Upcoming CALICE meetings

Slides:



Advertisements
Similar presentations
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
Advertisements

UK CALICE plans Birmingham, Cambridge, Imperial, Manchester,RAL,RHUL,UCL.
school program selections. Available September 4 thru 7, 2012.
Beam Background and Detector Layout 4th Concept Collaboration Meeting FNAL October 2006.
3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
6 Mar 2002Readout electronics1 CALICE: Status report Paul Dauncey, Imperial College for Birmingham, Cambridge Manchester, UCL Outline: CALICE and the ECAL.
CALICE-UK Status Marcel Stanitzki Rutherford Appleton Laboratory.
March 07, 2007 Anne-Marie Magnan, IC London 1 Update on digitisation procedure Study of dead width run on the GRID Anne-Marie Magnan Imperial College London.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard.
Remote Participation on ATF possibility and difficulty. Nobuhiro Terunuma KEK 4th TB and SGC meeting, Daresbury, 2007/5/29 6th ATF2 project meeting, WebEx,
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
 What is it??? Social media specifically for education  Why do I need it? Turning in assignments digitally Contact teacher after hours.
Tracking Group Overview Bruce Schumm SLAC Linear Collider Workshop January
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
The collaboration has been created in 2002 for 5 years > Developpment of the software for PFA > Design, construction of prototype to test with beam the.
EUROPE Nov 27 –Dec 10 November 27 - Dec 10.
CALICE meeting - ANL 1 I am sad to announce you that Vincent Lepeltier died this morning by heart attack He was a strong supporter of ILC in France Working.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Custom mechanical sensor support (left and below) allows up to six sensors to be stacked at precise positions relative to each other in beam The e+e- international.
Welcome to (MAP) 2014 winter meeting J.P.Delahaye MAP Collaboration (FNAL, May 31, 2014)1 SLAC: Dec 2-6,
Why Stories Don’t Succeed The Visual Story Network is a global community of visual storytellers leading a movement so everyone.
JAI Fest Welcome! JAI Fest meeting 10 Dec 2015 Andrei Seryi John Adams Institute for Accelerator Science.
CALICE Collaboration Meeting March 2013 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Hamburg/Germany March 2013.
Marcel Stanitzki Rutherford Appleton Laboratory
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Risk Assessments: Guidelines for Completing
Final CALICE OsC meeting: Status and summary of project
RMWEA - LIFT Affiliate Presentation
Test beams future plans - Discussion session-
Mark Palmer for the CESRTA Collaboration
Introductory remarks David Ward
Roger M. Jones The University of Manchester and Cockcroft Inst.
The Status of Beijing site, and CMS local DBS
PCORnet DRN OC Forum March 7, 2016.
LC Test Beam Activities
BPM development at ATF/CLIC
CALICE News The 2007 beam tests have started!
Oversea collaborators
Preparations for the SiD Workshop at Fermilab, April 9-11
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Lucie Linssen, CERN CLICdp meeting, May 15th 2017
Coupler kick and wake simulations upgrade
3. Februar 2006 Tobias Haas DESY
ILC Detector R&D in Japan
Please Fax or your Registration Form to GIA.
Update of the Detector Program for ILC Sakue Yamada March
VIII SiLC Meeting Santander-Spain, December 2008
ECAL electronics schedule
Agendas for Mrs. Green’s Classes
Beam Simulation at Cornell
ILC DR instability simulations
Beam RF Effects Update Mike Woods, SLAC
Rick Salcido Northern Illinois University For CALICE Collaboration
CesrTA Experimental Schedule and Priorities
Tuesday, March 6, 2018 Convention Center, 119B
Venepuncture 2017 The Academy, GWH 9 AM – 1.30 PM
Homework #1 Ecommerce web sites.
Michele Faucci Giannelli
ILC DR instability simulations
NHS Meeting 1/8/18 MLK Day of Service WILL BE a NHS service event. If you would like to participate you must sign up following the link below:
Homework #1 Business six drivers.
National Honor Society
Calice Tile-HCal and Tail-catcher/Muon Tracker
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Please Fax or your Registration Form to GIA.
Mrs. Eriksen’s Classroom News December 2015
Presentation transcript:

Upcoming CALICE meetings General, DESY, 7-8 Dec General, Northern Illinois University (~40 miles from FNAL), 14-16 March. This will be following a FNAL ~2 hour “seminar” on CALICE to attract new US collaborators Upcoming ILC meetings Simulation, DESY, 9-10 Dec LCWS05, SLAC, 18-22 March Upcoming LC-UK meeting Imperial, Tue 21 December We will need a “Status of CALICE” speaker Please check the collaboration names and send me updates http://www.hep.ph.imperial.ac.uk/calice/uk.txt We are hoping for first beam in DESY in Dec We will need people to do shifts and learn to operate the DAQ