SEVERE OIL LEAKAGE THROUGH BEARING PADESTAL

Slides:



Advertisements
Similar presentations
1 Copyright Electric Power Research Institute 2008 Steam Turbine-Generator Guidelines Quick Start VolumeContent 1General Practices Condition assessment,
Advertisements

Gearbox Spectral Components and Monitoring Methods
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Improving Efficiency & Reliability
Auxiliary Power Plant Fundamentals
Lubrication Of Roller Bearings. Roller Bearings have a long history around 700 BC AC around 3000 BC.
Clutch “washer mod” or “contact button mod”. “washer mod” (30 minutes max!)
Labyrinth seal into two halves
PRESENTATION ON CONSTRUCTIONAL FEATURES OF 57.02MW STEAM TURBINE AT AES KELANITISSA BY G.SRIDHAR DEPUTY MANAGER/BHEL.
Guardian & Vortex Shedder Sealing System Presentation
What is a centrifugal pump?
Accelerometer’s for Wind Turbines Alternative Energy Wind turbines are a growing source of alternative clean energy sources. As individual machines, or.
WELCOME.
BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA
MAGSEAL 101. Rotary face seal that utilizes magnetic attraction force to positively mate the optically flat seal faces. Magnetic attraction force variation.
Converting Journal Bearings to Tilting Pad Bearings to Control Oil Whip & Vibration in a Gas Turbine Tony Dzubay Rochester Public Utilities E & O TECHNICAL.
Rolling Contact Bearing
WELCOME.
PARMENANT MAGNET SYNCHRONOUS GENERATOR BY JA’FAR R.A. AZIM Assem M.A. Al ighrair.
33rd Turbomachinery Research Consortium Meeting
What is a Turbine ? A Turbine is a device which converts the heat energy of steam into the kinetic energy & then to rotational energy. The Motive Power.
Rolling element bearings A. Lozzi 09
TURBINE & COOLING SYSTEM Presented By – AVIJEET PRATAP 07ME12 IET AGRA
TRANSMISSION SYSTEM (GEAR BOX)
 SteriLobe  Classic+  SQ  AccuLobe  RTP On-Line  DuraLobe  TRA10  TRA20  TRA400  TRA400  SteriLobe  Classic+  SQ  AccuLobe  RTP On-Line.
Welcome to a School. Dale L. Kohlsmith Director of Training Numatics, Inc.
STEAM TURBINE POWER PLANT Muhammad Taha (EE106013) Faisal Iqbal Khan
Accessory Drive/Gearbox Assembly
1000A 60Hz Gearbox Grade 3 Incoming Inspection Serial Number: (BR) TGW Job Number: Inspection Date: 1/14/13 1.
© 2012 Delmar, Cengage Learning Manual Transmission Diagnosis and Repair Chapter 72.
FIVE TIGERS ENGINEERING CO., LTD. DYNAMIC BALANCING APPLICATIONS.
CLASSROOM MANUAL l CHAPTER 4 –page 74. BEARINGS, BUSHINGS, THRUST WASHERS l When a component slides over or rotates around another part, the surfaces.
Pump design Raimonds Nikoluskins CERN – LIEBE project coordination meeting.
Hydraulic machinery Turbine is a device that extracts energy from a fluid (converts the energy held by the fluid to mechanical energy) Pumps are devices.
Endend Power turbines. endend /01 PPT26/03/99.
1 Encotech Steam Path Audits Presentation. 2 Overview What is a Steam Path Audit? Benefits Cost Chronology of a Steam Path Audit STPE Results.
Parul Institute of Engineering & Technology Subject Code : Name Of Subject :Fluid Power Engineering Topic :Rotodynamic Pumps.
High Speed Balancing in the Service Industry – Deformed Rotors
MRO Dry Gas Seal Reliability Improvement
Engine Technology Engine Diagnostic its requires an understanding of the fundamentals & a systematic approach to determine what the problem is. If the.
Rear Cover Assembly The Toodle comes with the rear cover assembled. Normally, there is no need to open the rear cover. In case the rear bearing is stuck.
18 MW TURBINE CONTROL PANEL
VARIOUS FUNCTIONS OF OIL Lubrication and cooling of Bearing. Jacking up the shaft and to provide hydrostatic lubrication during low speed operation through.
EEE223 Energy Conversion II Md. Asif Uddin Khan Lecturer, EEE BRAC University.
An Energy & Environment Conscious Sustainable Organization A Presentation on “Turbine Interlocks 2X50 MW”
IN THE NAME OF ALLAH, THE BENEFICENT, THE MERCIFUL
PREPARED BY: Group-D Ramavat Nikunj ( )
Manual Drivetrains and Axles
Ram-air, Superchargers, Turbochargers and Nitrous Oxide
conventional rear wheel drive, a beam axle assembly
System One Pumps S1-101 Construction and Features
MAGM 262 Hydraulic Seals Mr. Conrado.
SNS COLLEGE OF ENGINEERING Coimbatore-107 Subject: Thermal Engineering
Background Motor Description: 13.2kv, 7000hp, 3600rpm, FLA=253, LRA = 1563A Performed simulation by interrupting at current zero’s. A first, then B/C.
Rear Cover Assembly.
Rolling Contact Bearings
Date of download: 12/31/2017 Copyright © ASME. All rights reserved.
Fans & Heaters technical seminar
SynLube P12 / PAG- Based Compressor Fluid Benefits …
CHAPTER 45 Engine Lubrication.
Rear Cover Assembly.
Unit 6 Turbine Vibration Investigation - Observation by PMT
Machine Learning Course.
Casing Gen DE axial recorded at different speeds and at load
What is a Turbine ? A Turbine is a device which converts the heat energy of steam into the kinetic energy & then to rotational energy. The Motive Power.
High Speed Balancing in the Service Industry – Deformed Rotors
TURBINE CASING, BEARING LUBRICATION AND GLAND STEAM SYSTEM Subhasis Siddhanta NPTI; DURGAPUR 1.
Shrink-fit Turbine Coupling – a revolution and a revelation
WELCOME TO TURBINE & ITS AUXILIARIES KNOWLEDGE GROUP PRESENTATION by madhukar srivastava, se (m), ktps, dvc.
FAILURE OF BARRING GEAR CLUTCH ASSLY COUPLING
Presentation transcript:

