CNR-IMAA Proposal ( and )

Slides:



Advertisements
Similar presentations
Agenda Session (75 minutes duration, Friday sessions are 90 minutes) Co-lead introduces the session (5 minutes) –repeat of one chart from opening plenary.
Advertisements

Cultural Heritage in REGional NETworks REGNET WP2: Implementation of the System and Preparation of Services and Product Generation Structure and deliverables.
HMA CDR, 5-6 September 2006, Frascati Slide 1 HMA Catalogue Update Presented By Paul Kopp On behalf of Jolyon Martin, ESA Summarising many presentations.
C2-SENSE WP2 Bojan Božić, Gerald Schimak, Refiz Duro C2-SENSE WP2 Meeting Paris
Slide 1 National Research Council - Pisa - Italy Marco Conti Italian National Research Council (CNR) IIT Institute Agenda for the 4th MobileMAN closed.
Development plan and quality plan for your Project
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Dr. Francesco Soldovieri National Research Council (CNR) Institute for Electromagnetic Sensing of the Environment (IREA-CNR) Institute of Methodologies.
1 ROAD MAP OF THE CCSDS ARCHITECTURE WORKING GROUP (AWG) Draft, Issue March 2003 Takahiro Yamada, Chair, AWG.
State Key Laboratory of Resources and Environmental Information System China Integration of Grid Service and Web Processing Service Gao Ang State Key Laboratory.
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
Distributed Software Development QR Marks The Spot Project Plan Presentation Nicolas Jacquemoud.
“Future fit your Catalog” Panel 35th IAMSLIC Meeting, Brugge, Belgium World Cat Local Implementation as part of a Consortia of Libraries University System.
Architecture Task AR Status Presented to the July Meeting of the GEO and Architecture and Data Committee Dr. Thomas C. Adang AR Point.
Chapter 2 Project Management Methodologies. A project life cycle PlanDesignDevelop Integrate (including test) DeployMaintain They can be iterative and.
Standardization activities on IPTV in CCSA CCSA DOCUMENT #:GSC13-PLEN-25 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Plenary; 6.6
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Frascati, 15 February 2012 Slide 1 DREAM Task 4 Feasibility Analysis Server and Client - Implementation plans for SPS within the DREAM project Presentation.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
Frascati, 2-3 July 2008 Slide 1 CITE tests for and HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Nicolas LESAGE, IGN.
Hoeilaart, 19 February 2009 Slide 1 CITE tests for and HMA-T Phase 2 Progress Meeting 19 February 2009, Hoeilaart Nicolas Lesage, IGN.
Frascati, 2-3 July 2008 Slide 1 HMA User Management in G-POD HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Fabrice Brito, Terradue Srl
HMA-T Progress Meeting 26 November 2008 Slide 1 IMAA-CNR activity report HMA-T Progress Meeting 26 November 2008 S. Nativi, E. Boldrini, F. Papeschi IMAA-CNR.
HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
HMA 23 Feb 2011 – Slide 1 Daniele Marchionni TELESPAZIO HMA Follow On Task 4 - Order 23 February 2011.
FedEO KO 5 June 2007 Slide 1 FedEO Catalogue Session. …
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
Frascati, 2-3 July 2008 Slide 1 User Management compliance testing for G-POD HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Andrew Woolf, STFC Rutherford.
Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.
ESA-FAO GEOPortal STATUS & PLANS
The CYCLOPS Platform: geospatial services implementation
GeoNetwork OpenSource: Geographic data sharing for everyone
CEN 202 “Space Standardisation”
HMA AWG Configuration Management Status 1 December 2008
EGEE Middleware Activities Overview
draft-white-i2rs-use-case-02
HMA Follow On Activities
WPS updates from ESA Projects
INTAROS WP5 Data integration and management
Ordering Services for EO Products SWG ATS / ETS
IMAA-CNR activity report
Preliminary Power Point Slides
Systems Architecture WG: Charter and Work Plan
EO Profile of GML and HMA Product Catalog for VITO CVB
HMA SPS Mandatory I/F Development
What does the State GIS Coordinator do?
ROAD MAP OF THE CCSDS ARCHITECTURE WORKING GROUP (AWG)
Ordering Services for EO Products SWG ATS / ETS
Distributed Marine Data System:
Matthew Lyon James Montgomery Lucas Scotta 13 October 2010
Object Oriented Analysis and Design
Case Application Development Method
OBJECT-ORIENTED APPROACH TO OFFICIAL STATISTICS
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
HMA-Testbed Phase 2 AR-2 Meeting July 2009, Frascati
Software Development Process
Contributions to Testing and Reference Data
DREAM Project CSA-ESA Bilateral Meeting 16 February, Frascati
CITE tests for and HMA-T Phase 2 Progress Meeting
HMA Follow-on Kickoff Meeting
OGC and activities HMA-T Phase 2 KO Meeting
Project Phases ‘98 ‘00 ‘02 ‘04 ‘06 Preparatory Phase
HMA-Testbed Project Call
HMA for Science Task 1 – Project Management
Web Service Security support in the SSE Toolbox
Unit IV – Chapter 2 V-Test Model.
Presentation transcript:

CNR-IMAA Proposal (06-131 and 07-038) HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati <xxx>, CNR-IMAA Slide 1

Objectives Main Objective: Operational Goals: To support the take up of HMA defined catalogue standards by geospatial software product developers through their implementation in the GI-CAT distributed catalogue middleware. Operational Goals: Produce and deliver the project documentation. Development of a reference implementation and of a conformance test framework for the HMA catalog specifications and the implementation of support for these protocols in the GI-CAT existing open-source implementation. Slide 2

Organization Two participants: CNR-IMAA PIN (Italian National Research Council -Institute of Methodologies for Environmental Analysis) Geospatial Information for ES and GMES applications PIN (Non-Profit research center of the University of Florence – Telematics and Remote Sensing Laboratory) Architectures for IST Slide 3

Work Plan Slide 4

Deliverables List Date Deliverable T0+1M Project Management Plan T0+3M Reference implementations of HMA Catalogue Protocol OGC 06-131, and HMA Catalogue Protocol OGC 07-038 Updates of the previously generated Detailed Design Documentation of the HMA Prototype and Acceptance Documentation T0+5M Implementation of selected interfaces in GI-Cat catalogue software. T0+6M Conformance Testing Plan T0+8M Implementation and deployment of CITE conformance test scripts for the HMA catalogue interfaces. T0+11M Integration of GI-Cat implementation after successful conformance test into the HMA Prototype for demonstration of the related prototype. Slide 5