Progress in the ITER Neutral Beam Test Facility

Slides:



Advertisements
Similar presentations
12GeV Project CD-4 Leigh Harwood Associate Project Manager Accelerator Systems.
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
F. GnesottoFrascati, 19 gennaio 2007 Giornata di presentazione del Progetto ITER all’Industria italiana Ruolo dell’Associazione Euratom-ENEA Prof. F. Gnesotto,
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1/13 T. Inoue NEUTRAL BEAM INJECTION R&D on Ion Sources and Accelerators FT/1-2Ra: 1 MeV accelerator and uniformity R&D on a High Energy Accelerator and.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
17 th IAEA TM on Research Using Small Fusion Devices, Lisbon B. Schunke 1 B. Schunke D. Bora, J.-J. Cordier, R. Hemsworth, A. Tanga V. Antoni & RFX Team.
Phase Difference = Phase Difference = 0.05.
Green Building and Sustainable Architecture
POLY PHASE A.C.CIRCUITS CHAPTER 7.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
Chapter 7 – Built Environment. Introduction What is built environment? Two strategies to consume less resources – Use less material – Use more material.
D. Borba 1 21 st IAEA Fusion Energy Conference, Chengdu China 21 st October 2006 Excitation of Alfvén eigenmodes with sub-Alfvénic neutral beam ions in.
PA 5.3.P6.JA.01.0 “High voltage power supply for neutral beam test facility (NBTF)” JADA 15 th /June, 2015 Request for ; A change in allocation of money.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Magnox Swarf Storage Silos Programme Decommissioning Delivery Partnership Requirements February 2014 Gavin Askew.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th.
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
Page 1J. Hourtoule, Electricity contract: scope and forecasted consumption, 16/07/2015 © ITER Organization Electricity Supply Contract: For the ITER Site.
Jarred Alexander Young October 22,  All components biased relative to ground  May prevent beam generation  Beam Diagnostics thrown off by Decel.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
More than a safety line: jump-stabilizing silk of salticids by Yung-Kang Chen, Chen-Pan Liao, Feng-Yueh Tsai, and Kai-Jung Chi Interface Volume 10(87):
GSI-Cryoexpertmeeting; 19. & Cryoplant for series test facility Standard plants have a capacity up to A capacity of about 1,5kW is.
Weddell Power Station unit three
September 19-20, 2007 L. Snydstrup Controls, Diagnostics, Vacuum, Cooling Systems, Installation DOE Annual Review Controls, Diagnostics, Vacuum, Cooling.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Proton Plan PMG 5/25/06 David Harding Booster Correctors Status and CR David Harding.
Electrical Installation II1 Registered Electrical Contractor / Worker (Refer to handouts)
TE-CRG Activities D. Delikaris, TE-CRG.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Green Building and Sustainable Architecture
/ 14 (FIP/2-5Ra) Development of DC ultra-high voltage insulation technology for ITER NBI H. Tobari et al., (JAEA) (FIP/2-5Rb) Progress in long pulse production.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
MICE RF System Power Supplies, Control and Monitoring Status report
PIs: Riad Suleiman and Matt Poelker
12-luchetta-RFX-3-O Integrating Supervision, Control and Data Acquisition – The Neutral Beam Test Facility Experience A. Luchetta, G. Manduchi, C.Taliercio.
Integration & Commissioning
REPORTS BY NEW PROJECT DIVISION HEADS: “Rare Isotope Beams”
DC Injector and Space Charge Simulation Status
1 Institute For Plasma Research, Bhat, Gandhinagar, Gujarat, India
Checklist for Site Reconnaissance (Sabatini et al_2002)
Large Electric Generators
R & D Status of Beam Neutralization System M. Sasao, K. Shinto, M
Laboratory Directed Research and Development (LDRD) Proposal
HiRadMat Test Facility
R. Suleiman and M. Poelker October 12, 2018
PIs: Riad Suleiman and Matt Poelker
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
FIP/P1-12 A.Y. Dnestrovskiy et al.
Status of the PANDA Solenoid Magnet Production in BINP
ITER FIRST WALL HEAT FLUX CONTROL DEVELOPMENT
FIP/P1-45: Baking of Aditya Ugrade Tokamak
TPF = max(Prad(fn=1)) /Prad(fn=1)
27th IAEA FUSION ENERGY CONFERENCE,22-27 OCT 2018,AHMEDABAD,INDIA
Summary Slide (OV/1-1) PROGRESS OF ITER-INDIA ACTIVITIES FOR ITER DELIVERABLES-Challenges and mitigation measures What are the major developments? A functional.
NSS integrated installation plan workshop Introduction
Progress towards development of long pulse ITER operation trough RF heated H-mode experiments in EAST and HL-2A (A. Ekedahl et al., EX/P2-16)
Progress in the realization of the PRIMA Neutral Beam Test Facility FIP2/4-Rc SPIDER MITICA The ITER Heating Neutral Beam requirements (1MeV, 16.7MW,
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Presentation transcript:

Progress in the ITER Neutral Beam Test Facility SPIDER Experimentation started in 2018: Plants and diagnostics entering into operation one by one Characterization of source and beam in progress MITICA High voltage power supplies almost completed and under test on-site First HV insulating tests successfully passed Auxiliary plant systems under installation and/or commissioning phase All procurement contracts for mechanical components in progress Beam source delivery expected in 2022 Toigo et al., 27th IAEA-FEC, Gandhinagar, October 2018