Indicators regarding the total revenue approved for the period October 2018 – September 2019 a) Total revenue approved by ANRE is allocated by the fix.

Slides:



Advertisements
Similar presentations
Update on EU Tariff Framework Guideline Richard Miller UNC Transmission Workgroup 03/10/2013.
Advertisements

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Amendment 3/5 Workshop.
Decision Making and Relevant Information
Dr. Mohamed A. Hamada Lecturer of Accounting Information Systems 1-1 Chapter 6 Depreciation.
1 Warsaw, 16 October 2012 the system, that connects New Gas Market Model in TNC.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
1 Setting the Town of Rockland Tax Rate The Process.
Section 9.6 Sequences. Def: A sequence is a list of items occurring in a specified order. Items may be numbers, letters, objects, movements, etc.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
The Basics of Cost-Volume-Profit (CVP) Analysis Contribution margin (CM) is the difference between sales revenue and variable expenses. Next Page Click.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
C. Financing a Small Business 5.00 Explain the financial statements maintained in a small business Explain the use of sales projections.
Adjusting the Accounts.
Acct 310 Accounting Review Part II Rick Hayes, Ph.D., CPA California State University L.A.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Chapter 23 Includes Supplements 9, 10, 11. Supplement Nine Using linear regression to separate fixed and variable labor costs.
8. Linear Programming (Simplex Method) Objectives: 1.Simplex Method- Standard Maximum problem 2. (i) Greedy Rule (ii) Ratio Test (iii) Pivot Operation.
Income Measurement (Part 1)
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Introducing A New Process For Reporting Financial Data to DPI A Revised Format For The PI-1505 AC.
Auctions recommendations GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Matthew Hatch National Grid.
ERCOT Financial Summary For the Month Ended September 30, 2005
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
Lecture 2 Elasticity Costs Perfect Competition. Elasticity Elasticity is a measure of how responsive the quantity demanded is to changes in environmental.
Update from DCUSA Michael Walls DCUSA Secretariat 04 August | Energy Networks Association - DCMF.
BREAK-EVEN The break-even point of a new product is the level of production and sales at which costs and revenues are exactly equal. It is the point at.
Chapter 3 – Accruals and Adjustments
7-3 Solving Proportions (p ) Indicator  m4.
@ 2012, Cengage Learning Differential Analysis, Product Pricing, and Activity-Based Costing LO 1c – Make or Buy Decisions and Replace Equipment Decisions.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
Tariff Changes Proposed by Integrated System (IS) 2/20/2014 Carl A. Monroe EXEC VP & COO.
Partnership Accounts Session 3 Appropriation Accounts Practice Activities.
GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Vladimir Outrata GTE Executive Committee Open Subscription Window recommendations.
EXCERCISES ON BES. Compute the Break-even sales in pesos and units 1.A product line is sold at a unit selling price of P9.00. Variable cost is estimated.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
COST BEHAVIOR & COST-VOLUME-PROFIT ANALYSIS CHAPTER 19 TEACHER VERSION.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Calculating Break-Even. Break-Even Point … the point at which a business makes enough money to pay its costs and begins to make a profit Units Dollars.
Renewable energy support schemes in the Republic of Moldova
Proces Demo Project.
EU Tariffs Code Update Based on Refined Draft as of 30th October
مدیریت استراتژيک منابع انسانی
C. Financing a Small Business
Background Exit Reform Modification expected to be implemented 01 April 2009 But, decision has not yet been received Number of procedures/documents need.
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
Profit-Maximizing Level for Mini-Z
PARCA Security and Termination Amounts
Update on Exit Capacity Substitution and Revision
Information related to auction premium
Enduring NTS Exit Capacity Arrangements - Update
Parameters used on revenue aproval for period
Quantity Holders (COR2970) Presentation to UK Link Committee
Fixed cost: such as rent, utility cost, administration costs
MOD Deemed applications – User pays initial thoughts.
Ռազմավարական կառավարում
Denis Aitchison/Rob Hetherington
Information Provision for Transitional Exit Capacity
x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
The Swedish survey on turnover in the service sector
Information regarding the total revenue determined according to the provisions of Order no. 99/2018 of ANRE Chairman a) The total revenue allowed to be.
Depreciation of Fixed Assets
Group of NTS entry/exit points Types of gas transmission services
Information on accrual reconciliation account
Transmission service (approved tariffs) (approved tariffs) Variation
Presentation transcript:

Indicators regarding the total revenue approved for the period October 2018 – September 2019 a) Total revenue approved by ANRE is allocated by the fix component and by the variable component. The ratio between the fix component and the variable component of the total revenue approved for Oct. 2018-Sept. 2019 is: According to Order 10/2017 amending and supplementing Order 32/2014, from 1 October 2017, the fix component of the revenue increased to the level of 65%, used at capacity booking tariff setting, going to growing by 5% annually, until 85% of the total revenue. b) According to Order 31/2016 amending and supplementing Order 32/2014, the fix component of the total revenue approved is divided equally between the group of exit points and the group of entry points. c) The ratio between the revenue estimated to be obtained from network use inside the system, both at entry and at exit points, and the revenue estimated to be obtained from network use between the transmission systems both at entry and at exit points between October 2017 and September 2018 is: No. Indicator Approved revenue Oct. 2018-Sept. 2019 (thousand RON) Share in the total revenue 1 Fix revenue 618.088,09 70,00% 2 Variable revenue 264.894,90 30,00% * Total revenue 882.982,99   No. Indicator Approved revenue October 2018- September 2019 (thousand RON) Share in the total revenue 1 Revenue from network use inside the system 954.194,96 99,99% 2 Revenue from network use between the transmission systems 127,43 0,01% * Total revenue 882.982,99