D11.2 – The Story Each test operator will test the system in different corridors in Europe. CP use one corridor, PI use another corridor, SIGMA has got.

Slides:



Advertisements
Similar presentations
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
Advertisements

1 © EURIDICE Consortium 2011 Intermodal Operator SeaRail SeaRail Oy – Berndt Ahlfors ECITL’11.
1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical.
System Construction and Implementation Objectives:
Paris, June Wagon management information flow on Slovenian Railways wagon ordering wagon maintenance.
WP3- Development: Milestone M3 Lisbon 30 January 2004 National Technical University of Athens.
SG EUROPEAN PHARMACEUTICAL PRICING NERVE CENTRE. ABOUT SIGYN R&D Sigyn R&D is a Croatian company based in Zagreb, established in Tailor made software.
Chapter 15 Design, Coding, and Testing. Copyright © 2005 Pearson Addison-Wesley. All rights reserved Design Document The next step in the Software.
Financial Management and Auditing First Level Controls 3 rd round operations Rostock, Elise Oukka.
1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH
Figure 6-1: Transport Request Data Entities: CS: Customer OM: Order manager OPM: Operational manager FM: Fleet Manager MM: Maintenance manager OBT: On.
Kranjska Gora, Installation – plan, delivery -PI installation on Slovenian Railways’ wagons: -3 Uacs -2 Himrrs -Delivery of OBTs and loading.
1 F - MAN Pool - Concept - Dipl.-Ing. Eckhard Kuhla Project Manager EKonsult GmbH
Crete Meeting April 10 th – 11 st, 2003 WP3 Sciro Presentation.
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
Kranjska Gora, Test plan - PI will test F-MAN tools on: - 2 types of wagons (Uacs, Himrrs) - 2 types of operation (timetable supervision.
System Implementation
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
© Copyright 2003, Binomial International Inc. Phoenix Business Continuity and Disaster Recovery Planning Software Recovery Planning Software Tools Recovery.
Introduction to Information System Development.
HCL CONFIDENTIAL 1 Smart Engineer Review Date: 12 th July, 2005.
Condor Technology Solutions, Inc. Grace RFTS Application Extension Phase.
Computers & Employment By Andrew Attard and Stephen Calleja.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
40m OAN telescope. First experience with ACS Observatorio Astronómico Nacional P. de Vicente, R. BolañoMarch 2004.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Presentation by SNCF in 19/20 April 2004 Meeting in Kranjska.
End HomeWelcome! The Software Development Process.
3rd NRC Meeting, 9-12 June 2008, Windsor ICCS 2009 Main Survey Field Operations.
THE PRACTICUM AND THE MASTER'S PAPER. April 11, 2014.
Human Computer Interaction
Kick Off Meeting June WP6: Overview WP Leader: Province of Asti (in close collaboration with iMpronta) Importance of monitoring and evaluation:
© Copyright 2011 John Wiley & Sons, Inc.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
© Mahindra Satyam 2009 Configuration Management QMS Training.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Report on TTonT By: Jan Rozema. Contents Historical overview Status (at PFAC-02) Terms of Reference How to go onward.
Data Management Seminar, 8-11th July 2008, Hamburg 1 ICCS 2009 – On-line Data Collection in the Main Survey.
Estimation of emigration flows by using immigration figures in receiving countries Michel POULAIN GéDAP UCL Belgium.
Metadata By N.Gopinath AP/CSE Metadata and it’s role in the lifecycle. The collection, maintenance, and deployment of metadata Metadata and tool integration.
- EADS Astrium Proprietary & Confidential EADS Astrium Proprietary & Confidential - 05/07/2006, Rhodes Rural Wings Ariane Muller & Laurent Thomasson.
Bina Nusantara 19 C H A P T E R SYSTEM CONSTRUCTION AND IMPLEMENTATION.
EVA Leonardo Project Synthesis of Intermediate Results February 2011 mettre logo europe.
Extending ICT Research Co-operation between the European Union, Eastern Europe and the Southern Caucasus EECA FP7 Help-Desk EXTEND Training Workshop Baku,
GROUP PresentsPresents. WEB CRAWLER A visualization of links in the World Wide Web Software Engineering C Semester Two Massey University - Palmerston.
Lisbon, Report on OBT installations -50 OBTs and sensors to be installed on wagons: - 35 CP (sggmrss – flat wagon with 102 ton cargo capacity)
Presentation to the Ad-hoc Joint Sub-Committee on Parliamentary Oversight and Accountability Wednesday 20 March 2002 PUBLIC SERVICE MONITORING AND EVALUATION.
SAP R/3 User Administration1. 2 User administration in a productive environment is an ongoing process of creating, deleting, changing, and monitoring.
RAILDATA Centralbahnstr. 6, CH – 4051 Basel Wagon and Consignment Tracking Petr Červinka, CDC.
ΑΝΝΕΧ 10 by EK. Rail Operators‘ Group (1) 1.Background F-Man Cargo operators: FS, CP, SZ. Their responsibilities: - to define their needs for a F-Man.
09/02/2018 6th ERA TAF TSI Regional Workshop (EE, LT, LV, PL) The Content of TAF TSI   ERA Telematics Team Warsaw September 2017.
PRESENTATION OF MONTENEGRO
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Chapter 6: Database Project Management
Support 2001.
Systems Analysis and Design
CHAPTER 2 Testing Throughout the Software Life Cycle
Engineering Processes
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Item 6.1 COICOP revision Conclusions: The Working Group participants generally agreed with the proposed new structure for COICOP with some reservations.
Systems Construction and Implementation
System Construction and Implementation
Systems Construction and Implementation
Point 6. Eurostat plans for Time Use Survey data processing and dissemination Working Group on Time Use Surveys 10 April 2013.
The Estonian experience with ex-ante evaluation – set-up and progress
«Data exchange in bovine identification database BOVEX»
Comparison of key parameters of EU WLTP database and WLTC version 5
Item 5 Modernisation of the EU-SILC Production
Presentation transcript:

