FOLLOW-UP FOR THE TDI = LHC injection beam stopper

Slides:



Advertisements
Similar presentations
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
Advertisements

Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
Injection test? Mike Lamont For initial discussion.
Impedance of new ALICE beam pipe Benoit Salvant, Rainer Wanzenberg and Olga Zagorodnova Acknowledgments: Elias Metral, Nicolas Mounet, Mark Gallilee, Arturo.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
Beam load estimates for the PS2 Beam Dump Systems T. Kramer, M. Benedikt, B. Goddard.
Accelerator Physics Issues Shekhar Mishra Sept 17-19, 1996 Main Injector DOE Review.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
LSWG day: Impedance and beam induced heating Nicolas Mounet *, Daria Atapovych, Nicolò Biancacci, Elias Métral, Tatiana Pieloni, Stefano Redaelli, Benoit.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
Updates on FLUKA simulations of TCDQ halo loads at IR6 FLUKA team & B. Goddard LHC Collimation Working Group March 5 th, 2007.
Simulations of TCT beam impacts for different scenarios R. Bruce, E. Quaranta, S. RedaelliAcknowledgement: L. Lari, C. Bracco, B. Goddard.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
Overview WP14 Developments Hardware  Interferometry on the spare TDIs, planned to be installed Christmas stop 2015/2016. Final acceptance tests ongoing.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
Transfer Line Test preparation meeting V. Kain, R. Alemany.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
Preparation for Circulating Beam - Part II Collimators (40') Oliver Aberle o Breakdown of tests foreseen in preparation for beam o Equipment folder: tests.
Elias Métral, LHC collimation working group meeting, 17/07/061/26 E. Métral for the RLC team LATEST ESTIMATES OF COLLIMATOR IMPEDANCE EFFECTS u Reminder:
Energy deposition as function of intensity and emittance  The damage potential of a beam does not only depend on the total intensity Energy deposition.
FCC related MDs. Faster LHC ramp MD Brennan Goddard; Matteo Solfaroli Camillocci; Wolfgang Bartmann; Florian Burkart; Francesco Maria Velotti; Mike Lamont;
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
V. Kain AB/OP1Chamonix XV What is required to safely fill the LHC? V.Kain AB/OP Input from: B.Goddard, M.Jonker, Y.Kadi, R.Losito, V.Mertens, B.Puccio,
Aperture measurements during LHC commissioning 2017
Beam Energy & Intensity: One bunch during full cycle
LHC Commissioning with Beam
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
LHC schedule.
SPS extraction, transfer lines, injection
The LHC - Status Is COLD Is almost fully commissioned
Jan Uythoven For discussion
LHC Risk Review: Kicker Magnet Reliability
FCC hh dump kicker - switch topologies and impact on beam
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Safe Injection into the LHC V.Kain AB/CO
Impedance working group update
Status of LHC Operations
Safe Injection into the LHC V.Kain AB/CO
Thursday morning – optics correction
Monday 6th August & night
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
LHC Injection and Dump Protection
Status from the collimator impedance MD in the LHC
LHC Morning Meeting - G. Arduini
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Week 35 – Technical Stop and Restart
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
Overall commissioning strategy for protons (estd. 2005)
RESISTIVE HEAT LOAD FOR THE TDI = LHC injection beam stopper
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Collimators: Operations - Baseline Assumptions
FOLLOW-UP FOR THE TCDQ & TCDS & TDI concerning the RF fingers
LHC - Week 38 Technical stop: Katy Foraz
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Monday 10th December - morning
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
HI2011 Commissioning Status
Presentation transcript:

FOLLOW-UP FOR THE TDI = LHC injection beam stopper E. Métral The TDI is a special “collimator” to be used for protecting the machine from a potential misfiring of the injection kickers  At injection only (opened at extraction) 1 per ring  2 in total See RLC presentation on 11/06/2004  Resistive heat load of ~ 100-200 W Elias Métral, LCE meeting, 19/09/2006

TDI configuration for ALICE Elias Métral, LCE meeting, 19/09/2006

Follow-up of questions raised during the last RLC meeting on 12/09/06 1) Follow-up with Brennan the TDI gap requirements  Email from Verena Kain: “The TDI provides damage protection against injection kicker failures. It will only be close to the beam during injection. Two parameters determine the required setting of the TDI: the injected intensity and the LHC available aperture. If the injected intensity is above 2e12, the TDI jaws have to be moved to the nominal setting determined by the LHC aperture (6.8  setting for 7.5  available aperture)” 2) Check that beam-induced heating of several kW is acceptable  Email to Oliver Aberle: “We estimate the acceptable heatload up to 20kW. We will try to do during the bake out cycle some measurements in the lab” Elias Métral, LCE meeting, 19/09/2006

Follow-up of questions raised during the last RLC meeting on 12/09/06 3) Clarify TDI operation mode with Brennan  Email from Brennan Goddard: “Both beams go through the TDI at all times, from injection up to top energy - the TDI jaws are retracted away from the beam once the injection process is finished, i.e. they will be close to the beam for about 20'” 4) Follow up no. of TDIs w/o ferrite and spares  Email from Volker Mertens (confirmed by Oliver Aberle): “…the ferrites will be included in the TDI which will be installed in LSS8R in the shutdown 2007/2008 in replacement for the "first version". Ferrites will also be installed directly in the TDI which will be installed in LSS2L in early 2007. The presently built "first version" without the ferrites will be installed in a couple of weeks in LSS8R and then come out after the 450 GeV "engineering run" and will be reworked as a common spare for IR 2 and 8” Elias Métral, LCE meeting, 19/09/2006