NA FIS TD UPDATE 2010 1 INTERNATIONAL SKI FEDERATION Timing & Data.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Kapitel S3 Astronomie Autor: Bennett et al. Raumzeit und Gravitation Kapitel S3 Raumzeit und Gravitation © Pearson Studium 2010 Folie: 1.
Kapitel 21 Astronomie Autor: Bennett et al. Galaxienentwicklung Kapitel 21 Galaxienentwicklung © Pearson Studium 2010 Folie: 1.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
ABC Technology Project
TIMING & DATA TECHNICAL REPORT ver 7.1
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
© S Haughton more than 3?
VOORBLAD.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Chapter 5 Microsoft Excel 2007 Window
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Figure Essential Cell Biology (© Garland Science 2010)
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
How Cells Obtain Energy from Food
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
By Rasmussen College. 1. What majors or programs do you offer? 2. What is the average length of your programs? 3. What percentage of your students graduate?
McGraw-Hill©The McGraw-Hill Companies, Inc., 2001 Chapter 16 Integrated Services Digital Network (ISDN)
CpSc 3220 Designing a Database
Traktor- og motorlære Kapitel 1 1 Kopiering forbudt.
Alpine Ski Racing One TDTR for All Uses An important revision /10 update AB Church.
Alpine Ski Racing One TTRF for All Uses. Report Form Changes This Season FIS Form Simplified French and German removed Separate Start Timers deleted Sync.
Alpine Technical Delegates Update INTERNATIONAL SKI FEDERATION Timing & Data Technical Report Form Version 7.1.
Presentation transcript:

NA FIS TD UPDATE INTERNATIONAL SKI FEDERATION Timing & Data

NA FIS TD UPDATE Timing and Data Report Form Instructions

NA FIS TD UPDATE Equipment Race Level: NorAm Cup Sys Timer A Sys Timer B Start Gate Finish Cell A Finish Cell B Brand Name Model or Type Serial Number Homologation #

NA FIS TD UPDATE Equipment

NA FIS TD UPDATE Software Software & Results Preparation Brand Version Date Results= Tapes dTris Rev /8/2008 yes

NA FIS TD UPDATE Connections

NA FIS TD UPDATE Check BEFORE the race (before Arrival at the venue) Connections How do we communicate signals/data from Start to Finish? How is voice communication handled between Start and Finish? Cable Radio Snowmobile Ski Lift Skier ??

NA FIS TD UPDATE Timing Data

NA FIS TD UPDATE Warm-up and Synchronization At what time is the run scheduled to start? --Is there a rule about Synchronization? --What is the minimum recommended warm up time? Is there a Maximum?

NA FIS TD UPDATE Whats the Problem?

NA FIS TD UPDATE Whats the Problem?

NA FIS TD UPDATE Synchronization and Synch + 1 Minute Are Systems A and B synchronized? –How close are they? What is the maximum difference acceptable? –So what? What about Hand Times? –So what?

NA FIS TD UPDATE

NA FIS TD UPDATE What Would you Do?

NA FIS TD UPDATE What Would you Do?

NA FIS TD UPDATE What Would you Do?

NA FIS TD UPDATE

NA FIS TD UPDATE Start and Finish Installations Various Race Levels – You Guess

NA FIS TD UPDATE Whats the Race Level? Start Posts and Ramps World CupRegional FIS

NA FIS TD UPDATE Whats the Race Level? Start Posts and Ramps World Cup

NA FIS TD UPDATE Whats the Race Level? Start Posts and Ramps Regional FIS

NA FIS TD UPDATE Start Posts and Ramps Name the Problems Wiring should be neat and not easily disturbed Start should not easily obstruct the athlete and should be closer to the start posts Start Posts Should be closer to the break over Some kind of crowd control to separate the start area from the preparation area Separation between end of wand and start post

NA FIS TD UPDATE

NA FIS TD UPDATE Whats the Race Level? Finish Photocells, Posts and Areas World CupRegional FIS

NA FIS TD UPDATE Whats the Race Level? Finish Photocells, Posts and Areas Regional FIS

NA FIS TD UPDATE Name the Problems Finish Photocells, Posts and Areas Regional FIS Fiberglass Start Posts (they last a long time, but OUCH) No Notches Horizontal Separation No Finish Line Metal Spool mounted on metal stake behind finish pad

NA FIS TD UPDATE

NA FIS TD UPDATE