Precedence Diagramming
Advertisements

Lecture 4 – PERT Diagrams & CPM
WBS: Lowest level OBS: Lowest level
Developing a Project Plan CHAPTER SIX Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 6 Scheduling. 222 Learning Objectives Estimate the duration for each activity Establish the estimated start time and required completion time.
© The McGraw-Hill Companies, Software Project Management 4th Edition Activity planning Chapter 6.
Developing a Project Plan CHAPTER SIX Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Associate Professor MIS Department UNLV
CP Chapter 4 Schedule Planning.
Chapter 6: Developing a Project Plan
Project Management 6e..
Project Management from Simple to Complex
Chapter 17 Project Management McGraw-Hill/Irwin
Project Scheduling: PERT-CPM
Chapter 6 Time Planning & Networks
Developing the Project Plan
Project Management Projects are unique, one-time operations designed to accomplish a specific set of objectives in a limited timeframe Project managers.
Start D finish A B C E I G H F J KL N M ActivityDescription AExcavate BFoundation CRough wall DRoof EExterior plumbing FInterior.
Dr. ALAATTIN KANOĞLU I.T.Ü. FACULTY OF ARCH. I.B.U. ARCHITECTURE UNDERGRADUATE PROGRAM ARCH472 PROFESSIONAL PRACTICE MANAGEMENT Basic Steps, Rules, Methods.
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
PRJ566 Project Planning and Management Lecture: Network Diagrams.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
Project Management Project Management
Finding the Critical Path
Project Management in Practice, Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
Developing a Project Plan
1 1 Slide © 2006 Thomson South-Western. All Rights Reserved. Slides prepared by JOHN LOUCKS St. Edwards University.
Chapter 13 Project Scheduling: PERT/CPM
Chapter 9 Project Scheduling: PERT/CPM
Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects. Use.
CPM Network Computation
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
The Topics that will be addressed in this Module include:
Introduction to Management Science
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
Advanced Project Management - CPH
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
إدارة المشروعات Projects Management
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
MGMT 483 Week 8 Scheduling.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Dr. Hany Abd Elshakour 5/4/2015 3:55 PM 1. Dr. Hany Abd Elshakour 5/4/2015 3:55 PM 2 Time Planning and Control Activity on Node Network and Precedence.
Project Networks. A,4 B,3 C,4 D,6 E,3 H,6 F,5 G,4 I,2 St,0 Fin,0 Example Network - terminology C,t Activity Duration of Activity (ES, LS) Early Start.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Network planning Learning objectives After these lectures you should be able to: - Produce and analyse activities networks - Calculate earliest and latest.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
AMERICAN SPORTS BUILDERS ASSOCIATION CRITICAL PATH METHOD SCHEDULING FOR SUCCESS December 6-8, 2008 New Orleans, Louisiana Presented By: Bill Pronevitch.
Importance of Project Schedules
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Introduction to Project Management A basic introduction to common project management processes that may be typically encountered during a projects lifetime.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
© Construction Management Association of America. Do Not Duplicate or Reproduce. Standards of Practice Course CPM Scheduling Lab.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Project Management MGT 30725
Time Planning and Control Activity on Node Network (AON)
Project Scheduling Chapter 14.
CHAPTER 6 PROJECT TIME MANAGEMENT
Time Planning and Control Activity on Node Network (AON)
Project Time Management
Time Planning and Control Activity on Node Network (AON)
Project Time Management
Lecture 5: Project Time Planning (Precedence Diagramming Technique)
Project Time Management
Project Time Management
Exercise – A small building.
Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

MANAJEMEN PROYEK PERANGKAT LUNAK Program Pendidikan Vokasi Universitas Brawijaya Tahun 2011

Pertemuan 5 Perencanaan Proyek : PDM (Presedence Diagramming Method) PDM (Presedence Diagramming Method) CPM (Critical Path Method) CPM (Critical Path Method)

Critical Path Method Advantages: Identifies activities that control the project length Determines shortest time for completion Identifies activities that are critical (i.e. cannot be delayed) Shows available float for non-critical activities Allows evaluation of what-if scenarios Allows monitoring & control of fast-track projects With software can be resource loaded and leveled

Critical Path Method Disadvantages Only as good as the effort put forth to properly model the plan Can be difficult to properly update Can be easily misused May lead to a false sense of security Actual conditions may necessitate significant modifications to model to accurately reflect reality

Precedence Diagramming Method (PDM) PDM network rules: Activities are represented by boxes or nodes that are assigned properties of the activity they represent Precedences are shown by arrows that have both direction and time properties Precedences consist of two parts: A relationship and a lag value or constraint Finish – to – StartFS Finish – to – FinishFF Start – to – StartSS Start – to – FinishSF Lag = x Days ( a negative lag is called a lead)

