. Depending on predecessors start and finish dates, and the dependency, the next task will be scheduled Apart from this we can specify constraints like, Start no earlier than, must start on, must end on etc. These constraints put additional stress on ensuring the tracking is done correctly

Work and Cost When we include the work column, based on the number of hours configured per day, the effort is calculated We can use the work part to calculate the planned and the actual efforts When we associate cost to resources and tasks to resources, the cost of the resources are used to calculate the cost of the task. The cost calculation is based on the work hours