P08027: Winter Quarter Schedule Week 1: Submit IRB test request Week 4: Completion of IRB Test GUI Week 6: Begin IRB testing MSD 2: Prototype Construction.

Slides:



Advertisements
Similar presentations
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Advertisements

PERMIT INTAKE Applicant is greeted by permit staff Permit staff determines nature of permit, assists in gathering forms, and begins calling necessary staff.
The Re-Start Meeting Warren County School Strategic Planning Process Action Team Leaders September 25, 2013.
Ch-11 Project Execution and Termination. System Testing This involves two different phases with two different outputs First phase is system test planning.
Requirements Specification and Management
The Lifecycle of an IRB Protocol in KC
System Testing 2  Effective March 3, 2014, new requirements for system testing were implemented  State Agencies are now required to provide to FNS:
Project leader: Benjamin Danziger, EE Todd Bentley, ISE Jim Corcoran, CE Jay Radhakrishnan, EE Peter Drexel, EE Vianna Mullar, EE.
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
Slide 1 INTRODUCTION Chapter 1. Slide 2 Key Ideas The primarily goal of a system is to create value for the organization. Many failed systems were abandoned.
GAI Proprietary Information
Wireless Assistive Control System: P08027 Theory This project was commissioned by the Electrical Engineering department as a demonstration tool for future.
RIT Senior Design I, Project Review P07310: Electronic Shifted Manual Transmission George Slack Team Guide Jason BotterillTeam Leader, Mechanical Engineer.
Automatic Home Medication Dispenser Project # P07009 Team Guide - Dr. Daniel Phillips Project Sponsor - Dr. Michel Berg Team Members Alan StrandburgChris.
P09311: Interface for Multi-Purpose Driver/Data Acquisition System Adam Van FleetProject Leader, EE DAQ Hardware Development David HoweElectrical Engineer.
MSD-II Project Review Modular Motion Tracking Sensors 1.
System Development Life Cycle (SDLC)
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
P08009 Audible Memo Board Phase II Monday, October 22, 2007 P08009: Audible Memo Board Phase II Sponsor: Tala Hopkins Jon GosligaAudio Output Lead Loic.
How the Change Control Process Affects Project Quality
Leading Edge Climbing Equipment
Effective Methods for Software and Systems Integration
Project Management Process Overview
PMP® Exam Preparation Course
Implementation & Integration Phase Implementation, then integration: Implementation, then integration:  Each module is implemented by member of programmer.
Chapter 2 The process Process, Methods, and Tools
What is an Inventory Program for? Dr. Emilio Moceo Ph.D Director of Studies Meet international obligations and expectations Inform international, national,
Software Process Guidelines VIETTEL Corporation. CONTENTS I.Standard folder structure II.Review Process III.Data Repository IV.Naming Convention 2.
End HomeWelcome! The Software Development Process.
Software Development Process and Management (or how to be officious and unpopular)
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
CS 3610: Software Engineering – Fall 2009 Dr. Hisham Haddad – CSIS Dept. Chapter 2 The Software Process Discussion of the Software Process: Process Framework,
Software Development Cycle What is Software? Instructions (computer programs) that when executed provide desired function and performance Data structures.
Project Management Models
Digital Signal Processing Jill, Jon, Kilo, Roger Spring ‘06.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
Prototyping By: Michael McBee & Shere Stewart. Prototyping What is Prototyping? It is an iterative process involving analysts and users where a model.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Class-D Garage Band Amplifier Team: Aaron Danielson, Robert Mann, Randall Newcomb, Scott Russell Sponsor: Nigel Thompson Advisor: Dr. William Harrison.
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
Food Preservation Challenge The Science Behind Food Preservation Unit.
Making Improvements Improve Kaizen Facilitation. Objectives Identify characteristics of a Pilot Test / Run Describe 5 phases for a Pilot Test / Run 
Control System Design Process Planning Documentation.
Attendance Application Faculty Sponsor Dr. William Shoaff Gerard Weber Ebrahim Almazrouei Alex Gonzalez Constantine Lopez.
P08311: FPGA Based multi-purpose driver / data acquisition system Sponsor: Dr. Marcin Lukowiak Team MemberDisciplineRole Andrew FitzgeraldCEProject Manager/FPGA.
MSD II Week 6 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
PI2134 Software Engineering IT Telkom.  Layered technology  Software Process  Generic Process (by Pressman)  Fundamental activities (by Sommerville)
BPMN. Loan Request Process  The Loan Request Process handles the necessary activities to receive, analyze and approve loan applications submitted by.
What has been accomplished at the end of MSD 1 & 2?
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
WEB 237 Week 5 Learning Team Finalized Paper Only Submit the eCommerce analysis paper and prototype Check this A+ tutorial guideline at
BSA 385 Week 4 Individual Assignment Frequent Shopper Program Part 3 For the items specified in the technical architecture document developed for the Frequent.
SCT Project Management Issues
Systems Analysis and Design
System Development Life Cycle (SDLC)
System Development Life Cycle (SDLC)
CPMGT 300 Competitive Success/snaptutorial.com
CPMGT 300 STUDY Lessons in Excellence--cpmgt300study.com.
CPMGT 300 Education for Service/snaptutorial.com.
CPMGT 300 Teaching Effectively-- snaptutorial.com.

