Precedence Diagram Technique Precedence Networks Critical Path Analysis.

Slides:



Advertisements
Similar presentations
Chapter 9: Probabilistic Scheduling Models
Advertisements

Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. *See PowerPoint Lecture Outline for a complete, ready-made.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 101.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 112.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Break Time Remaining 10:00.
Lecture Network Analysis
Precedence Diagramming
Lecture 4 – PERT Diagrams & CPM
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
IE 2030 Lecture 5: Project Management Drawing Gantt Charts Time on horizontal axis, Activities on vertical axis. 1 bar per activity Length of bar = required.
Chapter 7 Project Management
CP Chapter 4 Schedule Planning.
Chapter 6: Developing a Project Plan
Project Management 6e..
Chapter 17 Project Management McGraw-Hill/Irwin
Developing the Project Plan
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
Finding the Critical Path
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Management CPM/PERT Professor Ahmadi.
SE503 Advanced Project Management
Project Scheduling: Lagging, Crashing, and Activity Networks
Chapter 9 Project Scheduling: PERT/CPM
Chapter 3 Project Management.
Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects. Use.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
15. Oktober Oktober Oktober 2012.
We are learning how to read the 24 hour clock
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
Clock will move after 1 minute
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Critical Path Analysis. There are no pre-requisites for this Achievement Standard so it can be placed in any course. No knowledge is pre-supposed.
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
Scheduling the Project
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
MGMT 483 Week 8 Scheduling.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Importance of Project Schedules
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Project Planning & Scheduling
The Project Schedule and Budget
deterministic Fixed and known in advance, representing a
Project Planning & Scheduling
Project Scheduling: networks, duration estimation, and critical path
Project Time Management
Project Time Management
Project Time Management
Project Time Management
AOA A style of project network diagram in which arrows
Project Time Management
Presentation transcript:

Precedence Diagram Technique Precedence Networks Critical Path Analysis

why do it? what are the inputs? the process using the outputs PERT and uncertainty

identify tasks sequence estimate resources analysis scheduling optimisation the context

what are the benefits? critical path non-critical activities

what are the inputs? tasks sequence/dependencies durations

Sequence the most common sequences / dependencies Task ATask B Task A Task B Task C Task B Task A Task B depends upon Task A; B cannot start until A is finished Task C depends upon Task A and B; C cannot start until both A and B are finished Tasks B and C depend on Task A; neither can start until A is finished, but B and C are independent of each other

rules and conventions just one start just one finish no danglers task number and/or name duration early start time late start time early finish time late finish time float slack

the process - 2 stages draw analyse Task 01Task 02Task 04Task 06Task 03Task 05Task 07Task 08Task 09

the process - forward pass Duration = 18 Task 06 2 Task Task Task Task Task Task Task Task

the process - backward pass Task Task Task Task Task Task Task Task Task

more unusual links and relationships so far all links have been finish-start links... Task ATask B Task A Task C Task A Task B depends upon Task A, but with a 3 day delay; B cannot start until 3 days after A is finished The finish of Task C depends upon the finish of Task A The start of Task C depends on the start of Task A; this is a start-to-start link; it may also incorporate a delay 3 days

using the outputs Gantt Charts resource histograms resource smoothing optimising the schedule

Scheduling task 1 task 2 task 3 task 4 task 5 task 6 task 7 task res.Duration Calendar 2 days 3 days 1 day 2 days 7 days 4 days 1 day Jane Bill Jane Jim Bill Jane Bill

PERT and uncertainty - 1 Task 01Task 02Task 03Task The critical path looks like tasks But what if you are not sure about the duration for Task 03?

PERT and uncertainty - 2 Task 01Task 02Task 03Task The better estimate for Task 03 might be its PERT estimate, or Expected Value, EV) EV = O + 4L + P ___________ 6 O = Optimistic estimate (say 2) L = Most Likely (say 4) P = Pessimistic (say 12) In this example the EV = 6, which does, in fact change the critical path

PERT and uncertainty - 3 But how confident can we be in these results? An durations spread is the degree to which estimates of the duration differ from each other. If every estimate of duration were about equal, the estimate would have very little spread. There are many measures of spread. The distributions on this page have the same mean but differ in spread: the distribution on the bottom is more spread out.

PERT and uncertainty - 4 Standard deviation is used as a measure of spread. In a normal distribution, about 68% of estimates are within one standard deviation of the mean and about 95% of the estimates are within two standards deviations of the mean. EV = O + 4L + P ___________ 6 O = Optimistic estimate (say 2) L = Most Likely (say 4) P = Pessimistic (say 12) SD = (P – O)/6In our example SD = (12-2)/6 = So, we could say that, for task 03: With 68% certainty, the duration will be between 2.34 and 5.66 (4 ± SD) With 95% certainty the duration will be between 0.68 and 7.32 (4 ± 2SD)

Classroom Practice - 1 Task 01 Task 02 Task 04 Task 06 Task 03 Task 05 Task 07 Task 08 Task

Classroom Practice - 2 Task 01 Task 02 Task 04 Task 06 Task 03 Task 05 Task

Classroom Practice - 3 Task 01 Task 02 Task 06 Task 03 Task 05 Task 07 Task days