PDM – Precedence Diagram PDM activities are comprised of: Activity descriptions Nodes representing the activity Arrows representing relationship / dependency Points indicating direction of relationship / dependency

PDM Logic Relationships Finish to Start (FS) – Activity A must Finish before Activity B may Start. The lag is usually zero. FS is the most common type. Start to Finish (SF) – Activity A must start before Activity B may Finish. The lag is usually greater than either activity duration. FS is the least common type. Activity AActivity BActivity AActivity B

PDM Logic Relationships Finish to Finish (FF) – Activity A must Finish before Activity B may Finish. The lag value is usually greater than zero. FF is a less common type. Start to Start (SS) – Activity A must Start before Activity B may Start. The lag value is usually greater than zero. SS is a less common type. Activity AActivity BActivity AActivity B

PDM Time Calculations Once the Network is constructed and duration of each activity is estimated, we can determined the following four time values: Earliest Start (ES) – The earliest possible time an activity can begin Earliest Finish (EF) – The earliest possible time an activity can finish Latest Start (LS) – The latest possible time an activity can start without delaying project completion Latest Finish (LF) – The latest possible time an activity can start without delaying project completion

PDM Time Calculations ES and EF are determined by making a Forward Pass (left-to-right) through the Network. ES of an activity is equal to the latest of early finish times of its predecessors. EF is the total of the activity ES plus its duration. LS and LF are determined by making a Backward Pass (right-to-left) through the Network. LF of an activity is equal to the smallest of the LS times of the activities exiting from the activity in question. LS of an activity is equal to its LF minus its duration.

PDM Activity Notation and Assumptions Each activity box consists of six cells For the following example assume all activities: Begin on the morning of the scheduled start date End the evening of the scheduled finish date Using a 7-day workdays per week calendar 4E ES EF Activity Duration LSLF 0 Lag

Forward Pass Example 6D9 4 8E8 1 4F G (F to G) = 11 (E to G) = 9 (D to G) = 12 Largest ES Early Start Calculations Early Finish Calculation – 1 = 18

Backward Pass Example 18H I J K (H to K) = 22 (I to K) = 23 (J to K) = 33 Late Finish Calculations Late Start Calculation = 19

CPM Example Exercise A 6d B 11d C 20d H J D 13d E 9d F 20d G 6d I 13d FSFFSSSF

CPM Example Exercise Forward Pass Results A 6d B 11d C 20d H J D 13d E 9d F 20d G 6d I 13d 1d6d7d17d18d37d63d82d 1d20d21d33d34d42d43d62d 34d39d40d52d

CPM Example Exercise Backward Pass Results A 6d B 11d C 20d H J D 13d E 9d F 20d G 6d I 13d 1d6d7d17d18d37d63d82d 1d20d21d33d34d42d43d62d 34d39d40d52d 4d9d10d20d43d62d63d82d 1d20d21d33d34d42d43d62d 44d49d50d62d

CPM Example Exercise Backward Pass Results A 6d B 11d C 20d H J D 13d E 9d F 20d G 6d I 13d 1d6d7d17d18d37d63d82d 1d20d21d33d34d42d43d62d 34d39d40d52d 4d9d10d20d43d62d63d82d 1d20d21d33d34d42d43d62d 44d49d50d62d

CPM – Float (or Slack) and Critical Path Additional Network calculations provides other important information allowing analysis and control: Total Float (TF) – The amount of time an activity can be delayed without delaying the overall project completion, which is equal to Late Finish minus Early Finish. Free Float (FF) – The amount of time an activity can be delayed without delaying the start of another activity. Can be determine by subtracting the smallest Total Float going into an activity from each predecessor into that activity. Critical Path – The path through the Network that has the longest total duration, thus it defines the shortest period of time in which the project may be completed.

Float Calculation Example

CPM Example Exercise Continue with Exercise A 6d B 11d C 20d H J D 13d E 9d F 20d G 6d I 13d 1d6d7d17d18d37d63d82d 1d20d21d33d34d42d43d62d 34d39d40d52d 4d9d10d20d43d62d63d82d 1d20d21d33d34d42d43d62d 44d49d50d62d

CPM Example Exercise Float Results A 6d B 11d C 20d H J D 13d E 9d F 20d G 6d I 13d 1d6d7d17d18d37d63d82d 1d20d21d33d34d42d43d62d 34d39d40d52d 4d9d10d20d43d62d63d82d 1d20d21d33d34d42d43d62d 44d49d50d62d 3d 25d0d 10d

CPM Example Exercise Critical Path Traced A 1d6d 4d3d9d B 7d11d17d 10d3d20d C 18d20d37d 43d25d62d H 63d20d82d 63d0d82d J 1d20d 1d0d20d D 21d13d33d 21d0d33d E 34d9d42d 34d0d42d F 43d20d62d 43d0d62d G 34d6d39d 44d10d49d I 40d13d52d 50d10d62d FSFFSSSF