Ã2 Post rack with brushed aluminum finish and round, threaded holes ã7 foot high design provides 45U (78.75 or 200cm) of equipment mounting space ãMade.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
1 Communication at R&M leads to the new generation Foccos R&M Foccos - The new rack line.
AP STUDY SESSION 2.
1
& dding ubtracting ractions.
Win Big AddingSubtractEven/Odd Rounding Patterns Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Last Chance.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Getting there in comfort
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Multiplication Facts Review. 6 x 4 = 24 5 x 5 = 25.
1 1  1 =.
Who Wants To Be A Millionaire?
The 5S numbers game..
7 | Means of Egress (Life Safety Code)
Break Time Remaining 10:00.
Factoring Quadratics — ax² + bx + c Topic
Matrix SYSTEM OVERVIEW
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
LINAC 4 Emittance Meter.
Aquariums, Stands and Canopies Review September 27th, 2012
Premium Wall Shelving & Storage Easy to Install – Tough to Beat Commercial.
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Telecommunication Rooms
PP Test Review Sections 6-1 to 6-6
Maths Trail. How many hanging baskets are there in the garden? 1.
MM4A6c: Apply the law of sines and the law of cosines.
Chapter 4 Estimating and Reducing Labor Costs
Is Proud to announce the creation of a new product The Phase Velocity RivMax THE BOLTLESS SHELVING SYSTEM Toll Free ~ Office
Filling and Wrapping Review Sheet
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
2.5 Using Linear Models   Month Temp º F 70 º F 75 º F 78 º F.
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Sets Sets © 2005 Richard A. Medeiros next Patterns.
When you see… Find the zeros You think….
Your universal enclosure. 159 LC  159 Cubic inches of space with a hinged lid  Made from all galvanized steel, powder coated white, with a rubber.
Kinematics Review.
Before Between After.
Slide R - 1 Copyright © 2009 Pearson Education, Inc. Publishing as Pearson Prentice Hall Active Learning Lecture Slides For use with Classroom Response.
25 seconds left…...
Subtraction: Adding UP
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Three wheel cargo bike assembly manual
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
PSSA Preparation.
& dding ubtracting ractions.
Physics for Scientists & Engineers, 3rd Edition
Completing the Square Topic
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Excel Environ Racks Simon Robinson. Ranges Sizes Features Environ v. formal surround; enclose.
Engineering Overview Presenter’s Name
Open Frame Racks & Accessories. 2 Application ‣ 2/4-Post Open Frame Racks combine the mounting security of a cabinet with the accessibility of a rack.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Classic Bundle a) (Any SX Rack + 2 Basic or metered PDU) = 10% Discount b) 5 x (Classic Bundle in the same Order) = 15% Discount Choose one of the 2 bundle.
171-SH SH Box with Pre-Installed 101⁄2" Pigtail Popular 4" square boxes and switch boxes Pre-installed 101⁄2" insulated grounding.
Mounting a BalanceBox®650 to a brick wall
Presentation transcript:

ã2 Post rack with brushed aluminum finish and round, threaded holes ã7 foot high design provides 45U (78.75 or 200cm) of equipment mounting space ãMade of high strength 6061-T6 structural grade aluminum ãMeets EIA-310-E standard for 19 racks with 5/8 x 5/8 x 1/2 alternating hole pattern ãSelf-squaring design allows for one man assembly without a level ãShips with qty 24 - #12-24 x ½ equipment mounting screws, two top angles, two bottom angles and rack assembly hardware AR Post Rack (Aluminum finish)

ã2 Post rack with black powder coat finish and round, threaded holes ã7 foot high design provides 45U (78.75 or 200cm) of equipment mounting space ãMade of high strength 6061-T6 structural grade aluminum ãMeets EIA-310-E standard for 19 racks with 5/8 x 5/8 x 1/2 alternating hole pattern ãSelf-squaring design allows for one man assembly without a level ãShips with qty 24 - #12-24 x ½ equipment mounting screws, two top angles, two bottom angles and rack assembly hardware AR Post Rack (Black finish)

