Spring 2008, King Saud University Arrow Diagramming Dr. Khalid Al-Gahtani 1 Network Schedule Predominant Network Scheduling Techniques: –Critical Path.
Precedence Diagramming
Lecture 4 – PERT Diagrams & CPM
WBS: Lowest level OBS: Lowest level
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Associate Professor MIS Department UNLV
Chapter 6: Developing a Project Plan
Chapter 17 Project Management McGraw-Hill/Irwin
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
Finding the Critical Path
1 1 Slide © 2006 Thomson South-Western. All Rights Reserved. Slides prepared by JOHN LOUCKS St. Edwards University.
Chapter 13 Project Scheduling: PERT/CPM
Chapter 9 Project Scheduling: PERT/CPM
Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects. Use.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
Systems Analysis and Design with UML Version 2.0, Second Edition
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 13 Supplement Roberta.
Accounting Principles, Ninth Edition
Introduction to Management Science
© Copyright 2011 John Wiley & Sons, Inc.
Operations Management Session 27: Project Management.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Scheduling the Project
MEM 612 Project Management Chapter 5 Scheduling the Project.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
MGMT 483 Week 8 Scheduling.
Project Management: A Managerial Approach 4/e
Chapter 9 Project Management.
Operations and Supply Chain Management, 8th Edition
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Roberta Russell & Bernard W. Taylor, III
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management in Practice Fourth Edition
OPERATIONS MANAGEMENT for MBAs Fourth Edition
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management © Wiley 2007.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Project Management OPIM 310.
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Reid & Sanders, Operations Management © Wiley 2002 Project Management 17 C H A P T E R.
© Wiley 2010 Chapter 16 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 6 th Edition Chapter.
Project Management (專案管理)
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.4-1.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
In Chapter 5: Scheduling the Project From Action Plan and WBS to Gantt chart and project network.  Gantt Chart  Project Network  Activity-on-arrow 
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976.
Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
MEM 612 Project Management Chapter 6 Allocating Resources to the Project.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.1-1.
Project Management in Practice
MEM 612 Project Management Chapter 5 Scheduling the Project.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
Beni Asllani University of Tennessee at Chattanooga
Information Technology Project Management
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Project Management: A Managerial Approach
Presentation transcript:

Project Management in Practice, Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University Copyright 2011 John Wiley & Sons, Inc. 5-1 Mantel, Meredith, Shafer, and Sutton John Wiley and Sons, Inc.

PERT and CPM Copyright 2011 John Wiley & Sons, Inc. 5-2 Program Evaluation and Review Technique (PERT) U.S. Navy, Booz-Allen Hamilton, and Lockheed Aircraft probabilistic activity durations Critical Path Method (CPM) Dupont De Nemours Inc. deterministic activity durations

The Language of PERT/CPM Copyright 2011 John Wiley & Sons, Inc. 5-3 Activity a task or set of tasks uses resources and time Event an identifiable state resulting from completion of one or more activities consumes no resources or time predecessor activities must be completed

The Language of PERT/CPM continued Copyright 2011 John Wiley & Sons, Inc. 5-4 Milestones identifiable and noteworthy events that mark significant progress Network a diagram of nodes (activities or events) and arrows (directional arcs) that illustrate the technological relationships of activities Path a series of connected activities between two events

The Language of PERT/CPM concluded Copyright 2011 John Wiley & Sons, Inc. 5-5 Critical Path the set of activities on a path (from the projects start event to its finish event) that, if delayed, will delay the completion date of the project Critical Time the time required to complete all activities on the critical path

Building the Network Copyright 2011 John Wiley & Sons, Inc. 5-6 There are two ways of displaying a project network Activities on Arrows (AOA) network … in which the activities are shown as arrows and events as nodes Activities on Nodes (AON) network … in which each task is shown as a node and the technological relationship is shown by the arrows

AON Network Stage 1 Copyright 2011 John Wiley & Sons, Inc. 5-7

AON Network - Stage 2 Copyright 2011 John Wiley & Sons, Inc. 5-8

AON Network - Complete Copyright 2011 John Wiley & Sons, Inc. 5-9

AOA Network – Stage 1 Copyright 2011 John Wiley & Sons, Inc. 5-10

AOA network – Stage 2 Copyright 2011 John Wiley & Sons, Inc. 5-11

AOA Network - Complete Copyright 2011 John Wiley & Sons, Inc. 5-12

AOA Network – Showing The Use of a Dummy Task Copyright 2011 John Wiley & Sons, Inc. 5-13

Information Contents in an AON Node Copyright 2011 John Wiley & Sons, Inc ESEF ES - Earliest start time EF - Earliest finish time LS - Latest start time LF - Latest finish time LSLF ActivityActivity nameduration

Calculating Activity Slack Copyright 2011 John Wiley & Sons, Inc Latest Start Time (LS) – Earliest Start Time (ES) = Slack Latest Finish time (LF) – Earliest Finish time (EF) = Slack

Calculating Probabilistic Activity Times Copyright 2011 John Wiley & Sons, Inc The expected time (T E ) is based on three time estimates PESSIMISTIC (A) MOST LIKELY (M) OPTIMISTIC (B)

The Statistical Distribution of all Possible Times for an Activity Copyright 2011 John Wiley & Sons, Inc. 5-17

Activity Expected Time and Variance Copyright 2011 John Wiley & Sons, Inc. 5-18

95 Percent Level Copyright 2011 John Wiley & Sons, Inc Task will be a or lower 5 percent of the time Task will be b or greater 5 percent of the time

90 Percent Level Copyright 2011 John Wiley & Sons, Inc Task will be a or lower 10 percent of the time Task will be b or greater 10 percent of the time

The Probability of Completing the Project on Time Copyright 2011 John Wiley & Sons, Inc =NORMDIST( D,,,TRUE) Note: NORMDIST is a function within Excel when using the spreadsheet method

Selecting Risk and Finding D Copyright 2011 John Wiley & Sons, Inc NORMINV(probability,,,TRUE) Note: NORMMINV is a function within Excel when using the spreadsheet method

Traditional Statistics Versus Simulations Copyright 2011 John Wiley & Sons, Inc Similarity both procedures assume that task durations are statistically independent and the paths are independent Difference a simulation can circumvent the assumption of statistical independence by including the activity or path dependencies as part of the model

Gantt Chart of a Sample Project Copyright 2011 John Wiley & Sons, Inc. 5-24

Gantt Chart of Sample Project Showing Critical Path, Path Connections, Slack, ES, LS, EF, and LF Copyright 2011 John Wiley & Sons, Inc. 5-25

Extensions to PERT/CPM Copyright 2011 John Wiley & Sons, Inc Finish to Start (F to S) finish of Activity A to start of Activity B Start to Start (S to S) start of Activity A to start of Activity B Finish to Finish (F to F) finish of Activity A to finish of Activity B Start to Finish (S to F) start of Activity A to finish of Activity B

Precedence Diagramming Conventions Copyright 2011 John Wiley & Sons, Inc. 5-27

Copyright Copyright 2011 John Wiley & Sons, Inc Copyright John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976 United States Copyright Act without express permission of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back- up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information herein.