D11.2 – The Story Each test operator will test the system in different corridors in Europe. CP use one corridor, PI use another corridor, SIGMA has got two different tests sites and so two corridors. In particular, the corridor used by CP connects Portugal with Spain, the one used by PI connects Slovenia (Nova Gorica) with Bosnia-Herzegovina (Maglaj) through Croatia, whereas the former corridor used by SIGMA connects France with Italy and the latter goes through France, Germany, Denmark and Sweden. In Figure 2-7 it is possible to see the European areas where the F-MAN system will operate.

D11.2 – The Corridor (CP)

D11.2 – The Corridor (SNCF)

D11.2 – The Verification Phases The verification methodology: 2 distinct phases: 1- The testing of the proper functioning of each separate module (AMM, DPM, TT and GUI) from January to April 2004 (not yet written in D11.2) 2- The testing of the overall F-MAN system after the OBT installation from May to September 2004 (written in D11.2)

D11.2 – Verification after Installation (2) The tests have been designed to be applicable to the type of services supported by the equipped wagons: -In CP case the test used mainly TimeTable Supervision Mode because the intermodal chain that uses flat wagons has usually the need for a contractually agreed delivery time for the specific client UTI (Intermodal Transport Unit, e.g. container) after departure, with checkpoints (~5 per trip). The delay of the wagon is useful both to the order and the fleet managers. Bid and offer simulation and partial automatic load/unload monitoring were also important; -In SIGMA case the test used mainly Status Supervision Mode because the full wagon transport services usually need to maintain a stable flow of goods (e.g. steel) to manage stocks and not a specific wagon. The delay of the specific wagon is more useful to the fleet management. Full wagon fleet load/unload monitoring is also important. - In PI case the test is similar to CP and used mainly TimeTable Supervision Mode because the full wagon transport services usually need to maintain a stable flow of goods (e.g. paper) to manage stocks and not a specific wagon. In this case there are also specific checkpoints (all the stations in the itinerary). The delay of the specific wagon is more useful to the fleet management. Full fleet wagon load/unload monitoring is also necessary.

- In CP case the users (order manager, fleet manager, operational manager, maintence manager) are existing personnel in the freight department (centralised control of operations) supported by CP F-MAN team. The users interact with the F- MAN tools from the EQ of the Freight Business Unit and the I&D department in Lisbon. CP Fleet management as three main levels of responsibility (from left to right) with Fleet Management responsible and their two main tasks – Wagon Status and Train/Wagon Tracking and Tracing. This is the main support for F-MAN tests. D11.2 – The Real Users (CP)

D11.2 – The Real Users (SNCF) In SIGMA case the possible users are existing SNCF fleet managers and SIGMA F-Man team in Place St Lazare Station in Paris from the Business Unit PCA : Coal and Steel Products

D11.2 – The Real Users (PI) In PI case the user are existing SZ fleet managers and PI F-Man team on Ljubljana

D11.2 – The Resources Wagons: -CP tested F-MAN tools with 30 Sggmrss flat Wagons for both types of operation modes -SIGMA tested F-MAN tools with 10 wagons (8 S56 and 2 S58) wagons for status supervision mode - PI tested F-MAN tools with 5 wagons for 2 types of operation modes (timetable supervision – 3 Uacs, status supervision – 2 Himrrs)

D11.2 – The Verification Procedure -Both CP and PI are using the same complete procedure - SNCF is using a subset of the procedure for wagon status - We can consider that exists comparability between the test results