ã4 Post Open Frame with black powder coat finish and round, threaded holes ã7 foot high design provides 45U (78.75 or 200cm) of equipment mounting space ãMade of high strength 6061-T6 structural grade aluminum ãMeets EIA-310-E standard for 19 racks with 5/8 x 5/8 x 1/2 alternating hole pattern ãAdjustable depth setting of (68- 81cm) ãSelf-squaring design allows for one man assembly without a level ãShips with qty 24 - #12-24 x ½ equipment mounting screws ãMust be bolted to floor to be stabilized AR Post Open Frame (Black finish)

ãThe Hardware Kit includes quantity black #12-24 x ½ pilot point equipment mounting screws ãFor configurations requiring more than the quantity 24 screws shipped with each 2 Post Rack and 4 Post Open Frame, the Hardware Kit provides the extra hardware required ãThese screws cannot be used on the NetShelter enclosures nor can NetShelter hardware be used on APCs 2 Post Rack AR8400 – Hardware Kit

ãThe 2U Blanking Panel adds a finished look to your configuration by covering up blank spaces ãEach Blanking Panel is made from 16 gauge steel and ships with mounting hardware AR8402 – 2U Blanking Panel

ãThe Light Duty Shelf is an all purpose shelf designed to handle equipment rated up to 50 lbs (22.7kg) ãThe solid shelf measure wide x 14 deep (43.8 x 35.6 cm) making it ideal for small monitors, modems or other light equipment ãThe shelf is made from 16 gauge steel, utilizes a front mounting design and ships with mounting hardware AR8420 – Light Duty Shelf

ãThe Heavy Duty Shelf is designed to support heavy equipment rated up to 150 lbs (68kg) ãMeasuring wide x deep (44 x 55cm), the Heavy Duty Shelf can support a wide variety of equipment ãFor mounting flexibility, this solid shelf can be mounted in three different positions ãThe shelf is made from 16 gauge steel and ships with mounting hardware AR841 – Heavy Duty Shelf

ãEach Horizontal Cable Organizer is ideal for easy routing of cables to eliminate congestion in a rack or between racks in a lineup ãEach Horizontal Cable Organizer comes with qty 4 integrated cable hoops ãEach Horizontal Cable Organizer is made from 16 gauge steel and ships with mounting hardware AR8425 – 1U Horizontal Cable Organizer AR8426 – 2U Horizontal Cable Organizer

ãThe 2U Patch Cord Organizer provides horizontal and vertical cable hoops for frontside cable management ãEach Cable Organizer comes with quantity 24 cable hoops for vertical routing and quantity 4 cable hoops for horizontal routing ãEach Cable Organizer is made from 16 gauge steel and ships with mounting hardware AR8427 – 2U Patch Cord Organizer

ãThe 3 Vertical Cable Organizer provides an excellent cable management for the full height of the 2 Post Rack or 4 Post Open Frame ãThe 3 Vertical Cable Organizer comes with quantity 7 large cable hoops for vertical routing of cables and quantity 7 pass-through holes ãThe 3 Cable Organizer is typically used with a single rack or at the end of a lineup of racks and can be mounted in the front or rear of the rack ãEach Cable Organizer is made from 16 gauge steel and ships with mounting hardware AR8440 – 3 Vertical Cable Organizer

ãThe 3 Vertical Cable Organizer provides an excellent cable management for the full height of the 2 Post Rack or 4 Post Open Frame ãThe 6Vertical Cable Organizer comes with quantity 7 large cable hoops for vertical routing of cables and quantity 7 pass-through holes ãThe 6 Cable Organizer is typically used between two configured racks and can be mounted in the front or rear of the rack ãEach Cable Organizer is made from 16 gauge steel and ships with mounting hardware AR8441 – 6 Vertical Cable Organizer

ãThe Vertical Organizer Control Brackets are used in conjunction with the Vertical Cable Organizers to provide cable containment in the rear of each Vertical Cable Organizer ãThe Vertical Organizer Control Brackets attach directly to the mounting holes on the 2 Post Rack or 4 Post Open Frame ãAR8445 is used with the 3 wide Vertical Cable Organizer at the end of a lineup ãAR8446 is used with the 6 wide Vertical Cable Organizer mounted between 2 racks ãQty 4 Black Control Brackets ship in each Kit AR8445 – 3 Vertical Organizer Control Bracket Kit AR8446 – 6 Vertical Organizer Control Bracket Kit