Trafikverket TSI Compliant PCS Mandatory interface

Slides:



Advertisements
Similar presentations
© by cellconsult.com Application Testing & Test Management.
Advertisements

SPL/2010 Test-Driven Development (TDD) 1. SPL/
T h e G a s L a w s. T H E G A S L A W S z B o y l e ‘ s L a w z D a l t o n ‘ s L a w z C h a r l e s ‘ L a w z T h e C o m b i n e d G a s L a w z B.
Workshop on Cyber Infrastructure in Combustion Science April 19-20, 2006 Subrata Bhattacharjee and Christopher Paolini Mechanical.
GLogistics LLC “A Service-Disabled Veteran-Owned Small Business” Corporate Capabilities.
Technical Question Technical Question
RAILWAY UNDERTAKINGS & INFORMATION EXCHANGE ICT Interoperability Issues in Rail Freight - European Railway Conference.
Stefan Jugelt (ERA) TAP TSI CCM – baseline version th RISC Committee – January 2014.
® MedBiquitous Virtual Patient Standard: A Technical Overview.
Interconnection with T2S
 Previous performance  Attendance history  Medical conditions  who do we contact in event of an emergency?.. Teaching students from other Schools.
Technical lssues for the Knowledge Engineering Competition Stefan Edelkamp Jeremy Frank.
OBIX in action. open Building Information eXchange (oBIX) Development started 2003 Currently a technical committee at the OASIS Standard XML representation.
[INSERT THE NAME OF YOUR PILOT ORGANIZATION] INSERT DATE.
Global Business Process Modellers GSMP Brussels 27 February 2003.
IT 210 Week 8 CheckPoint Interfaces and Communication Messages To purchase this material link 210-Week-8-CheckPoint-Interfaces-and-
TAF TSI implementation in Latvian Railway (LDz)
Renatas Šakūnas 6th Regional TAF TSI Workshop
"Step by Step" Guide to implement TAF TSI
XYZ Port Facility Maritime Security Drill
Some Basics of Globus Web Services
Project Background Project Title
Title: LEARNING FOR THE BLIND
OLMEK Building a confidential and secure communication between a Bank and its customers March 2006.
Status Report F2F Meeting Jan 2008
Object-Orientated Analysis, Design and Programming
XYZ Port Facility Maritime Security Drill
TAF/TAP workshop Brussels, September 2017.
COMMUNICATION.
ePhyto – IPPC Solutions
Implementing a service-oriented architecture using SOAP
TTR IT Implementation Capacity Offer/Request/Allocation
MEC /16/ :53 PM © 2014 Microsoft Corporation. All rights reserved. Microsoft, Windows, and other product names are or may be registered trademarks.
Solve: 1. 4<
RFC Short Term Path Request Pilots
Content Management System
Removal of national particularities, PCS UG
فرایند تسهیلگری در مددکاری جامعه ای
Customer Service Phone App
Business Registers Interconnection System
Temporary Capacity Restrictions: TCR WG & TCR tool
Buffer Space Optimisation with Communication Mapping and Traffic Shaping for NoCs Sorin Manolache, Petru Eles, Zebo Peng Linköping University, Sweden.
3. SafeSeaNet A data exchange network and a standardisation of the main information available on ships (all flags) and their cargo Providing a clear picture.
Presentation contents:
Organizing Semantics For Effective Enterprise Application Integration
ESSnet on SDMX phase II June 7-8, Luxembourg.
PCS CCB Group 22nd February, 2017.
Redesign of the International Timetabling Process (TTR)
PCS User Group 15th February, 2017.
Retrospective report of the past year
Wise Implementation Plan
PCS Groups and Boards PCS Day 2016
TTR IT Landscape PCS-TTR Day Vienna, 21 November 2018.
TAF-TSI Pilot PCS Day 2017.
JS Pilot and TEG Meeting, Vienna, 12/02/2019
TSI Compliant PCS Mandatory Interface
Dissemination Working Group 7/8 May 2008 G. Schäfer
PCS Technical Board 27th February 2018, Vienna.
Construction Industry Charter Progress Update
Status PCS projects March 2019 Gilles Vergote.
Connecting Europe, Railway Undertakings and ProRail
Developments Confirmation by the CCB that the TAF TSI components have been successfully implemented into PCS Confirmation by the CCB that PCS has been.
"Step by Step" Guide to implement TAF TSI
Formula Hybrid - Fall 2018 Lafayette College ECE 491.
RNE ETA Programme Overview
Driving Successful Projects
VoiceXML An investigation Author: Mya Anderson
Presentation transcript:

Trafikverket TSI Compliant PCS Mandatory interface

Recap from last meeting – delayed Initial plan was TT2021 Go Live for MPK was delayed We were working on a new release plan

New Plan - When will it be in production Current release plan Support automatic integration for TT2023

Progress in implementation Not so much progress TAF/TAP JS Pilot environment during development Technical issues between RNE CI and Trafikverket CI Taking long time to solve technical issues

What could help us in development The best would be a working CI to CI communication between our system and PCS Scenarios with real XML example messages for the message exchange We could use these messages during development