Damping Ring parameters for the new accelerating structure

Slides:



Advertisements
Similar presentations
Bunch compressors ILC Accelerator School May Eun-San Kim Kyungpook National University.
Advertisements

Compact Linear Collider. Overview The aim of the CLIC study is to investigate the feasibility of a high luminosity linear e-/e+ collider with a centre.
Electron-cloud instability in the CLIC damping ring for positrons H. Bartosik, G. Iadarola, Y. Papaphilippou, G. Rumolo TWIICE workshop, TWIICE.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Impedance measurements at SLS E. Koukovini-Platia CERN, EPFL TIARA mid-term meeting, Madrid, 13 th June 2012 Many thanks to M. Dehler, N. Milas, A. Streun.
16 th June 2008 POSIPOL 2008L. Rinolfi / CERN CLIC e + sources status L. Rinolfi with contributions from F. Antoniou, H. Braun, A. Latina, Y. Papaphilippou,
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
CLIC Pre-damping rings overview F. Antoniou, Y. Papaphilippou CLIC Workshop 2009.
Frank Zimmermann, CLIC “Away Day” 28 March 2006  x * Limitations and Improvements Paths Damping Rings Maxim Korostelev, Frank Zimmermann.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Comparison between NLC, ILC and CLIC Damping Ring parameters May 8 th, 2007 CLIC Parameter working group Y. Papaphilippou.
Update of 3.2 km ILC DR design (DMC3) Dou Wang, Jie Gao, Gang Xu, Yiwei Wang (IHEP) IWLC2010 Monday 18 October - Friday 22 October 2010 Geneva, Switzerland.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Lattice design for IBS dominated beams August th, 2007 Yannis PAPAPHILIPPOU IBS ’07 – Intra Beam Scattering mini workshop, The Cockcroft Institute,
Permanent magnet wiggler based on NdFeB material. This wiggler type uses the same design principles as the wigglers which have been developed for PETRA.
1 Simulations of fast-ion instability in ILC damping ring 12 April ECLOUD 07 workshop Eun-San Kim (KNU) Kazuhito Ohmi (KEK)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Preliminary results on simulation of fast-ion instability at 3 km LBNL damping ring 21 April 2005 Pohang Accelerator Laboratory Eun-San Kim.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
Emittance reduction by a SC wiggler in the ATF-DR September 16 th, 2009 Yannis PAPAPHILIPPOU and Rogelio TOMAS ATF2 weekly meeting.
Parameter scan for the CLIC damping rings July 23rd, 2008 Y. Papaphilippou Thanks to H. Braun, M. Korostelev and D. Schulte.
Injection System Update S. Guiducci (LNF) XVII SuperB Workshop La Biodola, Isola d'Elba, May 29 th 5/29/111.
T. Demma (INFN-LNF) In collaboration with: M. Boscolo (INFN-LNF) A. Chao, M.T.F. Pivi (SLAC). Macroparticle simulation of IBS in SuperB.
IntraBeam Scattering Calculation T. Demma, S. Guiducci SuperB Workshop LAL, 17 February 09.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
Compton stacking ring update
Space charge studies at the SPS
Electron Cooling Simulation For JLEIC
CLIC Damping ring beam transfer systems
Linac possibilities for a Super-B
Non linear optimization of the CLIC pre-damping rings
Discussion on Emittance Evolution through FCC-e+e-
IntraBeam Scattering Calculation
sx* Limitations and Improvements Paths
Luminosity Optimization for FCC-ee: recent results
CLIC damping rings overview
Update of Damping Ring parameters
E-cloud instability at CESR TA
Overview Multi Bunch Beam Dynamics at XFEL
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
ANKA Seminar Ultra-low emittance for the CLIC damping rings using super-conducting wigglers Yannis PAPAPHILIPPOU October 8th, 2007.
CEPC Injector Damping Ring
LHC (SSC) Byung Yunn CASA.
CLIC damping rings overview and open issues
ILC 3.2 km DR design based on FODO lattice (DMC3)
CLIC damping rings overview and open issues
ILC 3.2 km DR design based on FODO lattice (DMC3)
Damping Ring parameters for the new accelerating structure
Status of CTC activities for the Damping rings
F. Antoniou, E. Gazis (NTUA, CERN) and Y. Papaphilippou (CERN)
Non linear optimization of the CLIC pre-damping rings
CEPC APDR SRF considerations(4) -LEP Cavity Voltage &BBU
Low Energy Electron-Ion Collision
E.Bulyak, P.Gladkikh, M.Kuriki, T.Omori, L.Rinolfi,
PSB magnetic cycle 900 ms MeV to 2 GeV
Proposal for a CESR Damping Ring Test Facility
Kicker and RF systems for Damping Rings
ANKA Seminar Ultra-low emittance for the CLIC damping rings using super-conducting wigglers Yannis PAPAPHILIPPOU October 8th, 2007.
Kicker specifications for Damping Rings
Damping Ring parameters with reduced bunch charge
Update on ERL Cooler Design Studies
Evaluation of 1GHz vs 2GHz RF frequency in the damping rings
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
3.2 km FODO lattice for 10 Hz operation (DMC4)
Presentation transcript:

