DAQ Software Support for PSEC at ANL and MTEST

Slides:



Advertisements
Similar presentations
March 24-28, 2003Computing for High-Energy Physics Configuration Database for BaBar On-line Rainer Bartoldus, Gregory Dubois-Felsmann, Yury Kolomensky,
Advertisements

23/04/2008VLVnT08, Toulon, FR, April 2008, M. Stavrianakou, NESTOR-NOA 1 First thoughts for KM3Net on-shore data storage and distribution Facilities VLV.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
MINERvA DAQ Software D. Casper University of California, Irvine.
Trigger Framework Tutorial Dan Edmunds Michigan State University 14-Apr-2009 The purpose of this talk is to present the general features of the Trigger.
Target Online Software J. Leaver 01/12/ /06/2015Imperial College 2 Target Controller Software Software for Stage 1 upgrade nearing completion –Hardware.
UA9 Collaboration H8 Sept’10 Run - Preparatory Meeting Review & Status of the Telescope DAQ and Online/Offline Software Mark Pesaresi Jonathan.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
MUON Alignment DAQ (Overview), EDR Feb Kaori Maeshima MUON Alignment DAQ (overview) Often a question is asked: Do we have a single DAQ program.
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
Microsoft Visual Basic 2005 CHAPTER 1 Introduction to Visual Basic 2005 Programming.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Excellence Publication Co. Ltd. Volume Volume 1.
06/15/2009CALICE TB review RPC DHCAL 1m 3 test software: daq, event building, event display, analysis and simulation Lei Xia.
Shuei MEG review meeting, 2 July MEG Software Status MEG Software Group Framework Large Prototype software updates Database ROME Monte Carlo.
An Example Use Case Scenario
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
LCLS Undulator Positioning Control System Shifu Xu, Joseph Xu, Josh Stein Control Group, AES/APS, ANL June 15, 2006.
Who is UMA ? Peter Fischer, I. Peric, F. Giesen, V. Kreidl Lehrstuhl für Schaltungstechnik und Simulation Institut für Technische Informatik Universität.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
1 Introduction to UniDAQ Makoto Yoshida (Osaka Univ.) MICE DAQ 2005/9/1.
18 Jan 2006DAQ - Paul Dauncey1 DAQ/Online: readiness for DESY and CERN beam tests Paul Dauncey Imperial College London.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
C. Combaret 11/10/ 2008 Status of the DHCAL m2 software C. Combaret IPNL.
Next Generation Operating Systems Zeljko Susnjar, Cisco CTG June 2015.
A First Look at the June Test Beam DAQ Hardware architecture Talk Presented 8 April, 2008 John Anderson HEP Electronics Group Argonne National Laboratory.
Fast Timing Mtg April 15 th 2009 Mike Albrow Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15 th 2009 MTest May Wed 27 th.
VICOMTECH VISIT AT CERN CERN 2013, October 3 rd & 4 th O.COUET CERN/PH/SFT DATA VISUALIZATION IN HIGH ENERGY PHYSICS THE ROOT SYSTEM.
1 23.July 2012Jörn Adamczewski-Musch TRB / HADAQ plug-ins for DABC and Go4 Jörn Adamczewski-Musch GSI, Experiment Electronics: Data Processing group EE-meeting,
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
Online Reconstruction 1M.Ellis - CM th October 2008.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
A simple Desktop DAQ for U2F readout Ulf jörnmark Physics Dept. Lund Status and plans.
Paul Scherrer Institut 5232 Villigen PSI CHEP 2006 in Mumbay / / Matthias Schneebeli ROME CHEP 2006 Presented by Matthias Schneebeli a universally.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
Online Monitoring System at KLOE Alessandra Doria INFN - Napoli for the KLOE collaboration CHEP 2000 Padova, 7-11 February 2000 NAPOLI.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
ALICE Offline Week October 4 th 2006 Silvia Arcelli & Chiara Zampolli TOF Online Calibration - Strategy - TOF Detector Algorithm - TOF Preprocessor.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Monitoring for the EMEC/HEC Combined Run in August HEC/FCAL/Combined Testbeam Meeting 16 April 2002 Rob McPherson for the UVic group (Fincke, Kanaya, Keeler,
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
DAQ Speed and Run2 Estimates April 3, Summary of FADC Development for Faster Performance NameReadoutTrigger ScalersScaler S1 (helicity gated), S2.
Sebastián Álvarez Henao.. It refers to all physical parts of a computer system; its components are: electrical, electronic, electromechanical and mechanical.
Update on the New Developments & Analysis from Hawaii Larry Ruckman & Gary Varner Instrumentation Development Laboratory (ID-Lab) University of Hawaii.
Thomas Ruf, CERN EP Experience with C++ and ROOT used in the VX Beam Test Thomas Ruf, CERN, EP  Why? Event structure for VX-data rather complex: raw hits.
W.Badgett, LArIAT Collaboration Meeting1 LArIAT Data Acquisition Status Reading out the LArIAT TPC and associated detectors and how we do so.
David Lawrence JLab May 11, /11/101Reconstruction Framework -- GlueX Collab. meeting -- D. Lawrence.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Overview of E906 Electronics, Readouts, and DAQ System E906 DAQ workshop Ting-Hua Chang (7/6 – 7/7/2009)
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Introduction to Visual Basic 2008 Programming
HERD Prototype Beam Test
Data Quality Monitoring of the CMS Silicon Strip Tracker Detector
Computing Infrastructure for DAQ, DM and SC
Tracker Software Status
CMS Pixel Data Quality Monitoring
DAQ software for SND detector
Latest Results from T979: PSec Time-of-flight
EPICS: Experimental Physics and Industrial Control System
Paul Dauncey With Jamie Ballin and Matt Noy
HEC Beam Test Software schematic view T D S MC events ASCII-TDS
Use Of GAUDI framework in Online Environment
Presentation transcript:

DAQ Software Support for PSEC at ANL and MTEST PSEC group meeting Talk Presented 8 April, 2008 Ed May HEP Division Argonne National Laboratory

Goals Design and implement Linux based DAQ system for Lecroy FERA based CAMAC system to readout and store data from 4 MCP-PH in Time-of-Flight test beam. Two systems Small 2 MCP-PH system for testing and development at ANL, using FERA camac, Wiener CC-USB serial camac interface. Larger complete system to support 4 MCP-PH and beam readout which works in MTEST computer and camac environment. This using the JY411 parallel highway. Both should use the common MTEST DAQ software framework and software with the only differences be the CAMAC driver and camac list readout. Nearline readback of stored data should read both systems.

Issues – 20 questions The 20 questions have large overlap with John’s presentation, so will not repeat duplicates. What is data to be captured? MCP-PM Beam related data eg wire-chamber, scalers … Special test or calibration data How much data? Per spill, Per run, Per conditions… At what rate? What online and/or nearline monitoring is required? Online: event dump, scaler prints, fixed raw histograms, end-of-run stats Nearline: read back of disk stored data during run and after EOR, user driven simple analysis based on ?. Makes Ntuples for Offline analysis

Issues continued Figure of merits: Can full DAQ system reliably reach required electronic resolution of 1-2 psec At what beam event/trigger rate eg ~10KHz What is the availability of MTEST computing systems available for software and hardware testing before the June test-beam run? What are lead-time issues: Is all DAQ hardware in hand? Document the “data record”, review by group Prepare time-line. Who are the principal consumers of the disk data? Are there offline and re-analysis issues after the test-beam ends.