Fri :52 Stable beams fill #2536

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Machine coordinators: R. Assmann & J. Uythoven MD coordination: R. Assmann, G. Papotti, F. Zimmermann Highlights:  v/d Meer scans:ALICE, ATLAS, CMS, LHCb.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Friday 15th June 01:11 Injection.
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Thursday morning – optics correction
Monday – recovery from MKI flashover
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC Injection and Dump Protection
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
Friday March 4th 08h32: Access for beam dump system.
Monday February 28th 8h00: Injection
Friday morning 10:30 Optics measurements and corrections.
Tuesday 9th November 10:02 Fill beams dumped
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
Saturday 7th May Sat – Sun night
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
MD Planning Fri – Sat (1. – 2.7.)
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Wednesday 23/2 Thanks CRYO!!!.
Tuesday – Morning and Evening
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 10th December - morning
Thursday Morning/Afternoon
Wednesday 26 October 2011.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Fri 20.04.12 04:52 Stable beams fill #2536 initial lumi 5.6e33 cm-2s-1 (average CMS and ATLAS) 14:40 Programmed dump, end of fill. 15:35 Injecting, but problem on TDI position. investigate with beam measurements 19-04-2012 LHC morning report

Luminosity Fill Friday 19-04-2012 LHC morning report

Peak Luminosity 19-04-2012 LHC morning report

Integrated Lumi 19-04-2012 LHC morning report

ATLAS 2012 Records 19-04-2012 LHC morning report

TDI Interlock Issue 19-04-2012 LHC morning report

TDI LVDT Variations 19-04-2012 LHC morning report

TDI Jumps in Position 19-04-2012 LHC morning report

TDI Problem: How to End Up at Wrong Pos? Y STOP Limit LVDT Wrong position LVDT Motor Motor Normal: Small difference Abnormal: Big difference  TDI can end up wrong! 19-04-2012 LHC morning report

TDI I Problem: drift of the LVDTs of TDI in point 8 outside position thresholds Suspect deformation of the jaw induced by heating during injection: the two LVDTs located at the 2 sides of each motor measure a symmetric offset corresponding to a tilt of the rod connecting the motor to the jaw. LVDT reading jumping by up to 400 um when moving to parking and back to injection again understood: motors stop driving the collimator to injection position when there is an error on the inner limit 19-04-2012 LHC morning report

TDI II Check position of the TDI jaws with respect to the beam (nominally at 6.8 sigma) with pilot bunch Opened vertical TCSG in point 7 in order not to intercept the beam Used the transverse damper to blow up the beam until seeing losses at the vertical TCP in point 7 (losses at the TCP before than at the TDI ==> hierarchy still respected) Moved the TCP away from the beam with 0.1 sigma steps (continuous beam blowup with damper) Monitored losses at the TCP and TDI Position of the TDI in sigma corresponds to the TCP position (in sigma) when losses at the 2 collimators are at the same level (then TDI losses higher than at the TCP) We found: B2 both jaws at 6.4 sigma instead of 6.8 sigma B1 left (upper jaw) at 6.2 sigma and right (lower) jaw at 6.8 sigma 19-04-2012 LHC morning report

TDI III Check angle of the TDI: We repeated the same measurments we did on March 26th (see logbook of that date) to verify if any change in the angle occured as a consequence of the warmup We found the same values within the measurment error (see plots in attachment) We believe that there is a deformation of the jaws towards (safer side) the beam as a consequence of warmup during injection (max. 0.6 sigma), we do not measure any significant variation in the angle and centre. 19-04-2012 LHC morning report

TDI Angular Alignment 19-04-2012 LHC morning report

TDI IV If the problem reoccurs: Problem not solved for the longer term cycle the TDI to parking if doesn't move anymore (hit inner limits) load the parking thresholds for TDI and cycle again repeat several times and wait for possible cooldown. Problem not solved for the longer term Especially have to understand situation when TDI is heated up and LVDT’s are drifiting Protection functionality guaranteed or not? 19-04-2012 LHC morning report

Fri/Sat 20/21.04.12 23h00 Injection for physics 1380b 00h33 Interlock during ramp IR7 HV interlock from BLM system (HV overload due to beam losses) No BLM at dump threshold Christos looked and found that the HV drop lasted for more than 1 minute and is certainly due to high losses in IR7. Losses starting at 00:28 and continuously invcreasing until the dump. Not very high losses but lasting long enough. 01h46 Injection. Reduced intensity. 02h46 Interlock during ramp Same as above 05h12 Pilot ramp for tune measurement. Losses at start of ramp 19-04-2012 LHC morning report

IR7 Modest Losses  HV Interlock 19-04-2012 LHC morning report

Other Issues Sat AM Had problems with cfv-ua47-bq frontend, and had to reboot it as the continuous tune viewer froze, and the OFB would not turn on ... Fortunately this was at injection. In YASP we again see (only at injection) momentarily missing BPM readings (crate by crate). Checked the BPMs in daimon and all appeared OK. However, we checked cs-ccr-colsa for CPU load and memory use, and observe that after the intervention on Thursday at 11:00, the memory use has again grown to ~95%, which does not seem normal. 19-04-2012 LHC morning report

Planning Ahead Sat 06:00 Start of LHC MD #1 Mon 06:00 Start of LHC technical stop (new software for orbit feedback) 19-04-2012 LHC morning report

2012 MD#1 Sat Sun 06:00 – 07:00 end of fill study (tune scan, …) 09:00 – 13:00 450 GeV: Longitudinal impedance 13:00 – 17:00 450 GeV  4 TeV: ADT (no fast blow up) 19:00 – 00:00 450 GeV  4 TeV: Collimation Sun 02:00 – 07:00 450 GeV  4 TeV: Aperture 09:00 – 17:00 450 GeV: RF batch by batch blow-up 17:00 – 23:00 450 GeV  4 TeV: BI (emittance cross calibration with ADT blowup) 01:00 – 06:00 450 GeV  4 TeV: ADT (tune compatibility)