D11.2 – The Verification Procedure PI example The operator as been assisted by ISUP (SZ IS for traffic management) and Hermes (international based IS for wagon management) information to check status data from F-MAN wagons within a specified procedure: -Control of timetable supervision mode on corridor Koper tovorna – Treibach-Althofen including ETA (check ISUP, Hermes) -Control of wagon status data (check ISUP, Hermes, phone calls) -Calculation of exploitation indicators for freight wagons (check F-MAN database extraction; result: XLS tables post processing) -Report tables (check F-MAN DB extractions; result: XLS tables on wagon history, timetable and ETA performance) - Software presentations and survey on users attitude about F-MAN tools, interface

D11.2 – The Verification Procedure National Information Hermes query result for wagon (international information) All the tests use extensively railway classical IT to verify F-MAN data (CP- TrainOffice and Hermes; PI – ISUP and Hermes; SNCF)

Timetable supervision mode (included in CP and PI tests) In timetable supervision mode the PI operator as been assisted by ISUP and Hermes information to check status data (for 3 wagons) from F-MAN wagons within a specified Procedure: - PI operator piom will check the information in the ISUP and Hermes; - Upon the information piom will place an order to AMM - PI operator pifm will assign the wagons to the order complying with the AMM procedure - Upon the information of the movement (AMM and DPM) and information form ISUP and Hermes piopm will assign the appropriate timetable to the wagon and send it to OBT - piopm will sporadically check the information in the F-MAN system to the ISUP and Hermes IS - piopm will note his observations and react to the alerts; -AMM and DPM administrators need to provide F-MAN DB extractions on periodically basis (2 weeks) SITUATION: CP AND PI were not able to verify this mode due to unavailability in F-MAN tools D11.2 – The Verification Procedure PI example

Status supervision mode (included in CP, PI and SIGMA tests) In status supervision mode the PI operator as been assisted by ISUP and Hermes information to check status data (for all five wagons) from F-MAN wagons within a specified Procedure: - Check of wagon position; - Comparison of data with ISUP and Hermes and phone calls; - Response to alerts raised by F-MAN tools; - Entering special states (maintenance, damage,...); - Report on functionality of the tool (suggestion of enhancements); -Recording of special observations. -SITUATION: CP, PI, and SIGMA have been able to verify this mode BUT they have not yet produce EVIDENCE to include in D11.2 -EVIDENCE: Reporting Tables (made by the users) and F-MAN Database Extractions from DPM D11.2 – The Verification Procedure PI example

D11.2 – The Tables Wagon based report (status supervision mode) CP SITUATION: IN TWO MONTHS only 9 days of usable DPM processing. Tables will be completed based on existing systems PI AND SIGMA: State their situation

D11.2 – The Tables Corridor based report (timetable mode) CP SITUATION: no usable data. Tables will be completed based on existing systems PI AND SIGMA: State their situation

Exploitation indicators of wagons - Speed indicators - Inequality analysis - Time-based productivity -Distance-based productivity -SITUATION: CP No indicators have been produced yet -PI and SIGMA: State their situation D11.2 – The Indicators

D11.2 – The DELIVERABLE Contributions to the function and constrainst tables: -PI as produced a first version of D11.2 with remarks on part of the tables (funtions and constrains) based on its experience and information availability -SIGMA is analysing Primoz work and will deliver remarks on the tables (functions and constrains) for its test part -CP as analysed Primoz work and accepted as the only existing information (The users have been exposed to the tools in last two weeks - before we had no information on DPM). Carlos is preparing CP own remarks based on its opinion)

D11.2 – The DELIVERABLE Contributions to the verification story: - Last two months have been incredible rich in terms of problems and stability in F-MAN tools with the test partners trying to get evidence to produce data and to be able to involve the real users - In practical terms we continued for at least one and half month since the end of July (after deciding that no more developments would be accepted by the involved partners) debugging the tool. Something that was supposed to be finished on July. The availability of the system for real users as been poor (but questionnaires have been finished without problems) - On the midle of August Carlos talked to Mr. Kuhla about the possibility to delay the test phase. Both agreed that it was not acceptable taking in account our situation facing the EC - After some information exchange with the partners Carlos decided to ask for contributions from the partners to finish the D11.2 document at any cost. The partners have correspond very well to the demand and the document is present (thanks for Andrea and its structuring ideas)

D11.2 – Some Questions to finish The need to garantie that at least PI is able to test timetable mode until October and finish the good work already done Evaluation by the partners of the contents related to their contributions Need some good contribution for Chapter 5 – First phase of test plan methodology (January-May 2004) Also for Fine tuning and improvements of Centralised SMS Hub, DPM and AMM starting from the users needs The delivery will be enriched with a critical review of each point (e.g. the energy consumption situation – CP as already review the parameters as you can see in the delivery to be able to maintain the OBTs alive for at leat one ear) and the conclusions for future development. For example the old war between a more stupid or a more intelligent OBT options can now be answered. The need to verify the compliance of the answers in the tables in relation with EU perspective