Status report MEG DC 20/6/06 Test in COBRA Hajime,Matthias,Johny Peter : beam, Wataru : COBRA Necessary Modifications in DC construction Conclusions and schedule 23/07/2019 DC Report
23/07/2019 DC Report
23/07/2019 DC Report
23/07/2019 DC Report
23/07/2019 DC Report
23/07/2019 DC Report
23/07/2019 DC Report
23/07/2019 DC Report
23/07/2019 DC Report
23/07/2019 DC Report
33 : DRS 50 : Accelerator 80+ n*16: VME + ? 23/07/2019 DC Report
23/07/2019 DC Report
23/07/2019 DC Report
23/07/2019 DC Report
23/07/2019 DC Report
23/07/2019 DC Report
Wire 0 (short, low rate) Wire 4 (middle) Wire 8( long, high rate, frame near beam) HV 1500 1600 1800 1900 2000 23/07/2019 DC Report
23/07/2019 DC Report
23/07/2019 DC Report
DC Construction DC test in COBRA e+ efficiently seen by real DC high pulses „rare“ for DC, effects to be studied in „DRS“ Intensity is large, aging effects have to be taken in account in optimization specific beam-COBRA electronic noise not very important DC Construction Carbon fiber gluing : 2 sets Cathode-Hood not correctly glued set of tests to be sure that error is completely understood Andrei+Nicolai back production restarted HV Dark current and mini-sparking : first amelioration not enough efficient started systematic study after beam-COBRA test and group complete all existent anodes tested in air at 1000 V, with anode preamps from bare anodes to “complete chambers” with cathodes and hood without foils [ first results : 6 nA on 1 Side HV capacitors from total 25 nA] partial redesign of anode prints and isolator to facilitate a cleaner tight gluing ~10 days delay 23/07/2019 DC Report
DC Test Other components With dummy bag too slow changes only to test Pressure stabilization: build second aquarium 64-96 DRS channels DC test tool VME electronic noise to be optimized Other components DC support : cable duct ( panels) Cable label printer Pump, preamp, panel,… 23/07/2019 DC Report
Anode Conclude study of noise Redesign Prints and isolators Hood and Cathode Optimize production Goal : DC production and installation -> middle August : Calibration -> in pM(N) –beam (number of DRS ?) -> > 2 weeks ? 23/07/2019 DC Report