Damping Ring parameters for the new accelerating structure CLIC Parameter working group Damping Ring parameters for the new accelerating structure Y. Papaphilippou October 2nd, 2007

New parameters from CLIC_G structure Bunch population 3.72x109+10%=4.1x109 (vs. 4x109+10%= 4.4x109) Small impact in transverse emittance (mostly horizontal) Bunch spacing of 6 RF cycles, i.e. 0.5ns (vs. 0.667ns) RF frequency of 2GHz (vs.1.5GHz) e--cloud effects become more severe Number of bunches in roughly the same (312 vs. 311) 13% of the ring circumference filed The repetition rate is unchanged The store time remains comfortably long (20ms) Longitudinal emittance kept below 5000eV.m to fit bunch compressor requirements 02/10/2007 CLIC PWG Y. Papaphilippou

CLIC PWG, Y. Papaphilippou Bunch charge The horizontal normalized emittance scales as The above relationship is even more exact when the longitudinal emittance is kept constant Vertical and longitudinal emittance are weakly dependent on bunch charge, and almost linear with each other 02/10/2007 CLIC PWG, Y. Papaphilippou 3 3

Damping rings’ parameter evolution 2005 2006a 2006b 2007a 2007b 2007c energy [GeV] 2.424 circumference [m] 360 365.2 bunch population [E+09] 2.56+5% 5.20+5% 4.00+10% 3.70+10% bunch spacing [ns] 0.533 0.667 0.500 number of bunches/train 110 311 312 number of trains 4 1 store time/train [ms] 13.3 20 rms bunch length [mm] 1.55 1.51 1.59 1.49 1.53 rms momentum spread [%] 0.126 0.136 0.130 0.138 0.135 0.134 hor. normalized emittance [nm] 540 380 308 455 395 381 ver. normalized emittance [nm] 3.4 2.4 3.9 4.4 4.2 4.1 lon. normalized emittance [eV.m] 4725 5000 4982 4998 4993 4996 (horizontal, vertical) tunes (69.82, 34.86) (69.82, 33.80) coupling [%] 0.6 0.13 ver. dispersion invariant [μm] 0.248 wiggler field [T] 1.7 2.5 wiggler period [cm] 10 5 energy loss/turn [MeV] 2.074 3.903 hor./ver./lon./ damping times [ms] 2.8/2.8/1.4 1.5/1.5/0.75 RF Voltage [MV] 2.39 4.25 4.185 4.345 4.280 4.115 number of RF cycles 2 repetition rate [Hz] 150 50 RF frequency [GHz] 1.875 1.499 2.00 2005: original ring 2006a: super-conducting wiggler considered 2006b: vertical dispersion included 2007a: 12GHz structure 2007b: reduced bunch population 2007c: CLIC_G structure CLIC PWG Y. Papaphilippou