AGREEMENTS OFFICE Support Agreement (SA) Process
System Development Life Cycle (SDLC)
HART Technologies Process Overview

SD5906 Globalization in New Media Design and Technology
Non-Transcranial Electroanesthesia Device

May is Coming !!! January 31st: Project approval (16 days from now) • Brainstorming, team formation, successful RFA February 7th: Project proposal (+7.
Presentation transcript:

P08027: Winter Quarter Schedule Week 1: Submit IRB test request Week 4: Completion of IRB Test GUI Week 6: Begin IRB testing MSD 2: Prototype Construction Winter QuarterSpring Quarter 14 6 MSD 2

P08027: MSD2 Schedule Week 1: Initial Prototype Construction Week 4: IRB Study Complete Week 5: Initial System Tests complete, Begin System wide testing Documentation Started. Week 6+: Testing and Refinement Finish Documentation Prototype ConstructionTesting 54 Week 3: Individual System tests complete

Week 1 Construct Electrode Strap and sleeve prototypes. Week 2 Finish construction and begin testing. MSD II FLOWCHART P08027: TODD B. Week 3 Resume testing of Strap/Sleeve and modify as necessary. Week 4 Resume testing of Strap/Sleeve and modify as necessary. Week 5 Determine which design is better - sleeve or strap Week 6 Build two prototypes of final, customer approved design Week 7 Resume testing of device and modify as necessary. Week 8 Formal Paper/Poster and documentation Week 9 Formal Paper/Poster Week 10 Formal Paper/Poster Week 11 Present project.

Week 1 Develop Signal Processing for HW Continue IRB Week 2 Continue to develop Program Finish IRB MSD II FLOWCHART P08027: VIANNA M. Week 3 Implement signal processing in HW Week 4 Continue program. Test functionality With DSP. Week 5 Test Signal Processing program Week 6 Continue to modify signal processing code Begin formal paper and Poster design. Week 7 Continue testing and Analysis. Continue paper and Poster. Week 8 Finish testing, make Appropriate changes. Begin finalizing paper And poster. Week 9 Final troubleshooting And testing. Finish paper and Poster. Week 10 Double Check tasks Assure everything is Completed and functional Week 11 Prepare and demonstrate final product

Week 1 Interface amplifier with DSP board. Continue IRB. Week 2 Begin coding on the DSP. Finish IRB. MSD II FLOWCHART P08027: PETER D. Week 3 Continue coding on the DSP.. Week 4 Continue coding on the DSP. Begin Testing with controller algorithm Week 5 Integrating filtering with the Control system Week 6 Starting testing with IRB gathered data Week 7 Continue testing with the IRB data Week 8 Formal Paper/Poster Continued testing Week 9 Formal Paper/Poster Continued testing Week 10 Formal Paper/Poster Continued testing Week 11 Product Presentation

Week 1 Continue IRB. Begin communication With the DSP Week 2 Finish the IRB. Work on Control algorithm with On the DSP. MSD II FLOWCHART P08027: JAY R. Week 3 Continue DSP control Algorithm. Week 4 Finish the Control System and begin testing With the filter Week 5 Test Wireless Transmission of data Between DSP and car. Week 6 Test and T/S issues With DSP using Live EMG data Week 7 Test and T/S issues With DSP using Live EMG data Week 8 Test and T/S issues With DSP using Live EMG data. Begin documentation Week 9 T/S, Document Week 10 Document all Implementation on DSP Along with results Week 11 Product Presentation

Week 1 Begin implementation of RC subroutines. Continue IRB Study Week 2 Continue implementing RC subroutines. Finish IRB Study MSD II FLOWCHART P08027: JAMES C. Week 3 Begin implementing wireless subroutine Test RC subroutines Week 4 Continue implementing wireless subroutines Week 5 Test wireless communications Week 6 Help with DSP, begin System wide tests Week 7 Help with DSP Continue T/S and modification Week 8 Continue developing and Testing interface Between DSP and car Week 9 Documentation. Finish development of RC Car controls. Week 10 Document Interfaces Week 11 Final testing and documentation authoring

Week 1 Inventory Parts Continue IRB Testing Week 2 Put together Speaker Test and Troubleshoot (T/S). Finish IRB Study MSD I FLOWCHART P08027: DANZIGER Week 3 Put together test matrix for DSP output Document for next SD phase Week 4 TroubleShoot RC Car, DSP, Speaker Document for next SD phase Week 5 Continue T/S as needed Document for next SD phase Week 6 Continue T/S as needed. Begin full system tests Begin final paper Documentation Week 7 Troubleshoot, Test Continue Final paper Begin Poster Documentation Week 8 Document System Continue T/S, final paper, Poster design Documentation Week 9 Trouble Shoot System Finish paper Finish poster design Week 10 Present Completely Working System Finish all SD doc. for Next phase Week 11 Present the system Ensure all aspects are complete.