SEVERE OIL LEAKAGE THROUGH BEARING PADESTAL 33MW TG. UNIT-1. BORL, BINA PROJECT

OIL GUARD RING ASSEMBLY

DESCRIPTION During steam rolling and synchronization of U#1 from 22.07.10 to 29.07.10, severe oil leakage was observed from rear brg pedestal end (TE). The leakage started when turbine reached at full speed i.e 5000 rpm and gradually increased. The pedestal end from where oil was leaking out is located very close to turbine exhaust casing.

During that time U#2 pedestal box up work was in progress During that time U#2 pedestal box up work was in progress. It was seen that with rotor in position, the oil guard ring was coming in direct contact with the oil deflector collar of the rotor. As per drg there should be an axial clearance of 4.0 mm clearance between rotor and oil guard ring. It was suspected that similar condition must be existing in Unit-1 also.

ACTION TAKEN Pedestal was opened for inspection. Severe rubbing marks on the oil guard ring was observed. The oil guard ring was machined on the face. One of the brass sealing fins had to be sacrificed in order to obtain adequate clearance . The component was assembled and 4.0mm clearance was ensured. The oil leakage problem was resolved.

ANALYSIS The turbine was assembled and tested at Hyderabad works with all the components supplied to site. During erection, TG axis and pedestal locations were finalized as per drg. All clearances of turbine internals were rechecked and recorded during box up except this reading.

OIL GUARD RING ASSLY WITH ROTOR

The turbine rotor expands by about 4 mm at coupling end. During the course of its expansion it came in direct contact with the oil guard as there was insufficient clearance between them. This caused axial rubbing of the component and also leakage of oil.

REMARKS The oil guard is assembled in the final stage of erection during box up of pedestal. Though this an important component, normally it does not receive proper attention which lead to such mistakes. Assembly of oil guard ring should be paid special attention in view of the rotor expansion issue involved with it.